Commit graph

4 commits

Author SHA1 Message Date
Khalim Conn-Kowlessar
48ce18dbb6 Fabric spend comes out of the shared budget before phase 2 🟩
Documents behaviour already delivered by the phase-2 structure: the leftover
budget is the envelope minus the committed fabric cost, so a heating system
the plain optimiser would buy can be priced out. Test passed on arrival.

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-07-09 11:41:22 +00:00
Khalim Conn-Kowlessar
705c86d5e6 Phase-2 candidates are valued against the post-fabric dwelling 🟥
Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-07-09 11:40:29 +00:00
Khalim Conn-Kowlessar
e880ae868c Fabric short of the target is topped up with non-fabric measures 🟥
Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-07-09 11:36:43 +00:00
Khalim Conn-Kowlessar
fcf46263bc Fabric-first scenario stops at fabric when the target is met 🟥
Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-07-09 11:36:02 +00:00