Commit graph

100 commits

Author SHA1 Message Date
Jun-te Kim
4f45eeb3e9 save 2026-05-07 15:55:44 +00:00
Khalim Conn-Kowlessar
181c8069a1 adding baseline heater cost 2026-05-07 12:19:10 +01:00
Khalim Conn-Kowlessar
354c8fcb27 fixing property.property and passing task id 2026-03-30 17:51:13 +01:00
Khalim Conn-Kowlessar
69af82a5db cleaning up data dictionary references 2026-03-19 18:47:39 +00:00
Khalim Conn-Kowlessar
84d4263d9a removing data 2026-03-18 19:17:22 +00:00
Khalim Conn-Kowlessar
ac749e427e first implementation for sloping ceiling insulation 2026-01-26 19:06:50 +00:00
Khalim Conn-Kowlessar
64eb2e2f20 added in basic process for sloping ceiling 2026-01-26 17:49:56 +00:00
Khalim Conn-Kowlessar
0ad3f09902 refactoring roof recommendations logic 2026-01-26 12:25:51 +00:00
Khalim Conn-Kowlessar
4ae439ddd3 fixed costs tests 2026-01-22 09:45:32 +00:00
Khalim Conn-Kowlessar
aa515a9797 added new pricing for air source heat pump 2025-12-24 12:58:24 +08:00
Khalim Conn-Kowlessar
b881c8358e new solid floor pricing mechanism 2025-12-23 09:53:03 +08:00
Khalim Conn-Kowlessar
f6ff037994 temp clearing endpoint 2025-11-16 16:26:23 +08:00
Khalim Conn-Kowlessar
cd52d1b9e6 debugging funding package upload to leds + fixing gbis as best recommendation 2025-08-26 17:29:10 +01:00
Khalim Conn-Kowlessar
a9fd725453 debugging etl clean 2025-08-22 01:34:16 +01:00
Khalim Conn-Kowlessar
dba33be174 finishing implementing solar 2025-08-18 16:38:00 +01:00
Khalim Conn-Kowlessar
1579d010ee updated the costings with new products and measurse specific contingencies 2025-08-18 16:29:52 +01:00
Khalim Conn-Kowlessar
ab150c799d updating heating systems for innovation 2025-08-18 12:55:44 +01:00
Khalim Conn-Kowlessar
c3f8aaaca1 added innovation rate to hhrsh and heating controls 2025-08-18 12:47:58 +01:00
Khalim Conn-Kowlessar
e7eb9b7aed working on sfr updates for principal 2025-06-25 14:08:22 +01:00
Khalim Conn-Kowlessar
f687988180 Adding logic for a heat pump when the property is large enough and handling an edge case for dual heating 2025-06-22 17:11:45 +01:00
Khalim Conn-Kowlessar
2967ea840d fixing bug in leds 2025-05-16 15:44:06 +01:00
Khalim Conn-Kowlessar
714d675c8d Updating costing methodology for leds 2025-05-16 15:37:27 +01:00
Khalim Conn-Kowlessar
cf00d38b15 working on thrive and added method for calculating led costs given an isntaller quote 2025-05-16 15:19:22 +01:00
Khalim Conn-Kowlessar
1d48ede60e fixing ventilation negative kwh 2025-03-23 18:48:22 +00:00
Khalim Conn-Kowlessar
7111f1a43a implemented required measures for mod 2025-03-19 18:50:21 +00:00
Khalim Conn-Kowlessar
292da782a0 changing simulation methodology to use corrected floor area 2025-03-16 18:47:41 +00:00
Khalim Conn-Kowlessar
c2062507ca implementing mv 2025-03-15 17:34:55 +00:00
Khalim Conn-Kowlessar
0fad758fbb added unit tests 2025-01-23 20:57:27 +00:00
Khalim Conn-Kowlessar
75c5f0a712 Added VAT to ashp and solar pv 2024-12-18 21:26:33 +00:00
Khalim Conn-Kowlessar
c47d1db2ba basic estimate for cost of cylinder 2024-10-08 18:34:42 +01:00
Khalim Conn-Kowlessar
703cdcf1cb added cost for dual immersion heater 2024-10-08 18:25:45 +01:00
Khalim Conn-Kowlessar
022bf6742c adding new cosing for ashp 2024-10-07 15:59:44 +01:00
Khalim Conn-Kowlessar
e6fc34741c update flat roof insulation recommendations 2024-09-24 14:35:35 +01:00
Khalim Conn-Kowlessar
0c6d8121c2 updating costing for loft insulation 2024-09-24 10:58:59 +01:00
Khalim Conn-Kowlessar
d0f7c7f63a updating cwi costs 2024-09-23 16:08:06 +01:00
Khalim Conn-Kowlessar
fe86886adc refactoring costing function for solid wall insulation| 2024-09-23 15:57:06 +01:00
Khalim Conn-Kowlessar
767d0d3132 updating costing methodology for new installer costs 2024-09-23 15:55:07 +01:00
Khalim Conn-Kowlessar
503a19291d updating solar pv costs 2024-09-18 19:12:02 +01:00
Khalim Conn-Kowlessar
8a09a29956 adding new installer costs for solar pv to cost class 2024-09-18 18:53:04 +01:00
Khalim Conn-Kowlessar
910d8a5f38 minor modifications to enable vectis portfolio 2024-09-09 22:34:45 +01:00
Khalim Conn-Kowlessar
ea9086ba37 optimise fetching of spatial data 2024-08-05 18:06:16 +01:00
Khalim Conn-Kowlessar
92fcd080a8 integrating the non-intrusive recommendations for ashp and solarpv into backend engine 2024-08-05 15:35:16 +01:00
Khalim Conn-Kowlessar
027aa79a0b adding bypass heating control recommendation 2024-08-01 12:44:07 +01:00
Khalim Conn-Kowlessar
b20e00a736 wip integrating additional recs with new code 2024-07-11 08:35:34 +01:00
Khalim Conn-Kowlessar
a43c9e82d3 reverting electric boiler recs, adding cylinder thermostat rec 2024-07-10 01:29:11 +01:00
Khalim Conn-Kowlessar
c112d23c67 removed electric boiler rec 2024-07-10 01:10:19 +01:00
Khalim Conn-Kowlessar
e12ff81aaa added labour hours and days to building level costing for solar 2024-07-09 23:24:40 +01:00
Khalim Conn-Kowlessar
88812a5524 done with vander elliot non-intrusives portfolio 2024-06-27 10:53:55 +01:00
Khalim Conn-Kowlessar
8a5e98d3ba udpating costing with installer quotes 2024-06-26 16:31:57 +01:00
Khalim Conn-Kowlessar
743422e8fe Parity comparison investiagtion, stonewater wip 2024-06-11 18:23:19 +01:00