Model/backend/documents_parser/tests/fixtures/Summary_001431_case38.pdf
Khalim Conn-Kowlessar 4fdc23f83d test(worksheet): pin simulated case 38 — mains-gas secondary reproduces worksheet exactly
The realistic re-generation of case 37 (code-117 gas boiler, control 2102,
+ a MAINS-GAS condensing gas-fire secondary code 611, vs case 37's biogas
605). The full extractor -> mapper -> calculator pipeline reproduces the
worksheet's SAP-rating block EXACTLY: continuous SAP 60.9152 (Δ 2e-5) and
(272) CO2 5801.0770 (Δ ~0). This confirms the boiler-efficiency /
control-2102 −5pp interlock / secondary-fuel handling are all correct, and
that case 37's +7 gap was purely the biogas sub-fuel the Summary export
cannot carry.

Summary mirrored into backend/documents_parser/tests/fixtures so the pin
runs without the unstaged workspace. PE not pinned — it is a separate
DPER block (different scope) already guarded by the corpus PE gauge.
Worksheet harness 47/47 unchanged; pyright net-zero.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-15 13:31:36 +00:00

82 KiB