Model/docs
Khalim Conn-Kowlessar 29feee7869 docs: handover for §6 Solar gains agent
Captures the §5 implementation pattern (slice-per-test/impl/commit,
ALL_FIXTURES e2e conformance, frozen Result dataclass, calculator.py
wiring) and the SAP10.2 / Table 6d gotchas that cost time during §5
(Z_solar vs Z_L columns, rooflight Z=1.0, existing modules untrusted).

Hard constraints documented for the next agent:
  - 6-fixture conformance ≤5e-3 W on every line (do not loosen tests).
  - Stop and ask the user after ~15 min of unsuccessful reconciliation
    or before scanning more than ~50 lines of spec PDF.
  - Don't touch the untracked `sap worksheets/` folder.

Surfaces the pre-grilling unknowns the §6 agent should propose
recommended answers for during `/grill-me`.

Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
2026-05-20 19:29:30 +00:00
..
adr docs: ADR-0010 retargets calculator to SAP 10.2; rewrite handover 2026-05-19 09:54:24 +00:00
sap-spec docs: handover for §6 Solar gains agent 2026-05-20 19:29:30 +00:00