Model/domain
Khalim Conn-Kowlessar 8904ec090b docs: handover + next-agent prompt post S0380.115..124
10 spec-cited slices closed this session:
  .115 — fixture ECF pin typo
  .116 — RdSAP 10 §15 A_RR_shell rounding (cert 000565 truly exact)
  .117 — re-pin golden PE residuals for 0240 + 6035
  .118 — cohort LINE_xx pins → 1e-4 + §15-aware RR test expecteds
  .119 — §5 test EPC builder propagates sap_roof_windows
  .120 — RdSAP 10 §5.11.4 NI vs explicit-0 roof discriminator
  .121 — floor_construction code 4 → "Solid" (basement cert 0712)
  .122 — tighten test_ventilation tolerances
  .123 — pin Table U5 share-column solar fluxes at exact equality
  .124 — tighten dimensions + rating arithmetic pins

Extended handover suite at HEAD `1e69bd39`: 775 pass, 0 fail.

Handover documents:
- HANDOVER_POST_S0380_124.md — full state + cert 0240 hypothesis ranking
- NEXT_AGENT_PROMPT_POST_S0380_124.md — two-task brief (0240 cost-cascade
  diagnosis + golden-corpus audit awaiting user's same-property
  heating-variant Elmhurst fixtures).

Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
2026-05-30 22:15:22 +00:00
..
addresses get rid of comments 2026-05-20 13:21:11 +00:00
sap10_calculator docs: handover + next-agent prompt post S0380.115..124 2026-05-30 22:15:22 +00:00
sap10_ml Slice S0380.109: Solid brick + insulation via §5.7 Table 13 + §5.8 Table 14 (RdSAP 10) 2026-05-30 18:10:33 +00:00
tasks added postcode splitter rewrite to ddd 2026-05-19 16:35:09 +00:00
postcode.py get rid of comments 2026-05-20 13:21:11 +00:00