..
specs
docs: handover for Table 3a no-keep-hot continuation + SAP 10 spec PDFs
2026-06-01 16:28:46 +00:00
BRIEF_APPENDIX_H_EN_15316_RESEARCH.md
Slice S0380.74: Appendix H (H7) U3.3 monthly-integrated convention closes 1.81× over-count
2026-06-01 16:28:47 +00:00
HANDOVER_38_CERT_COHORT_EXPANSION.md
docs: handover — Summary + API cohort expansion to 38 additional certs
2026-06-01 16:28:46 +00:00
HANDOVER_API_PATH_CLOSURE.md
docs: handover after S0380.31..S0380.38 — cohort-2 Summary path COMPLETE, thread 4 next
2026-06-01 16:28:47 +00:00
HANDOVER_CERT_0380_HW_CASCADE.md
docs: handover — cert 0380 HW cascade (slices 102a-e shipped, MIT residual deferred to next session)
2026-06-01 16:28:46 +00:00
HANDOVER_CERT_0380_MIT_CASCADE.md
docs: handover refresh — cohort closed to spec-precision floor
2026-06-01 16:28:46 +00:00
HANDOVER_CERT_0380_SUMMARY_PATH.md
docs: handover — start cert 0380 Summary → EPC → calculator path
2026-06-01 16:28:46 +00:00
HANDOVER_CERT_000565_COST_CASCADE.md
docs: handover + next-agent prompt for S0380.64..69
2026-06-01 16:28:47 +00:00
HANDOVER_CERT_9501_AND_HEATPUMPS.md
docs: update handover — cert 0380 API path Δ -18.37 → +2.92 SAP
2026-06-01 16:28:45 +00:00
HANDOVER_COHORT_2_PRECISION_FLOOR.md
docs: handover for cohort-2 closure + precision-floor next steps
2026-06-01 16:28:46 +00:00
HANDOVER_GOLDEN_COVERAGE.md
docs: extend handover with Elmhurst-only path + 000565 extended test case
2026-06-01 16:28:47 +00:00
HANDOVER_GOLDEN_RESIDUALS.md
docs: handover after S0380.39..S0380.43 — cohort-2 API path 38/38 closed
2026-06-01 16:28:47 +00:00
HANDOVER_NEXT.md
refactor: move docs/sap-spec/ contents into domain/sap10_calculator/
2026-05-26 13:17:18 +00:00
HANDOVER_POST_4_CERT_EMPIRICAL.md
Slice S0380.74: Appendix H (H7) U3.3 monthly-integrated convention closes 1.81× over-count
2026-06-01 16:28:47 +00:00
HANDOVER_POST_S0380_69.md
docs: handover + next-agent prompt for S0380.64..69
2026-06-01 16:28:47 +00:00
HANDOVER_POST_S0380_73_APPENDIX_H_BLOCKED.md
docs: handover + research brief + next-agent prompt for cert 000565 Appendix H
2026-06-01 16:28:47 +00:00
HANDOVER_POST_S0380_76.md
docs: handover + next-agent prompt post S0380.74..76
2026-06-01 16:28:47 +00:00
HANDOVER_POST_S0380_80.md
docs: handover + next-agent prompt post S0380.77..80 (cert 000565 §4 HW EXACT)
2026-06-01 16:28:47 +00:00
HANDOVER_POST_S0380_84.md
docs: handover + next-agent prompt post S0380.81..84 (Table 32 default + Table 12a Grid 2 CO2 + RR fold-in)
2026-06-01 16:28:47 +00:00
HANDOVER_POST_S0380_90.md
docs: handover + next-agent prompt post S0380.85..90 (BP main-wall closure + SH-channel discovery + strict-raise series)
2026-06-01 16:28:47 +00:00
HANDOVER_POST_S0380_95.md
docs: handover + next-agent prompt post S0380.91..95 (party-wall + AP4/MEV + §5.14 floor + RIR insulation + Detailed-RR residual)
2026-06-01 16:28:47 +00:00
HANDOVER_POST_S0380_103.md
docs: handover + next-agent prompt post S0380.96..103 (RIR Unknown + §9 floor + MEV PCDB arc + HP-on-E7 cost split)
2026-06-01 16:28:47 +00:00
HANDOVER_POST_S0380_109.md
docs: handover + next-agent prompt post S0380.105..109 (MEV trifecta + window routing + Connected gable + §5.7/5.8 brick formula)
2026-06-01 16:28:47 +00:00
HANDOVER_PRECISION_FLOOR_CLOSED.md
docs: handover after S0380.26-30 precision-floor closure
2026-06-01 16:28:46 +00:00
HANDOVER_PV_BETA_SPLIT.md
docs: PV β-split phase COMPLETE handover (6/6 slices)
2026-06-01 16:28:47 +00:00
HANDOVER_TABLE_3A_NO_KEEP_HOT.md
docs: handover for Table 3a no-keep-hot continuation + SAP 10 spec PDFs
2026-06-01 16:28:46 +00:00
NEXT_AGENT_PROMPT.md
docs: refresh NEXT_AGENT_PROMPT for PV β-split slices 4-6
2026-06-01 16:28:47 +00:00
NEXT_AGENT_PROMPT_POST_S0380_69.md
docs: handover + next-agent prompt for S0380.64..69
2026-06-01 16:28:47 +00:00
NEXT_AGENT_PROMPT_POST_S0380_73.md
docs: handover + research brief + next-agent prompt for cert 000565 Appendix H
2026-06-01 16:28:47 +00:00
NEXT_AGENT_PROMPT_POST_S0380_76.md
docs: handover + next-agent prompt post S0380.74..76
2026-06-01 16:28:47 +00:00
NEXT_AGENT_PROMPT_POST_S0380_80.md
docs: handover + next-agent prompt post S0380.77..80 (cert 000565 §4 HW EXACT)
2026-06-01 16:28:47 +00:00
NEXT_AGENT_PROMPT_POST_S0380_84.md
docs: handover + next-agent prompt post S0380.81..84 (Table 32 default + Table 12a Grid 2 CO2 + RR fold-in)
2026-06-01 16:28:47 +00:00
NEXT_AGENT_PROMPT_POST_S0380_90.md
docs: handover + next-agent prompt post S0380.85..90 (BP main-wall closure + SH-channel discovery + strict-raise series)
2026-06-01 16:28:47 +00:00
NEXT_AGENT_PROMPT_POST_S0380_95.md
docs: handover + next-agent prompt post S0380.91..95 (party-wall + AP4/MEV + §5.14 floor + RIR insulation + Detailed-RR residual)
2026-06-01 16:28:47 +00:00
NEXT_AGENT_PROMPT_POST_S0380_103.md
docs: handover + next-agent prompt post S0380.96..103 (RIR Unknown + §9 floor + MEV PCDB arc + HP-on-E7 cost split)
2026-06-01 16:28:47 +00:00
NEXT_AGENT_PROMPT_POST_S0380_109.md
docs: handover + next-agent prompt post S0380.105..109 (MEV trifecta + window routing + Connected gable + §5.7/5.8 brick formula)
2026-06-01 16:28:47 +00:00
SAP_CALCULATOR.md
refactor: move docs/sap-spec/ contents into domain/sap10_calculator/
2026-05-26 13:17:18 +00:00