Bill / EnergyBreakdown / BillDerivation / sap_fuel were under
domain/property_baseline/ only because Baseline was built first. The Modelling
stage now needs them too, so move them (and their tests) to a neutral
domain/billing/ — Fuel/FuelRates already live in the shared domain/fuel_rates/.
Avoids a modelling -> property_baseline cross-stage import and a package name
that wrongly implies ownership (ADR-0011, ADR-0014 amendment). Pure git mv +
import rewrite across 10 files; 40 billing/baseline/repo tests pass, pyright
strict clean. CONTEXT.md Bill Derivation location updated.
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
The PropertyBaselineOrchestrator now reads the current Fuel Rates snapshot
once per batch, builds a BillDerivation, and prices each scored property's
SapResult -> EnergyBreakdown into a Bill carried on PropertyBaselinePerformance
(None only on the stub no-calculator path). The Bill is flattened onto nullable
bill_* flat columns (per-section kwh+cost, standing charges, SEG credit, total)
on the postgres table, with bill_total_annual_bill_gbp as the not-null
discriminator on read-back. Section absent from the bill stays None, not 0.
Updated all four orchestrator construction sites to inject the FuelRatesRepository
port (handler + three test sites), and the FE migration doc to reflect the
prefixed columns and that they are now populated.
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
The Rebaseliner is the assemble-and-score step (ADR-0013 amendment); its
SapResult is the scored picture that Bill Derivation also prices (ADR-0014),
so rebaseline() now returns a RebaselineResult{effective, reason, sap_result}
instead of (Performance, reason). CalculatorRebaseliner sets sap_result on
both branches (the bill prices it whether lodged or calculated figures win);
StubRebaseliner returns sap_result=None (runs no calculator). Orchestrator
unpacks the result; the bill wiring lands in the next slice.
Also refreshes the stale ML-era docstrings in rebaseliner.py to the
assemble-and-score model (the calculator, not ML, is the rebaseliner
mechanism per ADR-0013).
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
Slice 5a: the promotion. Replaces StubRebaseliner in production and collapses the
shadow runner into the rebaseliner (ADR-0013 amendment).
- CalculatorRebaseliner runs Sap10Calculator on every Property:
* sap_version < 10.2 -> Effective Performance IS the calculator output
(band via Epc.from_sap_score, CO2 kg->t, PEUI rounded), reason "pre_sap10".
* sap_version >= 10.2 -> Effective = lodged (API figures on-target), and the
calculator only logs divergence (SAP>0.5, PEUI/CO2 1%) as a validation signal.
* a calculator raise propagates -> batch aborts (ADR-0012); fix the cert at once.
- Rebaseliner.rebaseline gains property_id (for the divergence log).
- LoggingCalculatorShadow / the calculator_shadow seam removed from the
orchestrator; its divergence-comparison logic now lives in the rebaseliner.
- StubRebaseliner kept (signature updated) for orchestrator/repo unit tests.
The SapResult->EnergyBreakdown adapter + BillDerivation wiring (to populate the
bill block) follow once the appliances/cooking SapResult fields land.
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
Wire Sap10Calculator into PropertyBaselineOrchestrator as a non-load-bearing
shadow runner. For each property it scores the Effective EPC beside the
load-bearing Lodged/Effective write, catches any strict-raise -> log.error
(never aborts the batch), and on success log.warning's divergence from Lodged:
SAP |continuous - lodged| > 0.5; PEUI/CO2 > 1% relative (CO2 after kg->tonnes).
Every line is tagged with sap_version so SAP-10.2 signal separates from
older-spec drift (ADR-0010 Validation Cohort).
Per ADR-0013, Calculated SAP10 Performance is not a persisted third value-set:
effective = calculated in every baselining scenario, so the calculator IS the
mechanism that produces Effective Performance (the Rebaseliner). It runs in
shadow only while being hardened; when overrides/estimation land it is promoted
to drive Effective and the failure posture flips to abort (ADR-0012, calculator
now load-bearing). No table change.
- ADR-0013 + CONTEXT (Calculated SAP10 Performance / Effective Performance /
Rebaselining) record the decision.
- CalculatorShadow port + LoggingCalculatorShadow + Calculator protocol.
- FakeCalculatorShadow for orchestrator unit tests.
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>