mirror of
https://github.com/Hestia-Homes/Model.git
synced 2026-06-08 11:17:27 +00:00
SAP 10.2 Appendix N3.5 (PDF p.107): "Allocate these to months in the
following order: Jan, Dec, Feb, Mar, Nov, Apr, Oct, May (coldest to
the warmest), until all the days N24,9 and N16,9 have been allocated.
Days N24,9 are allocated first."
`allocate_extended_heating_days_to_months` distributes annual N24,9
and N16,9 totals (from Table N5) across the cold-first month order,
with N24 days filling first and N16 days filling whatever space
remains in each month afterward.
Cross-pinned against the spec's PSR=0.2 worked example (PDF p.107):
Jan-Oct each get max N24, May ends up with the residual (6, 6). And
against cert 0380's worksheet: PSR≈1.43 → row 1.2+ (3, 38) →
Jan(3, 28), Dec(0, 10) — matches the worksheet 24/9 + 16/9 rows.
The 8 cold-month order spans 243 days, exceeding every Table N5
row's combined total — no allocation is dropped for Variable
heating duration. Fixed durations ("24" / "16" from Table N4) live
beyond this helper's contract (caller decides when N24=365 means
"all months at Th"); slice 102f-prep.4 wires that in.
Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
|
||
|---|---|---|
| .. | ||
| addresses | ||
| sap10_calculator | ||
| sap10_ml | ||
| tasks | ||
| postcode.py | ||