SAP 10.2 Table 12 footnote (t) (PDF p.189): "PE factors for grid
electricity vary by month. The average figure given in this table is
therefore not used directly. Instead the monthly factors given in
Table 12e should be used in the SAP worksheet." Footnote (s) says the
same for CO2 / Table 12d. Read literally, monthly factors apply to
every electric end-use including dual-rate HW.
The BRE-approved Elmhurst rdSAP engine doesn't follow that reading
for HW. The 41-variant heating-systems corpus controlled-variable
fixture lodges worksheet (278) "Water heating (low-rate cost)" with
factor **1.5010 PE / 0.136 CO2** (Table 12 annual flat) across every
dual-rate tariff cert, while applying the monthly Table 12e/12d
cascade to lighting (1.5338 winter-weighted) and secondary heating
(1.5715) on the same certs. It's an engine implementation choice,
not a documented spec exception.
Per [[feedback-software-no-special-handling]] the calculator
contract is bit-faithful replication of the engine, not literal
compliance with the spec text. This slice flips cascade
`_hot_water_primary_factor` + `_hot_water_co2_factor_kg_per_kwh` to
accept a `tariff: Tariff` parameter:
- STANDARD tariff → Table 12e/12d monthly cascade weighted
by HW demand seasonality (unchanged from
S0380.71 / .72, matches cohort-1 ASHP
standard-tariff worksheet)
- 7-hour / 10-hour /
18-hour / 24-hour → Table 12 annual flat (1.501 / 0.136)
matching the Elmhurst worksheet (278)
"Water heating (low-rate cost)" row
Per-line walk on electric 3 (18-hour tariff, electric immersion HW,
2384.116 kWh annual):
worksheet (278) factor = 1.5010
cascade pre-slice = 1.5214 delta = +0.0204
(1.5214 - 1.5010) × 2384.116 = +48.66 kWh/yr PE — EXACT match
the corpus residual pin.
Same shape for CO2: worksheet 0.1360, cascade pre-slice 0.1410,
delta +0.0050 × 2384.116 = +11.95 kg/yr.
Closures across the 18-variant deferred lighting-PE cohort
(electric 1/2/3/5/6/7/8/9 + solid fuel 4/5/6/7/8/9/10/11 + ashp +
gshp):
ΔCO2 +6.31 / +11.95 → ±0.0000 EXACT
ΔPE +25.51 / +48.66 → ±0.0000 EXACT
ΔSAP_c / Δcost unchanged at ±0.0000 EXACT (already closed
pre-slice by S0380.156..162).
All 25 cascade-OK variants in the heating-systems corpus now
SAP / cost / CO2 / PE EXACT vs worksheet on all 4 metrics, with
solid fuel 2 as the only remaining open residual (separate
S0380.154 summer-immersion-blend CO2/PE artifact — deferred).
Documented in
`domain/sap10_calculator/docs/SAP_CALCULATOR.md §8.1
"HW PE/CO2 factors on dual-rate tariffs use Table 12 annual"` —
the master doc now carries a new §8 "Elmhurst-mirrored spec
divergences" section for cases like this. Validation tally
refreshed from stale "930/930" to current "941/941".
No regressions on the 6 Elmhurst U985 fixtures (gas combi
STANDARD tariff — unaffected) or the cohort-1 ASHP certs
(STANDARD tariff — unaffected). The dual-rate gate fires only
on the 4 off-peak tariffs.
Verbatim spec quote retained for reference (SAP 10.2 Table 12
footnote (t), PDF p.189):
"PE factors for grid electricity vary by month. The average
figure given in this table is therefore not used directly.
Instead the monthly factors given in Table 12e should be used
in the SAP worksheet."
Tests: 907 pass (+1), 0 fail. Pyright net-zero (43 → 43).
Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
SAP 10.2 Appendix N3.1 (PDF p.105) "Circulation pump and fan":
"For electric heat pumps: The electricity used by the water
circulation pump or fan is included within the calculated annual
space and hot water heating efficiency and is not included in
worksheet (230c). **The default heat gain from Table 5a is included
via worksheet (70).**"
This rule applies the Table 5a row "Central heating pump in heated
space" GAIN (3 / 10 / 7 W per pump-age bucket) to electric heat
pumps even though the pump ELECTRICITY is hidden in the COP and
excluded from (230c). The "Not applicable for electric heat pumps
from database" clause in Table 5a footnote a) scopes only to the
PCDB-Table-362 cascade case (Appendix N1.2.1: "For heat pumps held
in the PCDB ... a single water circulation pump serving the heat
emitters is sufficient" — pump kWh AND gain embedded in COP).
S0380.160 over-stripped the gain by zeroing pump_w for every HP
category-4 main, conflating the PCDB-Table-362 case with the Table-4a
default cascade. This slice refines the HP gate in
`_any_main_system_has_central_heating_pump`:
- Cat 4 HP WITH `main_heating_index_number` lodged (PCDB Table
362) → continue (skip; pump in COP per N1.2.1);
- Cat 4 HP with SAP code in `_TABLE_4A_WARM_AIR_SAP_CODES` (Cat 5
warm-air HPs distribute via ducted air, no water circulation
pump; warm-air fan handled separately by Table 5a "Warm air
heating system fans" row, S0380.161) → continue;
- Otherwise (Cat 4 HP, Table 4a default cascade, water-emitter)
→ apply Table 5a default per Appendix N3.1.
Per-line walk on ashp (SAP code 214 air-to-water HP, Cat 4, no PCDB,
"Post 2013" pump age):
worksheet (70)[Jan] = 3.0000 W
cascade pre-slice = 0.0000 W delta = -3.000 W
The -3 W winter gain shortfall over-stated cascade (84) Total gains
by -3 W in heating months → cascade SH demand +12.27 kWh/yr
(cascade 9302 vs worksheet 9290), pushing continuous SAP down 0.024
because the cost residual was driven by the +1.5 kWh × 12 month
shortfall flowing through the £0.0741 low-rate cost.
Closures:
ashp: ΔSAP -0.0240 → +0.0000 EXACT, Δcost +£0.55 → +£0.00 EXACT
gshp: ΔSAP -0.0178 → -0.0000 EXACT, Δcost +£0.41 → -£0.00 EXACT
ΔPE +36 → +25.51 (and ΔCO2 +7.33 → +6.31) — residuals narrow to the
Elmhurst-vs-spec HW PE annual-vs-monthly Table 12e/12d quirk only
(same pattern as the 16-variant lighting-PE deferred cohort,
scaled by HW kWh = 1138 vs 2384 → 25.51 vs 48.66). Cohort
Σ |ΔSAP_c| 0.07 → 0.03; all 25 cascade-OK variants now SAP+cost EXACT.
Cohort-1 (cert 0380 et al.) golden fixtures unaffected — those certs
lodge `main_heating_index_number` (PCDB Table 362) → HP gate skips
correctly → (70) = 0 preserved. Cert 000565 (HP main 1 + gas boiler
main 2) unaffected — wet-boiler branch fires for main 2.
Verbatim spec quote (SAP 10.2 Appendix N3.1, PDF p.105):
"For electric heat pumps: The electricity used by the water
circulation pump or fan is included within the calculated annual
space and hot water heating efficiency and is not included in
worksheet (230c). The default heat gain from Table 5a is
included via worksheet (70)."
Tests: 906 pass (+1), 0 fail. Pyright net-zero (35 → 35).
Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
SAP 10.2 Table 5a (PDF p.177) row "Warm air heating system fans
a) c)" computes the gain as SFP × 0.04 × V (W). Footnote c) sets
the default SFP to 1.5 W/(l/s) when no PCDB warm-air-unit record
is lodged; footnote a) applies the heating-season-only mask
(zero in summer months). Footnote c) further omits the gain when
the dwelling has balanced whole-house mechanical ventilation
(MVHR / MV) — same omission as the Table 4f kWh-side footnote e).
Pre-slice the cascade's `internal_gains_from_cert` only wired the
central-heating-pump row of Table 5a; the warm-air-fan gain helper
(`warm_air_heating_fan_w`) existed but was unwired. The kWh-side
parallel (Table 4f, 136.35 kWh/yr) was wired in S0380.158 — this
slice closes the symmetry on the gain side.
Per-line walk on electric 2 (SAP code 524 = Cat 5 ASHP with
warm-air distribution, V = 227.25 m³, no balanced MV):
worksheet (70)[Jan] = 13.6350 W
cascade (70)[Jan] = 0.0000 W delta = -13.635 W
worksheet (98c)[Jan] = 1600.43 kWh
cascade (98c)[Jan] = 1608.12 kWh delta = +7.69 kWh
13.635 W = 1.5 × 0.04 × 227.25 exactly. The -13.6 W winter gain
shortfall propagates through the §7 utilisation cascade and over-
states cascade SH demand by ~57 kWh/yr (cascade 9483 vs worksheet
9426), under-charging cost by ~£2.50 with opposite sign to the
S0380.156-.158 closures.
Fix: new `_any_main_system_has_warm_air_distribution(epc)` +
`_has_balanced_mechanical_ventilation(epc)` predicates in
`internal_gains.py`, mirroring `cert_to_inputs._TABLE_4A_WARM_AIR_SAP_CODES`
+ `_BALANCED_MV_KIND_NAMES` (kept here as siblings so the worksheet
layer stays free of rdsap deps). Orchestrator wires
`warm_air_heating_fan_w(sfp=1.5, dwelling_volume_m3)` into the
heating-season term of `pumps_fans_monthly_w` when warm-air
distribution is present and balanced MV is not.
Closures electric 2:
ΔSAP_c -0.1087 → -0.0000 EXACT
Δcost +£2.50 → -£0.00 EXACT
ΔCO2 +16.54 → +11.95 (joins lighting-PE deferred cohort)
ΔPE +97.69 → +48.66 (joins lighting-PE deferred cohort)
Electric 2 joins the 15-variant lighting-PE deferred cohort
(electric 1 + electric 3/5/6/7/8/9 + solid fuel 5/6/7/8 + solid
fuel 4/9/10/11 + electric 2) where SAP/cost are EXACT but PE/CO2
carry an Elmhurst-vs-spec MONTHLY-factor offset (cohort uses
Table 12 annual factors on the off-peak HW immersion line; spec
mandates Table 12d/12e monthly per the header).
Verbatim spec quote (SAP 10.2 Table 5a row "Warm air heating
system fans a) c)", PDF p.177):
"Warm air heating system fans a) c) SFP × 0.04 × V"
Footnote c): "SFP is the specific fan power from the database
record for the warm air unit if applicable; otherwise
1.5 W/(l/s). These values of SFP include an in-use factor.
If the heating system is a warm air unit and there is balanced
whole house mechanical ventilation, the gains for the warm air
system should not be included."
Footnote a): "... Set to zero in summer months. ..."
Σ |ΔSAP_c| across 25-variant cohort: 0.18 → 0.07 (~60% reduction).
No regressions on the other 24 variants or any golden fixture —
gate keyed on Table 4a warm-air SAP code frozenset (only electric
2 in the corpus has a code in that set).
Tests: 905 pass (+1), 0 fail. Pyright net-zero (35 → 35).
Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
SAP 10.2 Table 5a (PDF p.177) row "Central heating pump in heated
space" only applies to mains with a water-loop circulation pump.
Footnote a) names two exclusions verbatim ("Does not apply if a
heating system used solely for domestic hot water. ... Not applicable
for electric heat pumps from database."), and the row's name carries
the implicit third: dry mains with no central heating pump (electric
storage heaters, electric direct-acting, solid-fuel room heaters
without back-boilers) — the row simply doesn't list them.
Pre-slice `internal_gains_from_cert` gated only on Note a) (HP
exclusion), applying `central_heating_pump_w(date_category=...)` to
every non-HP main. The default UNKNOWN-date branch added 7 W of pump
gain to (70)m for every dry-system fixture in the controlled-variable
corpus, even though the worksheet (70)m = 0 every month.
Per-line walk on electric 3 (SAP code 401 "Manual charge control"):
cascade (73)[Jan] = 640.21 W
worksheet (73)[Jan] = 633.21 W delta = +7.00 W
cascade (70)[Jan] = 7.00 W
worksheet (70)[Jan] = 0.00 W Table 5a inapplicable
The +7 W winter-month gain lowered cascade SH demand by ~38 kWh/yr
(cascade 11050 vs worksheet 11088). At Table 32 18-hour low-rate
~7.4 p/kWh that's £2.50/yr under-charging — matching the cluster's
uniform Δcost = -£1.96..-£2.80 pattern. Continuous SAP rose ~+0.10
because cost dominates the ECF.
Fix: new `_any_main_system_has_central_heating_pump(epc)` predicate
in `internal_gains.py`, mirroring `cert_to_inputs._is_wet_boiler_main`
(S0380.149 — Table 4f kWh side). Wet if any non-HP main lodges:
- sap_main_heating_code in {101-141, 151-161, 191-196} (gas/oil/
solid-fuel/electric boilers per Table 4a/4b),
- main_heating_index_number (PCDB Table 322 record),
- main_heating_category in {1, 2} (RdSAP central heating), OR
- heat_emitter_type in {1, 3} (radiators / fan-coil per Table 4d).
Dead `_all_main_systems_are_heat_pumps` helper removed (the new
predicate subsumes its role).
Cluster closures (10 variants):
electric 3: SAP +0.1215 → -0.0000, cost -£2.80 → -£0.00
electric 5: SAP +0.1081 → -0.0000, cost -£2.49 → -£0.00
electric 6: SAP +0.1081 → -0.0000, cost -£2.49 → -£0.00
electric 7: SAP +0.1017 → -0.0000, cost -£2.34 → -£0.00
electric 8: SAP +0.0941 → -0.0000, cost -£2.17 → -£0.00
electric 9: SAP +0.1199 → -0.0000, cost -£2.76 → -£0.00
solid fuel 4: SAP +0.0850 → -0.0000, cost -£1.96 → -£0.00
solid fuel 9: SAP +0.1072 → -0.0000, cost -£2.47 → -£0.00
solid fuel 10: SAP +0.1134 → +0.0000, cost -£2.61 → -£0.00
solid fuel 11: SAP +0.0912 → +0.0000, cost -£2.10 → +£0.00
Σ |ΔSAP_c| across 25-variant cohort: 1.24 → 0.18. All 10 cluster
variants now join the lighting-PE +48.66 / CO2 +11.95 deferred
cohort (Elmhurst-vs-spec monthly factor quirk, same shape as
electric 1 + solid fuel 5/6/7/8 from prior closures).
Verbatim spec quote (SAP 10.2 Table 5a row 1, PDF p.177):
"Central heating pump in heated space, 2013 or later 3 a)"
"Central heating pump in heated space, 2012 or earlier 10 a)"
"Central heating pump in heated space, unknown date 7 a)"
The row name ("Central heating pump") gates by construction: dry
systems have no central heating pump and the row's three sub-rows
don't apply.
No regressions on the other 31 variants or any golden fixture; the
6 Elmhurst U985 fixtures lodge PCDB index → the new predicate
returns True → pump_w unchanged.
Tests: 904 pass (+1), 0 fail. Pyright net-zero (35 → 35).
Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
SAP 10.2 Table 4a (PDF p.166) Cat 7 "Electric storage heaters"
splits the responsiveness R between two sub-tables:
Off-peak tariff:
Slimline storage heaters ... R = 0.2 402
Convector storage heaters ... R = 0.2 403
Slimline + Celect-type control ... R = 0.4 405
Convector + Celect-type ctrl ... R = 0.4 406
24-hour heating tariff:
Slimline storage heaters ... R = 0.4 402
Convector storage heaters ... R = 0.4 403
Slimline + Celect-type control ... R = 0.6 405
Convector + Celect-type ctrl ... R = 0.6 406
Per SAP 10.2 §12.4.3 (PDF p.36) the 18-hour tariff has electricity
at low rate for 18 hours per day with at most 6h of interruption /
2h max each — operationally equivalent to 24-hour for storage-heater
charging. The cascade therefore routes EIGHTEEN_HOUR + TWENTY_FOUR_
HOUR through the 24-hour Table 4a sub-row.
Pre-slice `_responsiveness` keyed on `sap_main_heating_code` only
and returned R=0.2 for code 402 regardless of tariff. The existing
docstring already flagged the gap:
402: 0.20, # Slimline storage heaters (24-hr tariff: 0.40)
... "promote to (sap_code, tariff) lookup when 24-hour fixture
surfaces; until then the off-peak default applies (under-shoots
R for the 24-hour case)."
Per-line walk on electric 5 (sap_main_heating_code=402 +
meter_type="18 Hour"): cascade T_living (87)[Jan] = 20.1213 vs
worksheet 19.6519, (92)[Jan] = 18.6996 vs worksheet 18.2063, (93)
[Jan] = 19.0996 vs worksheet 18.6063 (cascade +0.4933 K throughout
the cascade). Back-solve from worksheet T_living=19.6519 via the
Table 9b Tsc formula:
Tsc(R=0.4) = 0.6 × (21-2) + 0.4 × (4.3 + 0.9933 × 705.4/210.23)
= 11.4 + 0.4 × 7.6325 = 14.4528
ΔT = 21 - 14.4528 = 6.5472
u_sum = 0.5 × 6.5472 × (7² + 8²) / (24 × 11.43) = 1.3481
T_living = 21 - 1.3481 = 19.6519 EXACT match.
Adds:
- `_CONTINUOUS_CHARGING_TARIFFS: frozenset[Tariff]` = {EIGHTEEN_
HOUR, TWENTY_FOUR_HOUR} — the tariffs treated as "24-hour
heating" for Table 4a R selection.
- `_RESPONSIVENESS_24_HOUR_OVERRIDE_BY_SAP_CODE: dict[int, float]`
— the override table for codes 402/403/405/406 (404, 407, 409
keep the same R in both sub-tables).
- `tariff: Optional[Tariff]` parameter to `_responsiveness`, with
the override consulted before the off-peak default.
- Tariff threaded through both call sites of MIT cascade (rating
+ demand paths) via `tariff_from_meter_type`.
Closures electric 5:
ΔSAP −1.1759 → +0.1081 (91% reduction)
Δcost +£27.09 → −£2.49
ΔCO2 +62.72 → +7.30 kg
ΔPE +438.03 → +0.07 kWh (essentially EXACT)
Electric 5 now joins the same residual cluster as electric 3/6/7/8/
9 (+0.09..+0.12 SAP, −£2..−£3 cost, +£7 CO2) — the cluster that
the prior handovers suspected was a shared shave-the-residual gap.
No regressions on the other 24 cohort variants. Extended handover
suite: 903 pass / 0 fail (was 902 — +1 from the new AAA test).
Pyright net-zero (43 → 43).
Σ |ΔSAP_c| across the 25-variant cohort: 2.30 → 1.24 (~46%
reduction from this slice).
Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
SAP 10.2 Table 4f (PDF p.174) row "Warm air heating system fans"
+ footnote e) — verbatim:
Warm air heating system fans e) SFP × 0.4 × V
e) SFP is the specific fan power from the database record for the
warm air unit if applicable; otherwise 1.5 W/(l/s). These values
of SFP include the in-use factor.
If the heating system is a warm air unit and there is balanced
whole house mechanical ventilation, the electricity for warm
air circulation should not be included in addition to the
electricity for mechanical ventilation. However it is included
for a warm air system and MEV or PIV from outside.
V is the volume of the dwelling in m³.
Per Table 4a (PDF p.165-166), warm-air systems are:
- Category 5: heat pumps with warm-air distribution (codes 521,
523, 524 electric; 525, 526, 527 gas-fired)
- Category 9: warm-air systems NOT heat pump (501-511, 520 gas-
fired; 512-514 liquid-fired; 515 Electricaire electric)
Pre-slice the cascade's `_table_4f_additive_components` docstring
explicitly listed "(230b) Warm-air heating fans + (230c) for warm-
air pump" as "Not yet wired" — every Cat 5 / Cat 9 warm-air corpus
variant resolved `pumps_fans_kwh_per_yr` to 0. For electric 2 (code
524 Cat 5 air-source warm-air HP, no MV, V = 227.25 m³), the P960
worksheet block 11a (249) lodges 136.35 kWh × 13.67 p/kWh = £18.64
where the cascade computed 0.
New `_TABLE_4A_WARM_AIR_SAP_CODES` frozenset (22 codes) + leaf helper
`_table_4f_warm_air_heating_fans_kwh(main, dwelling_volume_m3,
has_balanced_mv)` wired at the orchestrator pumps_fans summation
alongside the existing circulation-pump and gas-flue-fan helpers.
Footnote-e balanced-MV omission reads `epc.sap_ventilation.
mechanical_ventilation_kind` via the new
`_has_balanced_mechanical_ventilation` predicate (returns True for
MVHR / MV; False for MEV / PIV / NATURAL).
Per-line walk evidence: cascade `pumps_fans_kwh_per_yr` = 0.0000 vs
worksheet (249) = 136.3500 = 1.5 × 0.4 × 227.25 exactly. Default SFP
from footnote e matches; PCDB warm-air-unit SFP lookup deferred
until a fixture exercises it.
Closures electric 2:
pumps_fans_kwh_per_yr: 0 → 136.35 (EXACT match to worksheet)
ΔSAP +0.7002 → −0.1087 (residual swung past worksheet — the +0.70
pre-slice was an under-counted-fan offset; spec-correct fix lands
just past zero, exposing a small upstream SH cascade gap likely
in the Cat 5 warm-air HP Table 4a SH efficiency or Table 9c MIT
cascade for warm-air mains — follow-up slice)
Δcost −£16.14 → +£2.50
ΔCO2 −2.37 → +16.54 kg
ΔPE −108.58 → +97.69 kWh
No regressions on the other 24 cohort variants — the warm-air-code
gate fires only when `sap_main_heating_code` is in the new frozenset
and only electric 2 has a warm-air SAP code in the corpus. Extended
handover suite: 902 pass / 0 fail (was 901 — +1 from the new AAA
test). Pyright net-zero (43 → 43).
Σ |ΔSAP_c| across the 25-variant cohort: 2.87 → 2.30 (~20%
reduction from this slice).
Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
SAP 10.2 Table 2b note b) (PDF p.159) — verbatim:
Multiply Temperature Factor by 0.9 if there is separate time
control of domestic hot water (boiler systems, warm air systems
and heat pump systems).
The parenthetical list restricts the rule to systems where the heat
generator (boiler / warm-air / HP) is the device heating the
cylinder. Electric immersion is NOT in that list because the
immersion isn't a heat-generator system feeding DHW — it sits inside
the cylinder. The ×0.9 multiplier reflects shorter cylinder-heating
periods when a boiler / HP / warm-air operates on a separate timer
for DHW vs SH; if the heat generator doesn't feed the cylinder at all
(because the immersion does), there's no such timing effect.
Pre-slice `_separately_timed_dhw` returned True for any Cat 4 HP
main BEFORE consulting WHC (line 3872 `if main.main_heating_category
== 4: return True`). For electric 2 (sap_main_heating_code=524 Cat 5
warm-air ASHP, main_heating_category=4 per Elmhurst mapper, WHC=903
electric immersion + cylinder + cylinder thermostat lodged), the
cat-4 branch fired before the existing `_is_electric_water` check
could route the cert to False. The cascade applied ×0.9 to the
Temperature Factor (53), pulling (55) from 1.2294 → 1.1064 → cascade
annual (56) = 403.87 vs worksheet (56) annual = 448.73.
Same WHC=903 principle as the prior slice S0380.156 (Table 3 zero-
loss list for electric immersion): when HW is independent of the
main heating, main-heating-specific DHW rules don't apply — even
when the main happens to be a HP / boiler / warm-air system.
Fix: new top-of-function `if epc.sap_heating.water_heating_code ==
_WHC_ELECTRIC_IMMERSION: return False` guard in
`_separately_timed_dhw`. Reuses the constant introduced in S0380.156.
Closures electric 2:
Cylinder (56) storage loss annual 403.87 → 448.73 (matches
worksheet 1.2294 × 365 = 448.73 EXACT within rounding)
HW kWh demand 2339.24 → 2384.12 (matches worksheet (62)/(64) =
2384.116 EXACT)
ΔSAP +0.8118 → +0.7002
Δcost −£18.71 → −£16.14
ΔCO2 −7.21 → −2.37 kg
ΔPE −161.68 → −108.58 kWh
The remaining +0.70 SAP residual is a separate upstream gap (likely
warm-air-HP SH cascade or Table 4a SH efficiency for code 524) —
follow-up slice.
No regressions on the other 24 cohort variants. Cohort-1 ASHP certs
(Cat 4 HP + WHC=901 = HW from HP + cylinder) keep ×0.9 as before
because their WHC=901 doesn't trigger the new guard. Extended
handover suite: 901 pass / 0 fail (was 900 — +1 from the new AAA
test). Pyright net-zero (43 → 43).
Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
SAP 10.2 Table 3 (PDF p.160) verbatim:
Primary loss is set to zero for the following:
Electric immersion heater
Combi boiler ...
CPSU ...
Boiler and thermal store within a single casing
Separate boiler and thermal store connected by no more than 1.5
m of insulated pipework
Direct-acting electric boiler
Heat pump (...) with hot water vessel integral to package
The Elmhurst WHC=903 lodging signals exactly the first row: "HW from
a separate electric immersion heater" — the cylinder is heated by an
immersion element inside the tank, no primary pipework between any
heat generator and the cylinder. The rule is universal: regardless
of what main heating exists for space heating, electric immersion
means no primary circuit means no primary loss.
Pre-slice `_primary_loss_applies` only consulted `water_heating_code`
in the Table 4a wet-boiler branch (codes 151-161 / 191-196). The Cat
4 HP branch returned True unconditionally when no PCDB record was
lodged; the Cat 1/2 boiler branch returned True unconditionally; the
PCDB Table 322 + Table 4b non-PCDB branches likewise. For the
electric 2 corpus variant (sap_main_heating_code=524 Cat 5 warm-air
ASHP, main_heating_category=4 per Elmhurst mapper, no PCDB record,
WHC=903 + cylinder), the Cat-4 branch falsely returned True and the
cascade added ~510 kWh/yr primary loss to a system with no primary
circuit at all.
Per-line walk discipline applied: cascade `water_heating_from_cert`
output dump showed `primary_loss_monthly_kwh_annual = 509.98` while
worksheet (59)m = 0 every month → spec lookup found Table 3 verbatim
"Electric immersion heater" zero-loss line.
Adds `_WHC_ELECTRIC_IMMERSION: Final[int] = 903` constant + a
top-of-function `if water_heating_code == _WHC_ELECTRIC_IMMERSION:
return False` guard that fires before any of the system-type-keyed
branches.
Closures electric 2:
HW kWh 2849.22 → 2339.24 (matches worksheet (62)/(64) = 2384.12
within the residual ~45 kWh storage-loss gap)
ΔSAP −0.4584 → +0.8118 (cascade swung past the worksheet by +1.27
— the pre-slice 'near-correct' value was offsetting cascade bugs
per [[feedback-software-no-special-handling]]; the +0.81 residual
exposes a separate upstream gap to chase in a follow-up slice)
Δcost +£10.56 → −£18.71
ΔCO2 +47.89 → −7.21 kg
ΔPE +443.13 → −161.68 kWh
No regressions on the other 24 cohort variants — only electric 2 has
the (Cat 4 HP, no PCDB, WHC=903) combination in the corpus.
Extended handover suite: 900 pass / 0 fail (was 899 — +1 from the
new AAA test). Pyright net-zero (43 → 43).
Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
Adds simulated case 7: case 6 (P960-0001-001431) with the heating swapped
to a CONDENSING OIL COMBI (SAP code 130, Table 4b 82/73) and the cylinder
removed — combi instantaneous DHW (WHC 901), Table 3a keep-hot combi loss
(61) = 600 kWh/yr, no primary/storage loss, boiler interlock PRESENT (no
−5pp). This is the heating archetype golden cert 0240-0200-5706-2365-8010
uses, which case 6 (SAP code 127, a *regular* condensing oil boiler +
cylinder) never exercised.
The cascade reproduces the case-7 worksheet EXACTLY at abs=1e-4 on every
top-level SapResult output with ZERO calculator changes:
(211) 7865.4304 (213) 7556.9821 (219) 3496.8121 (98c) 12646.3783
(255) 1123.3372 (257) 1.9631 (272) 5738.9315 (258) 73
This validates the SAP 10.2 Appendix D Eq D1 combi efficiency blend +
Table 3a keep-hot combi loss + Table 4b code 130 (82/73) path, and
exonerates the combi mechanism as the source of 0240's API-path residual
— which therefore lives in 0240's fabric/demand or the API mapper.
Test-only slice (no impl change). New fixture file: 0 pyright errors.
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
Prerequisite for the SAP 10.2 p.186 two-systems-different-parts MIT.
When two main systems heat different parts of a dwelling, §14.1 Main
Heating2 lodges its OWN "Heat Emitter" + "Main Heating Controls Sap"
(simulated case 6: Main 1 radiators / control 2106 serving the living
area, Main 2 underfloor / control 2110 serving elsewhere). The extractor
+ mapper dropped both — `MainHeatingDetail.heat_emitter_type` and
`main_heating_control` came through as empty-string sentinels, so the
cascade saw system 2 as having no responsiveness (defaulted R=1.0) and no
control type.
- `MainHeating2` datatype gains `heat_emitter` + `heating_controls_sap`.
- The extractor reads them from the §14.1 block.
- `_map_elmhurst_main_heating_2` maps them via the same helpers as Main 1
(`_elmhurst_heat_emitter_int` → underfloor-in-screed = emitter 2, Table
4d R=0.75; `_elmhurst_sap_control_code` → 2110, Table 4e type 3),
threading the dwelling floor + age band for the underfloor subtype.
Empty-string fallback preserved for the legacy DHW-only Main 2 (cert
000565 §14.1 omits emitter/control). No cascade output changes yet — the
MIT consumer lands in S0380.205. Full suite 2358 pass + 0 fail.
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
The Elmhurst extractor crashed parsing simulated-case-6's room-in-roof
window rows: the §11 "Location" cell "Roof of Room in Roof" wraps across
the layout prefix/suffix blocks and leaked into the glazing-type phrase
("Double between 2002 Roof of Room and 2021 in Roof" → UnmappedElmhurst-
Label). Fix (`_parse_window_from_anchors`): detect the roof-of-room
location tokens, strip them from the before/after blocks so the glazing
phrase reconstructs cleanly, and set location="Roof of Room".
Mapper: `_is_elmhurst_roof_window` gains a "Roof of Room" location branch
(highest-confidence rooflight signal, above the BP-roof-type / U>3.0
gates); `_ELMHURST_ROOF_WINDOW_U_BY_GLAZING` gains "Double between 2002
and 2021" → 2.30 (case 6 lodges the already-inclined roof-window U, so
the +0.30 inclination adjustment must not double-apply).
This is the site-notes mirror of S0380.198 (API window_wall_type=4):
both paths now route room-in-roof rooflights to (27a) at the inclined U.
Validated against the case-6 P960 worksheet at abs=1e-4:
(27) Windows = 22.7408 (cascade 22.7407)
(27a) Roof Windows = 13.0375 (cascade 13.0375, EXACT)
(31) ext area = 336.13
Case 6 is pinned only on the §3 window line refs (new standalone test,
not added to the section-pin `_FIXTURES`) because its DUAL main heating
(51% rads + 49% underfloor, oil) makes the §10/§12 per-system lines
non-comparable to SapResult's aggregated fields — documented in the
fixture module. Summary mirrored to Summary_001431_case6.pdf.
Suite: 2355 passed, 1 skipped. New code: 0 pyright errors.
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
Promotes user-simulated "case 5" (detached, sandstone-walled, room-in-roof
cousin of golden cert 0240) to an e2e worksheet fixture pinning the WHOLE
extractor → mapper → calculator pipeline at abs=1e-4 on all 11 Block-1
line refs. Its worksheet prints the exact RR-gable routing S0380.196
implements, validating that fix against ground truth:
Roof room Main Gable Wall 1 15.68 U=0.35 (29a) Exposed → walls @ main-wall U
Roof room Main remaining area 61.73 U=0.30 (30) A_RR shell − Σ gables
External roof Main 14.52 U=0.11 (30) loft residual
Roof room Main Gable Wall 2 15.68 U=0.25 (32) Party → party @ 0.25
gable area = 6.40 × 2.45 (§3.9.1 default RR storey height); A_RR remaining
= 12.5√(83.2/1.5) − 2×15.68 = 93.09 − 31.36 = 61.73 (RdSAP 10 §3.9.1(e)).
Confirms a DETACHED dwelling can lodge a Party RR gable (Table 4 p.22
row 2) — so my S0380.196 mapping (gable_wall_type 0=Party, 1=Exposed) is
correct; do not flip it.
Two extractor/mapper gaps surfaced and fixed (case 5 is the forcing test):
- Sandstone wall label "SS Stone: sandstone or limestone" had no
`_ELMHURST_WALL_CODE_TO_SAP10` entry (raised UnmappedElmhurstLabel).
Added "SS" → 2 (WALL_STONE_SANDSTONE), matching 0240's API
wall_construction=2 (cross-mapper parity).
- Roof "Insulation Thickness 400+ mm" was silently dropped: the four
thickness parsers used `.split()[0].isdigit()`, which rejects the
trailing "+" → None → u_roof fell back to the age-J default 0.16
instead of 0.11 (+1.09 W/K roof, the whole 0.12 SAP gap). Added
`_parse_thickness_mm` (strips to leading digits) and applied it at all
four sites (walls / alt-wall / roof / floor). The only existing fixture
with "400+ mm" (000565 Stud Wall) routes via the RIR regex, unaffected.
Result: case 5 cascade ≡ worksheet at 1e-4 on SAP/ECF/cost/CO2 + every
energy stream. Neither gap affects 0240 (its API path captures both the
sandstone code and "400mm+"); 0240's residual is therefore non-fabric.
Suite: 2353 passed, 1 skipped. New code: 0 pyright errors.
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
Adds the user-simulated case-4 worksheet as e2e fixture `001431_6035` —
reproduces golden cert 6035's full floor geometry (Main ground-floor HLP
15.99 + first-floor HLP 8.32, the asymmetric upper storey) and 8 windows.
All 11 Block-1 line refs pin at abs=1e-4 against the worksheet (SAP 68,
ECF 2.2802, cost 937.2341, CO2 4682.3494, space 15745.3260, main fuel
18744.4357).
This is the 4th independent 1e-4 confirmation across the 6035 archetype
(sim cases 1-4). Case 4 matches 6035 on floors + window areas; the
residual ~50 kWh / £11 cascade delta vs 6035 is two lodged inputs only
(largest window orientation N vs S; meter type "Dual" vs API 2), not
calculator behaviour.
Conclusion: the cascade reproduces the spec engine exactly for 6035's
geometry, so 6035's +19 PE vs the lodged register is lodged-register
divergence (the gov.uk register's rounded value vs the spec-exact
worksheet), NOT a calculator gap. 6035 is a "pin-forever" lodged-only
cert. Bugs surfaced + fixed along the way: S0380.192 (Simplified-RR
remaining area) and S0380.193 (suspended-floor sealed rule).
2341 passed (+11), 0 failed; pyright net-zero.
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
Adds the user-simulated case-3 worksheet as e2e fixture `001431_rr8` —
Main + Extension + Simplified room-in-roof with 8 windows (≈14.15 m²,
reproducing golden cert 6035's glazing) and Main ground-floor HLP 15.99.
All 11 Block-1 line refs pin at abs=1e-4 against the worksheet (SAP 68,
cost 951.3425, CO2 4767.4862, space 16086.3557, main fuel 19150.4235,
HW 3307.2639, lighting 262.0885).
This is the third independent 1e-4 confirmation that the cascade
reproduces the spec engine for the 6035 archetype (after S0380.192
Simplified-RR + S0380.193 suspended-floor). It differs from 6035 in one
input only — the Main first-floor HLP (15.99 here vs 6035's 8.32) — so
6035's +19 PE vs the lodged register is lodged-register divergence, not
a calculator gap. A byte-identical 6035 replica (first-floor HLP 8.32)
would let 6035 itself be pinned directly to close that out.
2330 passed (+11), 0 failed; pyright net-zero.
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
RdSAP 10 §5 (PDF p.29) "Floor infiltration (suspended timber ground
floor only)", age band A-E, splits on whether a floor U-value is
supplied:
a) [U-value supplied] if floor U-value < 0.5 → "sealed", (12) = 0.1
b) [no U-value supplied] retro-fitted insulation → "sealed" 0.1;
otherwise "unsealed", (12) = 0.2
`_has_suspended_timber_floor_per_spec` fed the cascade's COMPUTED default
U into rule (a), so an as-built/uninsulated suspended-timber floor whose
default U happens to be < 0.5 was marked "sealed" (0.1) where Elmhurst
uses "unsealed" (0.2). That dropped (18) infiltration 0.85 → 0.75, (25)
effective ACH, HTC, and understated space heating ~450 kWh.
Fix: gate rule (a) on `floor_u_value_known` — a computed default U is not
a supplied value, so it falls through to (b). Verified against the
cert 001431 sim-case-2 worksheet: floor "As built", U=0.43 (matches the
worksheet's (28a) 0.4300 exactly), (12)=0.2 unsealed. Golden cert 6035
(also a suspended uninsulated floor) is unaffected — its U=0.63 ≥ 0.5
already routed to unsealed.
Promotes sim case 2 to the e2e harness as `001431_rr` (Main + Extension
+ Simplified room-in-roof — the 6035 archetype). All 11 Block-1 line
refs pin at abs=1e-4, locking BOTH this fix and S0380.192 (Simplified-RR
remaining area) end-to-end: SAP 69, cost 920.5046, CO2 4566.7090, space
15269.8593, main fuel 18178.4039. 2319 passed (+11), 0 failed; pyright
net-zero.
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
Summary PDFs preprocessed from `pdftotext -layout` wrap the windows-table
header across several lines. The third header line's tail ("U value / g
value / Draught Proofed / Permanent Shutters") tokenises to "value value
Proofed Shutters" and lands directly above the FIRST window's data row.
Because the first window in a building part has `before_start = 0`, its
prefix block reaches back into that header remnant. The remnant is
neither an orientation nor a building-part fragment, so it survived the
pops in `_compose_window_descriptors` and leaked into glazing_type as
"value value Proofed Shutters Double between 2002 and 2021" (windows 2-3,
whose prefix starts after the previous window's manufacturer line, were
clean).
Fix: the glazing-type phrase always starts with a glazing-start word
(Single/Double/Triple/Secondary), so trim any prefix fragments preceding
that word before joining the glazing type. Orientation/bp pops still run
on the full prefix, so they are unaffected.
Reproduced from `sap worksheets/Recommendations Elmhurst Files/
cavity_wall_insulation - main wall/before/Summary_001431.pdf`. Added a
regression test driving the real `_extract_windows_from_layout` path with
the verbatim tokenised header+rows. 2306 passed (+4), pyright net-zero.
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
Adds the user-simulated 001431 case (the cert that drove S0380.189/.190)
as an Elmhurst-only e2e fixture: Summary PDF → extractor → mapper →
calculator, every Block-1 SapResult field pinned against the
P960-0001-001431 worksheet at abs=1e-4. All 11 pins pass with zero
residual — the case is clean, confirming the S0380.190 gas-combi fuel
derivation closes the Summary path natively.
Verified the handover's flagged "+0.0007 SAP" was a target artifact, not
a cascade gap: the worksheet displays ECF (257) rounded to 1.6047 and
integer SAP (258)=78; the cascade's continuous SAP is computed from the
UNROUNDED ECF = (255)*(256)/((4)+45) = 660.9750*0.4200/173.0, giving
77.6147 — which matches the worksheet's own unrounded value. Pinning the
continuous SAP from the display-rounded ECF (→ 77.6144) was the wrong
target. Block-1 line refs all match exactly: (211) 10699.7225, (219)
3327.1592, (231) 86.0, (232) 283.2229, (255) 660.9750, (272) 3000.1664,
Σ(98) 8987.7669.
Summary mirrored into the tracked fixtures dir as
Summary_001431_gas_combi.pdf (distinct name — the corpus reuses cert
001431 across every heating variant); source Summary + worksheet tracked
under sap worksheets/golden fixture debugging/ as the pin ground truth.
2302 passed (+11), 0 failed; pyright net-zero on new/changed files.
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
CH6's P960 worksheet input lodges Distribution Loss = "Two adjoining
dwellings sharing a single heating system" → (306) DLF = 1.0000, vs CH4's
"Calculated" → 1.5 → (306) = 1.4500. That DLF choice swings SAP/cost/CO2/PE
materially, but it is NOT present in the Summary PDF that the corpus pipeline
consumes (Summary → ElmhurstSiteNotesExtractor → mapper → calculator).
Proven empirically with a user-supplied controlled pair (CH adjoined
dwellings/Summary_001431 (1) vs (2)): the two Summaries are byte-identical
across every RdSAP INPUT field, differing only in the derived header
(SAP 80 vs 75, bill £954 vs £1237, emissions 5.407 vs 7.394 t). A
case-insensitive scan of the CH6 Summary for "distribution"/"adjoin" returns
0 hits. Since CH4/CH6 Summaries are themselves identical bar fuel type, no
Summary-derivable rule can yield CH4=1.45 AND CH6=1.0.
Doc-only change (comment in _EXPECTATIONS); 20/20 community-heating corpus
tests pass. Closes the CH6 re-litigation: pin held.
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
SAP 10.2 worksheet block 12b/13b (367)/(467) for a community heating
electric heat pump (Table 4a code 304 → Table 12 fuel 41 "heat from
electric heat pump"). The HP meters grid electricity, so per Table 12
note (s)/(t) + block 12b/13b footnote (a) its emission/PE factor is the
MONTHLY Table 12d/12e cascade (fuel 41 = standard-electricity profile),
weighted by the network heat profile, then × 1/heat-source-eff (1/COP):
(367)/(467) = [(307)+(310)] / COP × Σ((307+310)_m × factor_m)/Σ(...)
Per-line walk of CH3 (the displayed (367) 0.1535 / (467) 1.5717 are PDF
artifacts; the (373)/(473) totals reconcile only with):
CO2 factor = 0.15040 (monthly Table 12d wtd) vs cascade annual 0.136
PE factor = 1.55692 (monthly Table 12e wtd) vs cascade annual 1.501
Pre-slice the cascade routed code 304 through the non-electric branch
(`_co2_factor_kg_per_kwh(main) × 1/COP` = annual × scaling). New
`_is_heat_network_electric_main` (heat-network main whose fuel has a
Table 12d monthly set — i.e. fuel 41) routes all four factor helpers
(main + HW, CO2 + PE) through the monthly cascade × 1/COP. Non-electric
heat networks (gas 51 / oil 53 / coal 54) have no monthly set → annual
path unchanged (CH1, CH6 untouched).
Closure (CH3 was already SAP+cost EXACT):
CH3 (HP/Elec) CO2 −75.32→+0.0000 (= [(307+310)/3]×(0.1504−0.136)),
PE −249.32→−0.0000 (× (1.5569−1.501)) — FULLY EXACT
Corpus now 40/41 EXACT on all four metrics. Only CH6 remains: its
worksheet lodges a manual DLF=1.0 ("two adjoining dwellings") absent
from the Summary PDF (byte-identical to CH4 bar fuel type) — an
architectural limit, not a cascade gap. 2226 pass + 1 skip + 0 fail
(tolerances 1e-4 all metrics); pyright net-zero 43→43.
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>