Commit graph

12 commits

Author SHA1 Message Date
Khalim Conn-Kowlessar
07f534ee11 feat(modelling): system tune-up options (standard + zone controls)
Add the system tune-up to the heating Recommendation: keep the existing wet
boiler but install better heating controls and fix the cylinder. Two competing
Options (the Optimiser picks <=1 across the whole heating rec) per the user's
two best control end-states:

- system_tune_up        — standard controls (programmer + room thermostat +
  TRVs, SAP 10.2 Table 4e code 2106)
- system_tune_up_zoned  — time-and-temperature zone control (code 2110, type 3):
  more SAP uplift for more cost

Both keep the boiler (no fuel / SAP code / flue change), set the control
ABSOLUTELY to their end-state, and apply the conditional cylinder fixes (an
80 mm jacket when under-insulated, a thermostat when absent — only when a
cylinder exists). Each control option is offered only when it genuinely improves
the existing control — standard is skipped when the control is already 2106 /
2110 / 2112, zone when already 2110 / 2112 — so neither is ever a downgrade or a
no-op.

Validated against the Elmhurst "system tune up" re-lodgements (cert 001431):
nine befores spanning controls 2101-2113 all converge to the two common afters,
proving the control overlay is absolute. The cascade pin is parametrised over
two starting controls (2101 "no control" + 2113 "room thermostat and TRVs") x
both afters, delta 0 (SAP/CO2/PE).

Wires the two MeasureTypes through contingencies (0.15), the offline catalogue
(500 / 900), the catalogue-coverage list, the report triggers, and the ARA
first-run seed.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-10 10:20:46 +00:00
Khalim Conn-Kowlessar
2413bc87da feat(modelling): solid-fuel(coal)->gas boiler upgrade + boiler_flue_type end-state
Pin the coal-boiler-with-cylinder upgrade and add the `boiler_flue_type`
end-state field. A solid-fuel (coal) boiler (fuel 11, SAP code 153) on a
mains-gas street converts to a gas condensing boiler (fuel 11->26, code 102) —
the non-gas->gas path for a solid-fuel system, eligible because code 153 is in
the wet-boiler solid-fuel range 151-161 and mains gas is present.

New `boiler_flue_type` HeatingOverlay field, routed to main_heating_details[0]
and set to 2 (room-sealed/balanced) on both boiler shapes: every relodged after
lodges flue type 2, but coal's before lodged none. The field is SAP-inert (the
cascade score is unchanged by it), so it is written purely for end-state
fidelity — the overlay now represents the installed condensing boiler's flue.
Validated via the overlay-equality unit tests.

The coal after predates the user-locked "always add a cylinder thermostat when
absent" rule, so it stale-lodged thermostat 'N'; the pin corrects it to the
rule's end-state 'Y' in-test (the gas with-cylinder after got the same
correction by re-lodging). The cylinder is already 80 mm insulated, so the
jacket is skipped and only the thermostat is added; controls (2106) are
unchanged. Cascade-pinned delta 0 (SAP/CO2/PE).

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-10 08:27:07 +00:00
Khalim Conn-Kowlessar
63dd69ff8b feat(modelling): gas combi boiler upgrade + controls-when-inadequate
Extend the gas-boiler-upgrade Option to combi (no-cylinder) dwellings and add
the controls upgrade shared by both boiler shapes. A dwelling has a cylinder or
it does not, so the one `gas_boiler_upgrade` Option is shaped per dwelling:

- no cylinder -> a gas condensing combi (Table 4b code 104), no cylinder fields
  touched;
- a cylinder  -> a regular boiler (code 102) heating it, with the conditional
  cylinder jacket/thermostat (slice 1).

Controls: bring an inadequate boiler control up to full programmer + room
thermostat + TRVs (SAP 10.2 Table 4e Group 1 code 2106). "Inadequate" = the
Group-1 codes with NO room thermostat (2101, 2102, 2107, 2108, 2109, 2111) —
these lack boiler interlock (Table 4c(2) / footnote c) p.171), so adding a room
thermostat genuinely improves SAP. Room-thermostatted (2103/2104/2105/2106/2113)
or better zone controls (2110/2112) are left unchanged — never downgraded, so
no phantom uplift. The with-cylinder cert (control 2106) is therefore untouched
and its pin still holds at delta 0.

Validated by the combi before/after re-lodgement (cert 001431, gas boiler
upgrade - no cylinder): control 2111 "TRVs and bypass" -> 2106, fan flue
False->True, SAP code 112 -> 104. Cascade-pinned delta 0 (SAP/CO2/PE). Removed
the slice-1 placeholder test asserting no boiler Option fires without a cylinder
(the combi Option now correctly fires there).

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-09 16:28:00 +00:00
Khalim Conn-Kowlessar
31c74ab500 feat(modelling): gas-boiler-upgrade-with-cylinder option in the heating rec
Add the first boiler-upgrade option to the single "Heating & Hot Water"
Recommendation (ADR-0024 expansion): a dwelling whose existing wet boiler heats
a hot-water cylinder is offered a new gas condensing boiler, with the cylinder
jacketed when under-insulated and given a thermostat when absent. One competing
Option (the Optimiser picks <=1), folded into one composite Plan line.

The end-state is read from the Elmhurst before/after re-lodgements (cert 001431,
gas boiler upgrade - with cylinder), which REVISE ADR-0024:

- Target is always a gas condensing boiler, not fuel-preserving: every after
  lodges fuel 26. Gas->gas always; a non-gas wet boiler ->gas only with a
  mains-gas connection; electric boilers are left alone (electrification is the
  upgrade path). Eligibility = wet-boiler SAP code (Table 4a/4b 101-141 /
  151-161 / 191-196) + not an electric boiler + mains gas present.
- End-state is a Table 4b SAP code, not a PCDB index: code 102 (regular boiler
  + cylinder). The calculator derives the condensing seasonal efficiency from
  the code, so no efficiency input exists or is needed.
- A modern condensing boiler has a fanned flue: the after flips
  `fan_flue_present` False->True on every cert (SAP 10.2 Table 4f flue-fan +
  the Table 4b condensing-efficiency basis). Added as a new HeatingOverlay
  field, routed to main_heating_details[0].
- Cylinder thermostat is always added when absent (user-locked); the jacket is
  the 80 mm `cylinder_insulation_type=2` end-state, applied only when the
  cylinder is below 80 mm (never downgrading a better one). Both are conditional
  per-dwelling components, not a frozen overlay.

Cascade-pinned delta-0 (SAP/CO2/PE) against the relodged after via
`_assert_overlay_reproduces_after`. NB the absolute SAP on this dwelling is
subject to a separate Summary-path mapper roof-fidelity gap (we read the roof
better-insulated than Elmhurst, scoring ~75 vs the printed 56); the gap is
identical on before+after (the boiler measure never touches the roof) so it
cancels and the pin still proves the exact heating field-delta. Tracked on the
calculator branch.

Wires the new `gas_boiler_upgrade` MeasureType through contingencies (0.26),
the offline sample catalogue, the catalogue-coverage list, and the ARA
first-run integration seed (the option fires on any mains-gas boiler+cylinder
dwelling).

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-09 16:16:46 +00:00
Khalim Conn-Kowlessar
d58ac60d29 feat(modelling): MeasureType StrEnum as the canonical measure vocabulary
Introduce domain/modelling/measure_type.py — a StrEnum with one member per
modelled measure (the 15 the generators emit). A StrEnum so each member *is*
its string value: it persists straight into the `recommendation` varchar
column, is the optimiser's group-by key, and compares equal to the catalogue /
EPC strings — so it replaces the per-generator string constants with no
persistence or optimiser change.

Repoint every generator's measure-type constant/literal to a MeasureType
member (wall, solid_wall, roof, floor, glazing, lighting, ventilation,
heating, solar). Field annotations stay `str` for now; tightening them to
MeasureType is the next slice.

This is the enum the historical engine deferred (engine.py:970
"TODO - formalise property measure types into an enum") and the vocabulary the
forthcoming `considered_measures` allowlist will speak (mirroring the legacy
`inclusions`).

Suite green: tests/domain/modelling + orchestration + harness 253 pass + 3
xfail; pyright clean on the enum + generators.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-08 19:54:04 +00:00
Khalim Conn-Kowlessar
f06a048a6f feat(modelling): ASHP option carries the composite per-dwelling cost
Slice 9 of ADR-0025 costing. _ashp_option now prices via Products.ashp_bundle_
cost(ashp_cost_inputs(epc)) instead of the flat catalogue scalar; the catalogue
row is still read for its material_id. Pinned on boiler-3: gas reuse dwelling
composes to 15600.60 (decommission 720 + pump 9720 + cylinder 2382.60 + reuse
distribution 2778) with 25% contingency.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-06 21:17:06 +00:00
Khalim Conn-Kowlessar
6f136a8d6a feat(modelling): classify ASHP existing system by fuel code
Slice 8 of ADR-0025 costing. _existing_system keys on the heating fuel code,
not the mains_gas flag -- the 001431 electric fixtures all lodge mains_gas=True
(gas available at the property) while heating electrically (fuel 30), which the
flag-based check misread as gas (and would have wrongly reused a non-existent
wet system). Electric/gas/oil/LPG map to their categories; empty details ->
NONE; unrecognised -> OTHER (gas-line fallback).

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-06 21:10:45 +00:00
Khalim Conn-Kowlessar
f182f36802 feat(modelling): ashp_cost_inputs reads a dwelling into AshpCostInputs
Slice 7 of ADR-0025 costing: the modelling-layer interpretation half of the
split. ashp_cost_inputs derives existing system (mains_gas/fuel/SAP-code),
size band (floor area <= 75 m2), design heat loss (floor_area x 0.05 -- the
chosen proxy over HLC, ADR updated), radiator count (habitable + 3, floor-area
fallback) and reusable-wet-system flag. Catalogue math (Products) stays
EPC-free. ADR-0025 updated to record the floor-area pump-sizing choice.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-06 20:59:27 +00:00
Khalim Conn-Kowlessar
9f17a27766 feat(modelling): ASHP overlay resets water_heating_code to the HP end-state
The ASHP bundle is a fixed whole-system end-state (confirmed: always the same
contractor cylinder), so the hot-water arrangement is fixed too. The overlay now
sets water_heating_code=901 ("from main system") absolutely, so a combi (909/611)
or electric (903/908) before is reset to HW-from-the-heat-pump — previously the
overlay relied on the before already lodging 901 (true for boiler-1, not in
general). No-op for the boiler-1 pin (stays 1e-4). Cascade pins for combi /
electric-with-cylinder befores await example certs. ADR-0024.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-06 17:18:58 +00:00
Khalim Conn-Kowlessar
a9da21c4b6 feat(modelling): recommend_heating offers the ASHP bundle
Adds the air-source heat-pump Option to the competing "Heating & Hot Water"
bundles. Its overlay is the absolute heat-pump end-state (fixed representative
PCDB index 101413 + category 4 + control 2210 + HWP cylinder + single meter +
off mains gas), pinned against the relodged after-cert next slice. Eligibility
is physical/planning only (ADR-0024, research-grounded): any non-flat
house/bungalow, not listed/heritage (PlanningRestrictions.blocks_internal —
conservation is offered with a caveat, not excluded), not already a heat pump;
floor area / built form / fuel / fabric are deliberately not gates. recommend_
heating gains a restrictions param (defaulted). An already-HHR electric house
now correctly gets ASHP as a better end-state.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-06 16:56:00 +00:00
Khalim Conn-Kowlessar
b3badc9b10 test(modelling): HHRSH before/after cascade pins (001431) at 1e-4
The same absolute-target HHR overlay reproduces the common relodged after from
two different base systems (existing electric storage; "no system present"
electric) — proving the bundle is a true whole-system end-state. Closes one
named gap the pin surfaced: the relodged HHR cylinder lodges
cylinder_thermostat='Y', so HeatingOverlay + _fold_heating + the HHRSH overlay
gain cylinder_thermostat (ΔSAP 0.065 -> <1e-4). ADR-0024.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-05 19:09:23 +00:00
Khalim Conn-Kowlessar
b883e75da8 feat(modelling): recommend_heating offers the HHR storage bundle
The heating Recommendation Generator (HHRSH first). Emits one "Heating & Hot
Water" Recommendation whose competing whole-system bundles the Optimiser picks
from; this slice builds the high-heat-retention storage Option. Its overlay is
the absolute HHR end-state (Table 4a code 409 + control 2404 + dual off-peak
meter + off-peak electric cylinder), pinned against the relodged after-cert in
the next slice. Eligibility translates legacy is_high_heat_retention_valid to
structured predicates (electric or off-gas main, not already HHR/heat-pump).
mains_gas and the heat emitter are unchanged by the measure, so unset. ADR-0024.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-05 19:05:02 +00:00