Model/domain
Khalim Conn-Kowlessar 04d6e8b868 docs: update handover — cert 9501 closed, HP workstream still next
Cert 9501 (top-floor flat + RR + measured PV) is now CLOSED on both
Summary and API paths at 1e-4 vs worksheet 68.5252 (Slices 99a-99e
on Summary + 100a-100c on API). Three boiler certs in total now
have Layer 4 production gates.

Updated handover lists the 7 ASHP workstream (still deferred), the
8 cohort certs without worksheets (residuals tightened by Slice
100c's gap-aware DG-pre-2002 glazing lookup), and captures the 7
key learnings from cert 9501 closure as guidance for the HP
workstream.

Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
2026-06-01 16:28:45 +00:00
..
addresses standardist Address 2026-05-22 10:13:32 +00:00
data_transformation moved classifier data transformation to an easy one 2026-06-01 14:53:34 +00:00
epc pr review, move domain and orhcestration 2026-06-01 14:00:31 +00:00
sap10_calculator docs: update handover — cert 9501 closed, HP workstream still next 2026-06-01 16:28:45 +00:00
sap10_ml Slice 96: flat-roof U-value defaults — RdSAP 10 §5.11 Table 18 col (3) 2026-06-01 16:28:45 +00:00
tasks added postcode splitter rewrite to ddd 2026-05-19 16:35:09 +00:00
postcode.py get rid of comments 2026-05-20 13:21:11 +00:00