..
specs
docs: handover for Table 3a no-keep-hot continuation + SAP 10 spec PDFs
2026-05-28 08:29:12 +00:00
AGENT_GUIDE.md
docs: add AGENT_GUIDE.md — fresh-start onboarding for the SAP calculator
2026-06-02 21:32:29 +00:00
BRIEF_APPENDIX_H_EN_15316_RESEARCH.md
Slice S0380.74: Appendix H (H7) U3.3 monthly-integrated convention closes 1.81× over-count
2026-05-29 18:02:35 +00:00
HANDOVER_38_CERT_COHORT_EXPANSION.md
docs: handover — Summary + API cohort expansion to 38 additional certs
2026-05-27 22:22:13 +00:00
HANDOVER_0240_CLOSURE.md
docs: add full 0240 worksheet input spec to the closure handover
2026-06-03 17:13:46 +00:00
HANDOVER_API_PATH_CLOSURE.md
docs: handover after S0380.31..S0380.38 — cohort-2 Summary path COMPLETE, thread 4 next
2026-05-28 16:34:36 +00:00
HANDOVER_API_SAMPLE_ACCURACY.md
docs: handover — fold in S0380.232-234 (case-19 PV closure) + open causes
2026-06-04 23:06:20 +00:00
HANDOVER_CERT_0380_HW_CASCADE.md
docs: handover — cert 0380 HW cascade (slices 102a-e shipped, MIT residual deferred to next session)
2026-05-27 12:42:44 +00:00
HANDOVER_CERT_0380_MIT_CASCADE.md
docs: handover refresh — cohort closed to spec-precision floor
2026-05-27 17:03:09 +00:00
HANDOVER_CERT_0380_SUMMARY_PATH.md
docs: handover — start cert 0380 Summary → EPC → calculator path
2026-05-27 17:23:10 +00:00
HANDOVER_CERT_000565_COST_CASCADE.md
docs: handover + next-agent prompt for S0380.64..69
2026-05-29 10:32:32 +00:00
HANDOVER_CERT_9501_AND_HEATPUMPS.md
docs: update handover — cert 0380 API path Δ -18.37 → +2.92 SAP
2026-05-26 22:46:30 +00:00
HANDOVER_COHORT_2_PRECISION_FLOOR.md
docs: handover for cohort-2 closure + precision-floor next steps
2026-05-28 10:33:17 +00:00
HANDOVER_FRESH_API_DEBUG.md
docs: handover — S0380.218 closed the "with api 3" pair (both clean)
2026-06-04 12:36:23 +00:00
HANDOVER_GLAZING_WINDOW_EXTRACTION.md
docs: handover for the open window-extraction work on the double_glazing fixture
2026-06-05 09:47:29 +00:00
HANDOVER_GOLDEN_COVERAGE.md
docs: extend handover with Elmhurst-only path + 000565 extended test case
2026-05-28 21:03:23 +00:00
HANDOVER_GOLDEN_RESIDUALS.md
docs: handover after S0380.39..S0380.43 — cohort-2 API path 38/38 closed
2026-05-28 17:22:55 +00:00
HANDOVER_MAPPER_BUGS.md
docs: correct 2130/7536 drive-to-zero diagnosis (distinct causes, not shared)
2026-06-04 00:14:10 +00:00
HANDOVER_NEXT.md
refactor: move docs/sap-spec/ contents into domain/sap10_calculator/
2026-05-26 13:17:18 +00:00
HANDOVER_POST_4_CERT_EMPIRICAL.md
Slice S0380.74: Appendix H (H7) U3.3 monthly-integrated convention closes 1.81× over-count
2026-05-29 18:02:35 +00:00
HANDOVER_POST_S0380_69.md
docs: handover + next-agent prompt for S0380.64..69
2026-05-29 10:32:32 +00:00
HANDOVER_POST_S0380_73_APPENDIX_H_BLOCKED.md
docs: handover + research brief + next-agent prompt for cert 000565 Appendix H
2026-05-29 16:18:31 +00:00
HANDOVER_POST_S0380_76.md
docs: handover + next-agent prompt post S0380.74..76
2026-05-29 20:51:02 +00:00
HANDOVER_POST_S0380_80.md
docs: handover + next-agent prompt post S0380.77..80 (cert 000565 §4 HW EXACT)
2026-05-29 22:18:41 +00:00
HANDOVER_POST_S0380_84.md
docs: handover + next-agent prompt post S0380.81..84 (Table 32 default + Table 12a Grid 2 CO2 + RR fold-in)
2026-05-29 23:33:18 +00:00
HANDOVER_POST_S0380_90.md
docs: handover + next-agent prompt post S0380.85..90 (BP main-wall closure + SH-channel discovery + strict-raise series)
2026-05-30 09:52:35 +00:00
HANDOVER_POST_S0380_95.md
docs: handover + next-agent prompt post S0380.91..95 (party-wall + AP4/MEV + §5.14 floor + RIR insulation + Detailed-RR residual)
2026-05-30 14:26:49 +00:00
HANDOVER_POST_S0380_103.md
docs: handover + next-agent prompt post S0380.96..103 (RIR Unknown + §9 floor + MEV PCDB arc + HP-on-E7 cost split)
2026-05-30 16:13:33 +00:00
HANDOVER_POST_S0380_109.md
docs: handover + next-agent prompt post S0380.105..109 (MEV trifecta + window routing + Connected gable + §5.7/5.8 brick formula)
2026-05-30 18:16:16 +00:00
HANDOVER_POST_S0380_114.md
docs: handover + next-agent prompt post S0380.110..114 (cert 000565 SAP exact at 1e-4)
2026-05-30 19:53:45 +00:00
HANDOVER_POST_S0380_124.md
docs: handover + next-agent prompt post S0380.115..124
2026-05-30 22:15:22 +00:00
HANDOVER_POST_S0380_130.md
docs: handover + next-agent prompt post S0380.125..130
2026-05-31 09:05:24 +00:00
HANDOVER_POST_S0380_137.md
docs: handover + next-agent prompt post S0380.131..137
2026-05-31 17:12:10 +00:00
HANDOVER_POST_S0380_140.md
docs: handover update — +2.5 SAP cluster is heterogeneous, not a shared cascade gap
2026-05-31 19:20:43 +00:00
HANDOVER_POST_S0380_143.md
docs: handover post S0380.141..143 (pcdb 1 closure via §9.4.11 + §4 cylinder gates + RdSAP 10 Table 29 inaccessible-cylinder insulation defaults)
2026-05-31 21:06:11 +00:00
HANDOVER_POST_S0380_145.md
docs: handover post S0380.141..145
2026-05-31 21:55:53 +00:00
HANDOVER_POST_S0380_147.md
docs: handover post S0380.146..147
2026-06-01 08:26:04 +00:00
HANDOVER_POST_S0380_149.md
docs: handover post S0380.146..149
2026-06-01 09:18:38 +00:00
HANDOVER_POST_S0380_152.md
docs: handover post S0380.150..152
2026-06-01 13:03:55 +00:00
HANDOVER_POST_S0380_155.md
docs: handover post S0380.153..155
2026-06-01 16:01:52 +00:00
HANDOVER_POST_S0380_159.md
docs: handover post S0380.156..159
2026-06-01 22:30:59 +00:00
HANDOVER_POST_S0380_163.md
docs: handover post S0380.160..163
2026-06-02 08:51:21 +00:00
HANDOVER_POST_S0380_164.md
docs: handover post S0380.164
2026-06-02 09:27:54 +00:00
HANDOVER_POST_S0380_169.md
docs: handover post S0380.164..169
2026-06-02 10:25:24 +00:00
HANDOVER_POST_S0380_173.md
docs: handover post S0380.170..173
2026-06-02 12:13:34 +00:00
HANDOVER_POST_S0380_176.md
docs: handover post S0380.174..176
2026-06-02 13:42:42 +00:00
HANDOVER_POST_S0380_179.md
docs: handover post S0380.177..179 + CI/test-move infra
2026-06-02 17:21:50 +00:00
HANDOVER_POST_S0380_189.md
docs: handover post S0380.189 — TMP/Table 22 + the two open follow-ups
2026-06-02 22:05:41 +00:00
HANDOVER_POST_S0380_195.md
docs: handover post S0380.195 — 6035 OPEN, API-mapper roof/RR over-count lead
2026-06-03 10:14:17 +00:00
HANDOVER_POST_S0380_200.md
docs: correct S0380.200 handover — interlock was already done; S0380.201 closed pumps
2026-06-03 13:52:13 +00:00
HANDOVER_PRECISION_FLOOR_CLOSED.md
docs: handover after S0380.26-30 precision-floor closure
2026-05-28 12:55:45 +00:00
HANDOVER_PV_BETA_SPLIT.md
docs: PV β-split phase COMPLETE handover (6/6 slices)
2026-05-28 19:28:34 +00:00
HANDOVER_TABLE_3A_NO_KEEP_HOT.md
docs: handover for Table 3a no-keep-hot continuation + SAP 10 spec PDFs
2026-05-28 08:29:12 +00:00
NEXT_AGENT_PROMPT.md
docs: refresh NEXT_AGENT_PROMPT for PV β-split slices 4-6
2026-05-28 18:47:08 +00:00
NEXT_AGENT_PROMPT_POST_S0380_69.md
docs: handover + next-agent prompt for S0380.64..69
2026-05-29 10:32:32 +00:00
NEXT_AGENT_PROMPT_POST_S0380_73.md
docs: handover + research brief + next-agent prompt for cert 000565 Appendix H
2026-05-29 16:18:31 +00:00
NEXT_AGENT_PROMPT_POST_S0380_76.md
docs: handover + next-agent prompt post S0380.74..76
2026-05-29 20:51:02 +00:00
NEXT_AGENT_PROMPT_POST_S0380_80.md
docs: handover + next-agent prompt post S0380.77..80 (cert 000565 §4 HW EXACT)
2026-05-29 22:18:41 +00:00
NEXT_AGENT_PROMPT_POST_S0380_84.md
docs: handover + next-agent prompt post S0380.81..84 (Table 32 default + Table 12a Grid 2 CO2 + RR fold-in)
2026-05-29 23:33:18 +00:00
NEXT_AGENT_PROMPT_POST_S0380_90.md
docs: handover + next-agent prompt post S0380.85..90 (BP main-wall closure + SH-channel discovery + strict-raise series)
2026-05-30 09:52:35 +00:00
NEXT_AGENT_PROMPT_POST_S0380_95.md
docs: handover + next-agent prompt post S0380.91..95 (party-wall + AP4/MEV + §5.14 floor + RIR insulation + Detailed-RR residual)
2026-05-30 14:26:49 +00:00
NEXT_AGENT_PROMPT_POST_S0380_103.md
docs: handover + next-agent prompt post S0380.96..103 (RIR Unknown + §9 floor + MEV PCDB arc + HP-on-E7 cost split)
2026-05-30 16:13:33 +00:00
NEXT_AGENT_PROMPT_POST_S0380_109.md
docs: handover + next-agent prompt post S0380.105..109 (MEV trifecta + window routing + Connected gable + §5.7/5.8 brick formula)
2026-05-30 18:16:16 +00:00
NEXT_AGENT_PROMPT_POST_S0380_114.md
docs: handover + next-agent prompt post S0380.110..114 (cert 000565 SAP exact at 1e-4)
2026-05-30 19:53:45 +00:00
NEXT_AGENT_PROMPT_POST_S0380_124.md
docs: handover + next-agent prompt post S0380.115..124
2026-05-30 22:15:22 +00:00
NEXT_AGENT_PROMPT_POST_S0380_130.md
docs: handover + next-agent prompt post S0380.125..130
2026-05-31 09:05:24 +00:00
NEXT_AGENT_PROMPT_POST_S0380_137.md
docs: handover + next-agent prompt post S0380.131..137
2026-05-31 17:12:10 +00:00
SAP_CALCULATOR.md
docs: add AGENT_GUIDE.md — fresh-start onboarding for the SAP calculator
2026-06-02 21:32:29 +00:00