Records the four load-bearing design decisions from the grill-with-docs session:
standalone co-selectable rec; eligibility = lodged-only (no effectiveness gate,
electric-storage §A.2.2 no-op is the Optimiser's call); dedicated clearing
SecondaryHeatingOverlay; flat per-dwelling cost (a lodged secondary is fixed per
RdSAP, so a real decommission job, not room-scaled).
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>