mirror of
https://github.com/Hestia-Homes/Model.git
synced 2026-07-12 13:29:04 +00:00
`from_sap_schema_17_1` hardcoded is_dwelling_export_capable=False, so SAP 10.2 Appendix M1 zeroed the PV export credit on every export-capable full-SAP cert. Cert 0380-3044-6070-2305-5925 (property 741840, PRD #1435 WS3) now reproduces its lodged 92 exactly (was 89); the existing 19.1.0 pin 10096028301 closes its documented -1 residual (84 -> 85 = lodged). The full-SAP top-level pv_connection is deliberately NOT carried: its enum disagrees with the RdSAP one the calculator gates on. Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com> |
||
|---|---|---|
| .. | ||
| epc | ||
| __init__.py | ||
| datatypes.py | ||
| enums.py | ||