mirror of
https://github.com/Hestia-Homes/Model.git
synced 2026-06-08 11:17:27 +00:00
Documents the full §4 HW cascade closure for cert 000565 across the S0380.77 → S0380.80 series: - S0380.77 primary loss WHC 914 routing - S0380.78 §1x.0 shower extractor + (247a) fallback cost - S0380.79 (57)m solar storage + separately-timed-DHW cylinder default - S0380.80 Table 4c −5% DHW for missing boiler interlock Cumulative cert 000565 closure: hot_water_kwh: +1399 → ✓ 0 EXACT (100%) continuous SAP: +0.78 → -0.041 (95% closed) total cost: -69 → +3.62 (95% closed) All §4 line refs (45)/(46)/(57)/(59)/(62)/(64)/(217)/(219) EXACT Open #1 priority for the next agent: deferred ADR-0010 mains-gas tariff Table 32 vs Table 12 cohort closure. The remaining sap_score=28 vs worksheet 29 flip is entirely due to this £0.16/100 gas-price delta over 3755 HW kWh = +£6 → +0.041 continuous SAP → flips integer at the 28.5 boundary. Cohort-wide change; would land sap_score=29 EXACT for cert 000565 AND likely tighten several other worksheet certs in the same coordinated pass. Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com> |
||
|---|---|---|
| .. | ||
| addresses | ||
| sap10_calculator | ||
| sap10_ml | ||
| tasks | ||
| postcode.py | ||