Model/domain
Khalim Conn-Kowlessar 3684a142ac S0380.231: Dual-meter electric room heaters resolve to 10-hour tariff (RdSAP 10 §12 Rule 3)
RdSAP 10 §12 (PDF p.62) Dual-meter dispatch: "the choice between 7-hour
and 10-hour is made by the main heating type ... if the main system is a
direct-acting electric boiler (191), or electric room heaters ... it is
10-hour tariff." The electric room-heater codes — Table 4a 691 (panel/
convector/radiant), 692 (fan), 693 (portable), 694 (water-/oil-filled),
699 (assumed) — were missing from `_RULE_3_TEN_HOUR_CODES` (the long-
standing TODO there), so a Dual-meter room-heater cert fell through to
Rule 4 (7-hour default).

Compounded with S0380.230 (which routes room heaters to Table 12a
OTHER_DIRECT_ACTING_ELECTRIC): at 7-hour the high-rate fraction is 1.00
(all at 15.29 p), but at the correct 10-hour it is 0.50 split over the
10-hour rates (14.68 / 7.50 p) → blended ~11 p. Without this fix .230
over-charged and flipped the cluster from over- to under-rating.

1,000-cert 2026 API sample: cat-10 mean |err| 7.11 → 5.26, signed mean
+5.08 → -0.86 (now balanced, 22 over / 26 under — the systematic
directional bias is gone). Overall mean |err| 2.16 → 2.04. Full §4 suite
green (2406 passed).

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-04 20:51:09 +00:00
..
addresses standardist Address 2026-05-22 10:13:32 +00:00
data_transformation moved classifier data transformation to an easy one 2026-06-01 14:53:34 +00:00
epc Remove EPC and asset_list changes unrelated to SAL handler 2026-06-01 16:39:09 +00:00
fuel_rates feat(fuel-rates): FuelRates snapshot + repository foundation (ADR-0014) 2026-06-02 09:29:07 +00:00
geospatial feat(geospatial): GeospatialRepo — OS Open-UPRN coordinate lookup (#1131) 2026-06-01 16:28:48 +00:00
property feat(property): Property aggregate + PropertyRepository (#1132) 2026-06-01 16:28:48 +00:00
property_baseline refactor(baseline): Performance.from_sap_result replaces the loose mapper 2026-06-02 13:59:25 +00:00
sap10_calculator S0380.231: Dual-meter electric room heaters resolve to 10-hour tariff (RdSAP 10 §12 Rule 3) 2026-06-04 20:51:09 +00:00
sap10_ml S0380.217: capture wall_insulation_thermal_conductivity (was dropped) 2026-06-04 11:57:00 +00:00
tasks added postcode splitter rewrite to ddd 2026-05-19 16:35:09 +00:00
postcode.py get rid of comments 2026-05-20 13:21:11 +00:00