The PropertyBaselineOrchestrator now reads no Lodged Performance off a predicted
Property's neighbour-synthesised EPC: lodged is None when source_path is
'predicted', so no phantom lodged figure is manufactured. The Effective half is
unchanged. Rebaseliner port + PropertyBaselinePerformance.lodged widen to
Optional; the pristine-cert paths assert non-None (lodged is None only for a
predicted Property, which is always physical_state_changed).
Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
Covers the 10 audited "community CHP and boilers" properties (302) alongside the
2,210 "community boilers" (301) — both were mis-bucketed to Gas CPSU.
Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
Generalise the room-heater category-10 + conservative-control drag to cover both
solid and oil families; oil's natural fuel is heating oil (28).
Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
Heat pump drags category 4 + electricity (29). Meter stays single-rate: a heat
pump does not imply an off-peak tariff the way storage/CPSU do (SAP §12 Rule 3
is conditional), so forcing Dual would mis-bill it.
Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
Solid fuel is ambiguous across coal/wood/smokeless/pellets, so the overlay
defaults to house coal (33, the most common) when no main_fuel override is
given; a specific solid-fuel override still wins by last-wins composition.
Updates the ADR-0041 natural-fuel amendment accordingly (every archetype drags
a natural fuel; solid defaults to coal).
Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
A landlord heating override DESCRIBES the dwelling, so its assumed off-peak meter
(Dual/E7) is a coherent default — it must not downgrade a cert that already
lodges a more-off-peak meter (e.g. property 709874's 24-hour all-low tariff). The
overlay opts in via keep_existing_off_peak_meter; _fold_heating then keeps the
cert's meter when both it and the desired meter are off-peak. Heating MEASURES
build HeatingOverlay directly and leave the flag False, so they still re-meter
for real (Elmhurst re-lodges 18-hour -> Dual on a storage install) — the cascade
pins stay green.
Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
System-built is RdSAP code 6, colliding with the gov-EPC code-6 basement
sentinel that main_wall_is_basement falls back to. The wall overlay now pins
wall_is_basement=False for system-built, mirroring the gov-API mapper's
_clear_basement_flag_when_system_built, so the override no longer adds a phantom
basement (which inflated both wall and ground-floor heat loss).
Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
Electric room heaters (691) get a Dual meter from the overlay (not single-rate):
an all-electric room-heater dwelling realistically bills on Economy 7, and the
§12 dispatch then applies a high/low split rather than a single-rate over-penalty.
Overlay owns its assumed-meter policy via _ASSUMED_DUAL_METER_CODES (the §12
off-peak systems + room heaters), keeping OFF_PEAK_IMPLYING_HEATING_CODES pure.
Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
'Electric room heaters' archetype -> SAP Table 4a code 691 (panel/convector/
radiant), on a single-rate meter (691 is not off-peak-implying, unlike storage).
Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>