Khalim Conn-Kowlessar
dd92ba5972 refactor(modelling): load ASHP rates from a committed costs file
Slice 10 of ADR-0025 costing. The Southern Housing rate table moves from code
constants into ashp_rates.json (structured rows the flat scalar catalogue can't
hold), loaded via AshpRates.from_json. Products takes an injected AshpRates
(default: the committed sheet), so rates are now data -- tunable (e.g.
reuse_distribution_fraction) without a code change, and ready for ETL/DB-supplied
rates later. Behaviour-preserving: the 6 pinned cost tests still hold against the
default, plus a new test proving injected rates drive the total.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-06 23:19:53 +00:00
Khalim Conn-Kowlessar
c7acf43b52 test(modelling): pin ASHP radiator-count clamp to table bounds
Slice 6 of ADR-0025 costing. Characterises the distribution clamp built in the
tracer: a radiator proxy below 4 prices as the 4-rad band, above 12 as the
12-rad band, in-range exact.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-06 20:44:57 +00:00
Khalim Conn-Kowlessar
fd9e020b09 test(modelling): pin ASHP heat-pump band round-up at the edges
Slice 5 of ADR-0025 costing. Characterises the pump-band selection built in
the tracer: a design heat loss is rounded UP to the smallest covering band
{5,8,11,15,16+} kW, and loads above the largest band take the top rate. Edge
pins (5.0/5.01/8.0/8.01/11.0/15.0/15.01/25.0) lock the boundaries.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-06 20:44:19 +00:00
Khalim Conn-Kowlessar
9860f06864 feat(modelling): ASHP decommission fallbacks for off-sheet systems
Slice 4 of ADR-0025 costing. ASHP is offered to any house regardless of fuel,
so _decommission now prices a fallback instead of raising: no system -> 0,
electric room/panel heaters -> electric-storage line, anything else -> gas
line (representative default). Never blocks ASHP eligibility.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-06 20:42:14 +00:00
Khalim Conn-Kowlessar
22612a19eb feat(modelling): ASHP reuse case prices flush + half distribution
Slice 3 of ADR-0025 costing. When the dwelling has a reusable wet system,
_distribution charges a power-flush (168) plus _REUSE_DISTRIBUTION_FRACTION
(0.5) of the full radiator band -- a documented stand-in for partial radiator
upsizing at ASHP flow temps, the headline uncertainty in the model. Without a
wet system the full new distribution is priced.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-06 20:41:06 +00:00
Khalim Conn-Kowlessar
cf7c2e017d feat(modelling): ASHP decommission cost by existing system
Slice 2 of ADR-0025 costing. _decommission maps the existing system to its
Southern Housing line: gas/oil flat 720, LPG 960 (tank+fuel removal),
electric-storage 570/840 by property-size band. Unmapped systems raise for
now -- the no-system/electric-other/other fallbacks land in the next slice.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-06 20:36:12 +00:00
Khalim Conn-Kowlessar
d23b84209d feat(modelling): Products.ashp_bundle_cost composite ASHP cost (tracer)
First slice of the per-dwelling ASHP bundle costing (ADR-0025). Products is
the rich catalogue collection over Product, owning the catalogue math: given
a typed AshpCostInputs it sums the applicable Southern Housing rate lines
(decommission + heat-pump band + fixed cylinder + full wet distribution) into
a Cost with the separate 25% ASHP contingency. Pure -- no EpcPropertyData or
calculator. Pinned exact (1e-9) against the real rate sheet. Reuse branch,
decommission variants, fallbacks, band edges and radiator clamp follow.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>