Model/tests/domain/modelling/fixtures
Khalim Conn-Kowlessar 63dd69ff8b feat(modelling): gas combi boiler upgrade + controls-when-inadequate
Extend the gas-boiler-upgrade Option to combi (no-cylinder) dwellings and add
the controls upgrade shared by both boiler shapes. A dwelling has a cylinder or
it does not, so the one `gas_boiler_upgrade` Option is shaped per dwelling:

- no cylinder -> a gas condensing combi (Table 4b code 104), no cylinder fields
  touched;
- a cylinder  -> a regular boiler (code 102) heating it, with the conditional
  cylinder jacket/thermostat (slice 1).

Controls: bring an inadequate boiler control up to full programmer + room
thermostat + TRVs (SAP 10.2 Table 4e Group 1 code 2106). "Inadequate" = the
Group-1 codes with NO room thermostat (2101, 2102, 2107, 2108, 2109, 2111) —
these lack boiler interlock (Table 4c(2) / footnote c) p.171), so adding a room
thermostat genuinely improves SAP. Room-thermostatted (2103/2104/2105/2106/2113)
or better zone controls (2110/2112) are left unchanged — never downgraded, so
no phantom uplift. The with-cylinder cert (control 2106) is therefore untouched
and its pin still holds at delta 0.

Validated by the combi before/after re-lodgement (cert 001431, gas boiler
upgrade - no cylinder): control 2111 "TRVs and bypass" -> 2106, fan flue
False->True, SAP code 112 -> 104. Cascade-pinned delta 0 (SAP/CO2/PE). Removed
the slice-1 placeholder test asserting no boiler Option fires without a cylinder
(the combi Option now correctly fires there).

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-09 16:28:00 +00:00
..
ashp_from_gas_boiler_001431_before.pdf test(modelling): ASHP before/after cascade pin (001431) at 1e-4 2026-06-06 17:01:40 +00:00
ashp_from_gas_boiler_instant_hw_001431_before.pdf test(modelling): ASHP pin from a gas boiler with instantaneous HW + fuel tripwire 2026-06-06 17:40:25 +00:00
ashp_from_system_boiler_with_cylinder_001431_after.pdf test(modelling): finalize Vaillant ASHP swap on the cascade pins 2026-06-06 21:33:09 +00:00
ashp_from_system_boiler_with_cylinder_001431_before.pdf test(modelling): ASHP from a system gas boiler with an existing cylinder 2026-06-06 18:20:58 +00:00
boiler_combi_gas_001431_after.pdf feat(modelling): gas combi boiler upgrade + controls-when-inadequate 2026-06-09 16:28:00 +00:00
boiler_combi_gas_001431_before.pdf feat(modelling): gas combi boiler upgrade + controls-when-inadequate 2026-06-09 16:28:00 +00:00
boiler_cyl_gas_001431_after.pdf feat(modelling): gas-boiler-upgrade-with-cylinder option in the heating rec 2026-06-09 16:16:46 +00:00
boiler_cyl_gas_001431_before.pdf feat(modelling): gas-boiler-upgrade-with-cylinder option in the heating rec 2026-06-09 16:16:46 +00:00
cavity_wall_001431_after.pdf test(modelling): Elmhurst before/after cascade pin for cavity wall (#1154) 2026-06-03 09:36:53 +00:00
cavity_wall_001431_before.pdf test(modelling): Elmhurst before/after cascade pin for cavity wall (#1154) 2026-06-03 09:36:53 +00:00
double_glazing_001431_after.pdf test(fixtures): add glazing before/after certs (001431) for the pin slices 2026-06-05 07:54:43 +00:00
double_glazing_001431_before.pdf test(fixtures): add glazing before/after certs (001431) for the pin slices 2026-06-05 07:54:43 +00:00
flat_roof_001431_after.pdf feat(modelling): roof dispatcher insulates a flat roof 2026-06-04 21:16:00 +00:00
flat_roof_001431_before.pdf feat(modelling): roof dispatcher insulates a flat roof 2026-06-04 21:16:00 +00:00
google_building_insights_001431.json feat(modelling): typed SolarPotential projection over Google buildingInsights 2026-06-08 09:55:55 +00:00
hhr_storage_001431_after.pdf test(modelling): HHRSH before/after cascade pins (001431) at 1e-4 2026-06-05 19:09:23 +00:00
hhr_storage_from_electric_storage_001431_before.pdf test(modelling): HHRSH before/after cascade pins (001431) at 1e-4 2026-06-05 19:09:23 +00:00
hhr_storage_from_no_system_001431_before.pdf test(modelling): HHRSH before/after cascade pins (001431) at 1e-4 2026-06-05 19:09:23 +00:00
loft_001431_after.pdf feat(modelling): loft overlay 270→300 mm + Elmhurst cascade pin (#1158) 2026-06-03 09:39:21 +00:00
loft_001431_before.pdf feat(modelling): loft overlay 270→300 mm + Elmhurst cascade pin (#1158) 2026-06-03 09:39:21 +00:00
loft_thatched_001431_after.pdf feat(modelling): fold loft into the roof dispatcher; thatch routes to loft 2026-06-04 21:12:01 +00:00
loft_thatched_001431_before.pdf feat(modelling): fold loft into the roof dispatcher; thatch routes to loft 2026-06-04 21:12:01 +00:00
low_energy_lighting_some_leds_001431_after.pdf test(modelling): lighting before/after cascade pins (001431) at 1e-4 2026-06-05 12:27:36 +00:00
low_energy_lighting_some_leds_001431_before.pdf test(modelling): lighting before/after cascade pins (001431) at 1e-4 2026-06-05 12:27:36 +00:00
low_energy_lighting_zero_leds_001431_after.pdf test(modelling): lighting before/after cascade pins (001431) at 1e-4 2026-06-05 12:27:36 +00:00
low_energy_lighting_zero_leds_001431_before.pdf test(modelling): lighting before/after cascade pins (001431) at 1e-4 2026-06-05 12:27:36 +00:00
secondary_glazing_001431_after.pdf test(fixtures): add glazing before/after certs (001431) for the pin slices 2026-06-05 07:54:43 +00:00
secondary_glazing_001431_before.pdf test(fixtures): add glazing before/after certs (001431) for the pin slices 2026-06-05 07:54:43 +00:00
sloping_ceiling_001431_after.pdf feat(modelling): recommend_roof_insulation insulates a sloping ceiling 2026-06-04 21:02:06 +00:00
sloping_ceiling_001431_before.pdf feat(modelling): recommend_roof_insulation insulates a sloping ceiling 2026-06-04 21:02:06 +00:00
solar_pv_001431_before.pdf test(modelling): Solar PV Elmhurst cascade pins + battery tripwire 2026-06-08 12:42:24 +00:00
solar_pv_no_battery_001431_after_1.pdf test(modelling): Solar PV Elmhurst cascade pins + battery tripwire 2026-06-08 12:42:24 +00:00
solar_pv_no_battery_001431_after_2.pdf test(modelling): Solar PV Elmhurst cascade pins + battery tripwire 2026-06-08 12:42:24 +00:00
solar_pv_no_battery_001431_after_3.pdf test(modelling): Solar PV Elmhurst cascade pins + battery tripwire 2026-06-08 12:42:24 +00:00
solar_pv_with_battery_001431_after.pdf test(modelling): Solar PV Elmhurst cascade pins + battery tripwire 2026-06-08 12:42:24 +00:00
solid_brick_ewi_001431_after.pdf feat(modelling): overlay models solid-wall insulation (IWI/EWI), pinned 2026-06-04 15:11:26 +00:00
solid_brick_ewi_001431_before.pdf feat(modelling): overlay models solid-wall insulation (IWI/EWI), pinned 2026-06-04 15:11:26 +00:00
solid_brick_iwi_001431_after.pdf feat(modelling): overlay models solid-wall insulation (IWI/EWI), pinned 2026-06-04 15:11:26 +00:00
solid_brick_iwi_001431_before.pdf feat(modelling): overlay models solid-wall insulation (IWI/EWI), pinned 2026-06-04 15:11:26 +00:00
solid_floor_001431_after.pdf feat(modelling): floor insulation-type overlay field + cascade pins (#1159) 2026-06-03 09:41:54 +00:00
solid_floor_001431_before.pdf feat(modelling): floor insulation-type overlay field + cascade pins (#1159) 2026-06-03 09:41:54 +00:00
suspended_floor_001431_after.pdf feat(modelling): floor insulation-type overlay field + cascade pins (#1159) 2026-06-03 09:41:54 +00:00
suspended_floor_001431_before.pdf feat(modelling): floor insulation-type overlay field + cascade pins (#1159) 2026-06-03 09:41:54 +00:00
system_built_ewi_001431_after.pdf feat(modelling): system-built walls take EWI+IWI (blocked on basement-code fix) 2026-06-04 18:26:08 +00:00
system_built_ewi_001431_before.pdf feat(modelling): system-built walls take EWI+IWI (blocked on basement-code fix) 2026-06-04 18:26:08 +00:00
system_built_iwi_001431_after.pdf feat(modelling): system-built walls take EWI+IWI (blocked on basement-code fix) 2026-06-04 18:26:08 +00:00
system_built_iwi_001431_before.pdf feat(modelling): system-built walls take EWI+IWI (blocked on basement-code fix) 2026-06-04 18:26:08 +00:00
timber_frame_iwi_001431_after.pdf feat(modelling): solid-wall generator offers IWI-only for timber frame 2026-06-04 15:33:46 +00:00
timber_frame_iwi_001431_before.pdf feat(modelling): solid-wall generator offers IWI-only for timber frame 2026-06-04 15:33:46 +00:00