Model/domain/sap10_calculator/docs
Khalim Conn-Kowlessar 7a45737865 docs: handover + next-agent prompt post S0380.85..90 (BP main-wall closure + SH-channel discovery + strict-raise series)
Session summary documents covering 6 slices:

- S0380.85 — Curtain Wall §5.18 dispatch (cascade walls 443 → 555.93 W/K)
- S0380.86 — §5.6 thin-wall stone + §5.8 dry-line (555.93 → 602.40,
              worksheet 604.07, 0.27% residual)
- S0380.87 — Table 4e GROUP 2 HP control codes — single-line spec
              dispatch bug; SH residual +7924 → +1460 (82%), sap_score
              23 → 27, largest single-slice movement of session
- S0380.88 — Full Table 4e Groups 0-7 + UnmappedSapCode strict-raise
- S0380.89 — Table 4d responsiveness + screed-UFH bug fix + strict raise
              (latent bug found via strict-raise rollout)
- S0380.90 — 6 dispatch sites strict-raise + UnmappedSapCode shared
              module + GOV.UK API digit-string meter_type bug fix

HANDOVER_POST_S0380_90.md covers full state, cumulative-closure table,
strict-raise philosophy, and which 6 dispatch sites were closed.

NEXT_AGENT_PROMPT_POST_S0380_90.md briefs the next-slice work:
S0380.91 (RdSAP 10 Table 15 row 3 "Cavity masonry filled" U=0.2 in
u_party_wall — closes ~+1000 kWh of the remaining +1460 SH residual
on cert 000565 Ext1).

Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
2026-06-01 16:28:47 +00:00
..
specs docs: handover for Table 3a no-keep-hot continuation + SAP 10 spec PDFs 2026-06-01 16:28:46 +00:00
BRIEF_APPENDIX_H_EN_15316_RESEARCH.md Slice S0380.74: Appendix H (H7) U3.3 monthly-integrated convention closes 1.81× over-count 2026-06-01 16:28:47 +00:00
HANDOVER_38_CERT_COHORT_EXPANSION.md docs: handover — Summary + API cohort expansion to 38 additional certs 2026-06-01 16:28:46 +00:00
HANDOVER_API_PATH_CLOSURE.md docs: handover after S0380.31..S0380.38 — cohort-2 Summary path COMPLETE, thread 4 next 2026-06-01 16:28:47 +00:00
HANDOVER_CERT_0380_HW_CASCADE.md docs: handover — cert 0380 HW cascade (slices 102a-e shipped, MIT residual deferred to next session) 2026-06-01 16:28:46 +00:00
HANDOVER_CERT_0380_MIT_CASCADE.md docs: handover refresh — cohort closed to spec-precision floor 2026-06-01 16:28:46 +00:00
HANDOVER_CERT_0380_SUMMARY_PATH.md docs: handover — start cert 0380 Summary → EPC → calculator path 2026-06-01 16:28:46 +00:00
HANDOVER_CERT_000565_COST_CASCADE.md docs: handover + next-agent prompt for S0380.64..69 2026-06-01 16:28:47 +00:00
HANDOVER_CERT_9501_AND_HEATPUMPS.md docs: update handover — cert 0380 API path Δ -18.37 → +2.92 SAP 2026-06-01 16:28:45 +00:00
HANDOVER_COHORT_2_PRECISION_FLOOR.md docs: handover for cohort-2 closure + precision-floor next steps 2026-06-01 16:28:46 +00:00
HANDOVER_GOLDEN_COVERAGE.md docs: extend handover with Elmhurst-only path + 000565 extended test case 2026-06-01 16:28:47 +00:00
HANDOVER_GOLDEN_RESIDUALS.md docs: handover after S0380.39..S0380.43 — cohort-2 API path 38/38 closed 2026-06-01 16:28:47 +00:00
HANDOVER_NEXT.md refactor: move docs/sap-spec/ contents into domain/sap10_calculator/ 2026-05-26 13:17:18 +00:00
HANDOVER_POST_4_CERT_EMPIRICAL.md Slice S0380.74: Appendix H (H7) U3.3 monthly-integrated convention closes 1.81× over-count 2026-06-01 16:28:47 +00:00
HANDOVER_POST_S0380_69.md docs: handover + next-agent prompt for S0380.64..69 2026-06-01 16:28:47 +00:00
HANDOVER_POST_S0380_73_APPENDIX_H_BLOCKED.md docs: handover + research brief + next-agent prompt for cert 000565 Appendix H 2026-06-01 16:28:47 +00:00
HANDOVER_POST_S0380_76.md docs: handover + next-agent prompt post S0380.74..76 2026-06-01 16:28:47 +00:00
HANDOVER_POST_S0380_80.md docs: handover + next-agent prompt post S0380.77..80 (cert 000565 §4 HW EXACT) 2026-06-01 16:28:47 +00:00
HANDOVER_POST_S0380_84.md docs: handover + next-agent prompt post S0380.81..84 (Table 32 default + Table 12a Grid 2 CO2 + RR fold-in) 2026-06-01 16:28:47 +00:00
HANDOVER_POST_S0380_90.md docs: handover + next-agent prompt post S0380.85..90 (BP main-wall closure + SH-channel discovery + strict-raise series) 2026-06-01 16:28:47 +00:00
HANDOVER_PRECISION_FLOOR_CLOSED.md docs: handover after S0380.26-30 precision-floor closure 2026-06-01 16:28:46 +00:00
HANDOVER_PV_BETA_SPLIT.md docs: PV β-split phase COMPLETE handover (6/6 slices) 2026-06-01 16:28:47 +00:00
HANDOVER_TABLE_3A_NO_KEEP_HOT.md docs: handover for Table 3a no-keep-hot continuation + SAP 10 spec PDFs 2026-06-01 16:28:46 +00:00
NEXT_AGENT_PROMPT.md docs: refresh NEXT_AGENT_PROMPT for PV β-split slices 4-6 2026-06-01 16:28:47 +00:00
NEXT_AGENT_PROMPT_POST_S0380_69.md docs: handover + next-agent prompt for S0380.64..69 2026-06-01 16:28:47 +00:00
NEXT_AGENT_PROMPT_POST_S0380_73.md docs: handover + research brief + next-agent prompt for cert 000565 Appendix H 2026-06-01 16:28:47 +00:00
NEXT_AGENT_PROMPT_POST_S0380_76.md docs: handover + next-agent prompt post S0380.74..76 2026-06-01 16:28:47 +00:00
NEXT_AGENT_PROMPT_POST_S0380_80.md docs: handover + next-agent prompt post S0380.77..80 (cert 000565 §4 HW EXACT) 2026-06-01 16:28:47 +00:00
NEXT_AGENT_PROMPT_POST_S0380_84.md docs: handover + next-agent prompt post S0380.81..84 (Table 32 default + Table 12a Grid 2 CO2 + RR fold-in) 2026-06-01 16:28:47 +00:00
NEXT_AGENT_PROMPT_POST_S0380_90.md docs: handover + next-agent prompt post S0380.85..90 (BP main-wall closure + SH-channel discovery + strict-raise series) 2026-06-01 16:28:47 +00:00
SAP_CALCULATOR.md refactor: move docs/sap-spec/ contents into domain/sap10_calculator/ 2026-05-26 13:17:18 +00:00