Commit graph

15 commits

Author SHA1 Message Date
Khalim Conn-Kowlessar
d9c7638b3c test(modelling): ASHP from a system gas boiler with an existing cylinder
Pins the cylinder-OVERWRITE path the earlier ASHP pins did not exercise:
boiler-1/boiler-2 added a cylinder where none existed, whereas boiler-3's
before is a mains-gas regular boiler (SAP code 101) that already heats its
own cylinder (size 2 / insulation type 2 / 80 mm). The fixed _ASHP_OVERLAY
overwrites it to the heat-pump cylinder (size 4 / insulation type 1 / 50 mm)
and switches the dwelling off mains gas (fuel 26->30, code 101->index 101413
+ category 4). The existing overlay reproduces the re-lodged after at delta 0
on SAP / CO2 / primary energy -- no overlay change needed; immersion_heating_
type is None in both, so that field (the electric-with-cylinder case) is
untouched here.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-06 18:20:58 +00:00
Khalim Conn-Kowlessar
ec76acc3d8 test(modelling): ASHP pin from a gas boiler with instantaneous HW + fuel tripwire
Second ASHP before/after (boiler 2): a gas boiler whose hot water is electric/
instantaneous (water-heating SAP code 909, no cylinder). The cascade pin passes
at 1e-4, exercising the overlay's water_heating_code reset 909 -> 901 that the
boiler-1 pin (already 901) did not. (After lodges control 2209 vs the overlay's
2210 — SAP-equivalent zone controls.)

Adds an xfail(strict) tripwire test_gas_boiler_instant_hw_before_baselines: the
raw before is not scorable on its own because the mapper maps the 'BGB' gas-
boiler EES code to an empty main_fuel_type (boiler-1's 'RGE' resolves to 26),
so Sap10Calculator raises MissingMainFuelType. Harmless to the pin (the overlay
overwrites fuel -> 30); flips green when the mapper derives mains gas from the
gas-boiler SAP code (separate mapper-front fix). ADR-0024.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-06 17:40:25 +00:00
Khalim Conn-Kowlessar
a1fc697d93 test(modelling): ASHP before/after cascade pin (001431) at 1e-4
A typical mains-gas combi house re-lodged as an air-source heat pump closes at
1e-4 (gas-boiler 1 example from the technical specialist). Closes one named gap
the pin surfaced: a whole-system replacement to a PCDB-indexed system left the
old Table 4a sap_main_heating_code (104) beside the new heat-pump index, and the
stale code won the calculator's efficiency dispatch (hot water billed at boiler
not HP efficiency, ΔSAP 3.98). _fold_heating now enforces the mutual exclusion
of the two efficiency anchors (setting an index clears the SAP code and vice
versa). Also fixed a pre-existing pyright annotation in the lighting applicator
test. ADR-0024.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-06 17:01:40 +00:00
Khalim Conn-Kowlessar
b3badc9b10 test(modelling): HHRSH before/after cascade pins (001431) at 1e-4
The same absolute-target HHR overlay reproduces the common relodged after from
two different base systems (existing electric storage; "no system present"
electric) — proving the bundle is a true whole-system end-state. Closes one
named gap the pin surfaced: the relodged HHR cylinder lodges
cylinder_thermostat='Y', so HeatingOverlay + _fold_heating + the HHRSH overlay
gain cylinder_thermostat (ΔSAP 0.065 -> <1e-4). ADR-0024.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-05 19:09:23 +00:00
Khalim Conn-Kowlessar
ca397e1e3f test(modelling): lighting before/after cascade pins (001431) at 1e-4
Slice 3 of the lighting generator (ADR-0023): two real Elmhurst before/after
cascade pins, sourced from the low_energy_lighting recommendation folder. Both
close cleanly at 1e-4 with NO xfail — lighting changes only bulb counts →
Appendix L (232), no fabric coupling (contrast glazing's draught-proofing).
  - zero existing LEDs: 20 incandescent → 20 LED
  - some existing LEDs: 5 LED + 15 incandescent → 20 LED (partial-upgrade path)
The overlay-emits-correct-counts assertion lives in the Slice 2 unit tests.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-05 12:27:36 +00:00
Khalim Conn-Kowlessar
3d738bd4c6 test(fixtures): add glazing before/after certs (001431) for the pin slices
The double_glazing / secondary_glazing Elmhurst before→after Summaries the
glazing generator's cascade pins will use (ADR-0022). NB: these don't parse
yet — cert 001431 lodges several unmapped glazing labels ("Secondary glazing",
"Secondary glazing - Normal emissivity", "Triple pre 2002", truncated
"Double…"/"Triple…" variants) that the mapper must cover first.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-05 07:54:43 +00:00
Khalim Conn-Kowlessar
13b18ce9fb feat(modelling): roof dispatcher insulates a flat roof
Slice 3 (ADR-0021). The dispatcher gains a flat-roof branch: a "flat"
roof_construction_type with no lodged thickness (uninsulated → None on the
Elmhurst path) gets a single flat_roof_insulation Option whose overlay raises
roof_insulation_thickness to 200 mm — tested before the loft fallback so a flat
roof's None doesn't trip the loft trigger. Pinned against the Elmhurst
before→after cert at 1e-4. Golden cohort roof firing unchanged (none across 57).

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-04 21:16:00 +00:00
Khalim Conn-Kowlessar
7d40cddf3b feat(modelling): fold loft into the roof dispatcher; thatch routes to loft
Slice 2 (ADR-0021). `recommend_roof_insulation` now owns the loft branch as the
fallback — a plain pitched loft, a thatched roof (the covering doesn't block
insulating the loft floor), or an unlodged roof type all take loft (joist)
insulation at 300 mm when `roof_insulation_thickness == 0`. Sloping is tested
first; a no-access roof gets nothing. Retired the standalone
`recommend_loft_insulation`; the orchestrator and its tests now call the
dispatcher.

Pinned: thatch before→after (None→300) reproduces at 1e-4; the existing loft pin
still holds through the dispatcher. Behaviour-preserving on the golden cohort
(roof measure unchanged: none across all 57) — the dispatch is strictly more
precise (won't fire loft on a sloping/no-access roof).

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-04 21:12:01 +00:00
Khalim Conn-Kowlessar
6484610b6c feat(modelling): recommend_roof_insulation insulates a sloping ceiling
Slice 1 of the roof-insulation generator (ADR-0021). New `recommend_roof_insulation`
dispatcher keys on the `roof_construction_type` string: a "sloping ceiling" roof
that is uninsulated (roof_insulation_thickness 0/None) gets a single
`sloping_ceiling_insulation` Option whose overlay raises roof_insulation_thickness
to 100 mm. Pinned against the Elmhurst before→after cert 001431 at 1e-4.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-04 21:02:06 +00:00
Khalim Conn-Kowlessar
ea4534f3af feat(modelling): system-built walls take EWI+IWI (blocked on basement-code fix)
System-built (precast/no-fines concrete) takes both solid-wall Options like
solid brick (ADR-0019), keyed on `wall_construction == 6` (WALL_SYSTEM_BUILT,
Elmhurst `SY`). A basement-suitability guard (`main_wall_is_basement`) is added
since a below-ground basement wall is never EWI/IWI-suitable.

This is currently inert: `B Basement wall` also maps to 6 (mapper.py:2100) and
`main_wall_is_basement` is derived as `wall_construction == 6`, so every code-6
wall reads as basement and is guarded out — the live cohort is unchanged. The
system-built EWI/IWI cascade pin is committed as a strict-xfail tripwire that
flips green the moment the calculator disambiguates system-built from basement
(MAIN wall_construction==6 with main_wall_is_basement False). `wall_construction
== 8` is Park home, not system-built — not keyed.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-04 18:26:08 +00:00
Khalim Conn-Kowlessar
ac78771258 feat(modelling): solid-wall generator offers IWI-only for timber frame
Slice 2b. Timber frame (wall_construction=5) takes internal wall insulation but
not external (not constructable — ADR-0019), so the generator offers IWI only.
Cascade pin: the IWI Option reproduces the re-lodged timber-frame after at
abs(diff) <= 1e-4 (general Table 6 insulation-thickness bucket, not the solid-
brick documentary path).

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-04 15:33:46 +00:00
Khalim Conn-Kowlessar
68aa80c174 feat(modelling): overlay models solid-wall insulation (IWI/EWI), pinned
Slice 1 of solid-wall insulation. BuildingPartOverlay gains a
wall_insulation_thickness field; the generic applicator already folds it onto
SapBuildingPart by name. With wall_insulation_type=1 (EWI) / 3 (IWI) + 100 mm,
the calculator derives the post-insulation U-value (§5.8 documentary path,
λ=0.04 default) — and for IWI also lowers the thermal-mass parameter. Two new
Elmhurst before/after cascade pins (solid-brick EWI + IWI, cert 001431)
reproduce the re-lodged after at abs(diff) <= 1e-4 across SAP/CO2/PE.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-04 15:11:26 +00:00
Khalim Conn-Kowlessar
a0b6a952c3 feat(modelling): floor insulation-type overlay field + cascade pins (#1159)
Completes #1159 end-to-end with solid and suspended-floor before/after
cascade pins on cert 001431, both closing at delta 0.000000.

Adds floor_insulation_type_str to BuildingPartOverlay (the generic
field-fold applicator picks it up with no change) and has
recommend_floor_insulation set it to "Retro-fitted". Insulating an
as-built floor re-lodges its insulation as retro-fitted; the calculator
keys on this for a suspended timber floor's sealed/unsealed
determination (cert_to_inputs.py: "retro" + no U-value supplied →
sealed). Without it the suspended-floor cascade left a +1.40 SAP gap
(the floor stayed "unsealed", wrong U-value); with it the cascade
closes exactly. Solid floors are unaffected by the seal logic and stay
at delta 0; both Elmhurst after-certs lodge "Retro-fitted", so setting
it uniformly is faithful.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-03 09:41:54 +00:00
Khalim Conn-Kowlessar
44d62c0c9b feat(modelling): loft overlay 270→300 mm + Elmhurst cascade pin (#1158)
Completes #1158 end-to-end. recommend_loft_insulation now emits a
300 mm overlay (was 270 mm). The Elmhurst before/after re-lodgement of
the loft-insulation measure on cert 001431 lodges the after-cert at
300 mm roof insulation; pinning before→overlay→after requires the
overlay to match that depth — at 270 mm the cascade left a +0.173 SAP
residual, at 300 mm it closes at delta 0.000000 on SAP/CO2/PE.

Adds test_loft_overlay_reproduces_the_relodged_after and updates the
roof generator unit test's thickness assertion to 300.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-03 09:39:21 +00:00
Khalim Conn-Kowlessar
4c0a907a54 test(modelling): Elmhurst before/after cascade pin for cavity wall (#1154)
Closes #1154 — the Package Scorer's Elmhurst cascade pin. Drives
recommend_cavity_wall on the parsed `before` Summary, scores its
Option's overlay through PackageScorer, and asserts delta 0 (abs<=1e-4
on SAP/CO2/PE) vs the calculator's score on the re-lodged `after`
Summary.

Key finding: the handover's stated parser gate (parse_site_notes_pdf
throwing 'Manufacturer' on cert 001431) does NOT block these pins. The
Elmhurst recommendation Summaries route cleanly through the same
ElmhurstSiteNotesExtractor + EpcPropertyDataMapper chain the worksheet
e2e fixtures use (_elmhurst_worksheet_001431.build_epc). The Textract
path's window bug is unrelated and unused here.

The before→after field change is exactly wall_insulation_type 4
(uninsulated) → 2 (filled cavity), which is precisely the overlay
recommend_cavity_wall emits; the cascade closes at delta 0.000000 on
all three metrics. Before/after Summaries mirrored into
tests/domain/modelling/fixtures/ so the pin does not depend on the
unstaged workspace.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-03 09:36:53 +00:00