Model/tests/domain/modelling/fixtures
Khalim Conn-Kowlessar 11fb82b485 test(modelling): pin boiler-1/2 ASHP to the Vaillant overlay snapshot
The boiler-1 and boiler-2 after-certs predate the Vaillant product swap (they
lodge the old aroTHERM index 101413), so rather than wait on regenerated certs
these now snapshot the Vaillant overlay's own output on the before (SAP/CO2/PE
at 1e-4), taken as correct because the same overlay reproduces the corrected
Vaillant cert at delta 0 in the boiler-3 (system-boiler) pin. Drops the xfail
markers and the two stale, now-unreferenced after-cert fixtures.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-07 20:16:58 +00:00
..
ashp_from_gas_boiler_001431_before.pdf test(modelling): ASHP before/after cascade pin (001431) at 1e-4 2026-06-06 17:01:40 +00:00
ashp_from_gas_boiler_instant_hw_001431_before.pdf test(modelling): ASHP pin from a gas boiler with instantaneous HW + fuel tripwire 2026-06-06 17:40:25 +00:00
ashp_from_system_boiler_with_cylinder_001431_after.pdf test(modelling): finalize Vaillant ASHP swap on the cascade pins 2026-06-06 21:33:09 +00:00
ashp_from_system_boiler_with_cylinder_001431_before.pdf test(modelling): ASHP from a system gas boiler with an existing cylinder 2026-06-06 18:20:58 +00:00
cavity_wall_001431_after.pdf test(modelling): Elmhurst before/after cascade pin for cavity wall (#1154) 2026-06-03 09:36:53 +00:00
cavity_wall_001431_before.pdf test(modelling): Elmhurst before/after cascade pin for cavity wall (#1154) 2026-06-03 09:36:53 +00:00
double_glazing_001431_after.pdf test(fixtures): add glazing before/after certs (001431) for the pin slices 2026-06-05 07:54:43 +00:00
double_glazing_001431_before.pdf test(fixtures): add glazing before/after certs (001431) for the pin slices 2026-06-05 07:54:43 +00:00
flat_roof_001431_after.pdf feat(modelling): roof dispatcher insulates a flat roof 2026-06-04 21:16:00 +00:00
flat_roof_001431_before.pdf feat(modelling): roof dispatcher insulates a flat roof 2026-06-04 21:16:00 +00:00
hhr_storage_001431_after.pdf test(modelling): HHRSH before/after cascade pins (001431) at 1e-4 2026-06-05 19:09:23 +00:00
hhr_storage_from_electric_storage_001431_before.pdf test(modelling): HHRSH before/after cascade pins (001431) at 1e-4 2026-06-05 19:09:23 +00:00
hhr_storage_from_no_system_001431_before.pdf test(modelling): HHRSH before/after cascade pins (001431) at 1e-4 2026-06-05 19:09:23 +00:00
loft_001431_after.pdf feat(modelling): loft overlay 270→300 mm + Elmhurst cascade pin (#1158) 2026-06-03 09:39:21 +00:00
loft_001431_before.pdf feat(modelling): loft overlay 270→300 mm + Elmhurst cascade pin (#1158) 2026-06-03 09:39:21 +00:00
loft_thatched_001431_after.pdf feat(modelling): fold loft into the roof dispatcher; thatch routes to loft 2026-06-04 21:12:01 +00:00
loft_thatched_001431_before.pdf feat(modelling): fold loft into the roof dispatcher; thatch routes to loft 2026-06-04 21:12:01 +00:00
low_energy_lighting_some_leds_001431_after.pdf test(modelling): lighting before/after cascade pins (001431) at 1e-4 2026-06-05 12:27:36 +00:00
low_energy_lighting_some_leds_001431_before.pdf test(modelling): lighting before/after cascade pins (001431) at 1e-4 2026-06-05 12:27:36 +00:00
low_energy_lighting_zero_leds_001431_after.pdf test(modelling): lighting before/after cascade pins (001431) at 1e-4 2026-06-05 12:27:36 +00:00
low_energy_lighting_zero_leds_001431_before.pdf test(modelling): lighting before/after cascade pins (001431) at 1e-4 2026-06-05 12:27:36 +00:00
secondary_glazing_001431_after.pdf test(fixtures): add glazing before/after certs (001431) for the pin slices 2026-06-05 07:54:43 +00:00
secondary_glazing_001431_before.pdf test(fixtures): add glazing before/after certs (001431) for the pin slices 2026-06-05 07:54:43 +00:00
sloping_ceiling_001431_after.pdf feat(modelling): recommend_roof_insulation insulates a sloping ceiling 2026-06-04 21:02:06 +00:00
sloping_ceiling_001431_before.pdf feat(modelling): recommend_roof_insulation insulates a sloping ceiling 2026-06-04 21:02:06 +00:00
solid_brick_ewi_001431_after.pdf feat(modelling): overlay models solid-wall insulation (IWI/EWI), pinned 2026-06-04 15:11:26 +00:00
solid_brick_ewi_001431_before.pdf feat(modelling): overlay models solid-wall insulation (IWI/EWI), pinned 2026-06-04 15:11:26 +00:00
solid_brick_iwi_001431_after.pdf feat(modelling): overlay models solid-wall insulation (IWI/EWI), pinned 2026-06-04 15:11:26 +00:00
solid_brick_iwi_001431_before.pdf feat(modelling): overlay models solid-wall insulation (IWI/EWI), pinned 2026-06-04 15:11:26 +00:00
solid_floor_001431_after.pdf feat(modelling): floor insulation-type overlay field + cascade pins (#1159) 2026-06-03 09:41:54 +00:00
solid_floor_001431_before.pdf feat(modelling): floor insulation-type overlay field + cascade pins (#1159) 2026-06-03 09:41:54 +00:00
suspended_floor_001431_after.pdf feat(modelling): floor insulation-type overlay field + cascade pins (#1159) 2026-06-03 09:41:54 +00:00
suspended_floor_001431_before.pdf feat(modelling): floor insulation-type overlay field + cascade pins (#1159) 2026-06-03 09:41:54 +00:00
system_built_ewi_001431_after.pdf feat(modelling): system-built walls take EWI+IWI (blocked on basement-code fix) 2026-06-04 18:26:08 +00:00
system_built_ewi_001431_before.pdf feat(modelling): system-built walls take EWI+IWI (blocked on basement-code fix) 2026-06-04 18:26:08 +00:00
system_built_iwi_001431_after.pdf feat(modelling): system-built walls take EWI+IWI (blocked on basement-code fix) 2026-06-04 18:26:08 +00:00
system_built_iwi_001431_before.pdf feat(modelling): system-built walls take EWI+IWI (blocked on basement-code fix) 2026-06-04 18:26:08 +00:00
timber_frame_iwi_001431_after.pdf feat(modelling): solid-wall generator offers IWI-only for timber frame 2026-06-04 15:33:46 +00:00
timber_frame_iwi_001431_before.pdf feat(modelling): solid-wall generator offers IWI-only for timber frame 2026-06-04 15:33:46 +00:00