Model/docs
Khalim Conn-Kowlessar e63516cb26 docs: SPEC_COVERAGE PCDB integration row + slice progress + gap-list update
Updates the Prioritised gap list item 1 narrative: Table 105 (gas/oil boilers) integration done; remaining = Table 362 heat pumps + Appendix N cascade, equation D1 monthly water heating, Tables 313/353/391/506 ancillaries, condensing-boiler Ecodesign corrections.

Adds a PCDB slice progress table: ETL parser + 8-table JSONL output (`fe04cd3a`), runtime lookup module (`23678228`), cert_to_inputs precedence cascade with widened golden tolerance (`a104dd55`).

Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
2026-05-21 09:51:10 +00:00
..
adr docs: ADR-0010 retargets calculator to SAP 10.2; rewrite handover 2026-05-19 09:54:24 +00:00
sap-spec docs: SPEC_COVERAGE PCDB integration row + slice progress + gap-list update 2026-05-21 09:51:10 +00:00