Adds a committed integration test driving the full API path — raw gov-EPC
response → from_api_response → cert_to_inputs → calculate_sap_from_inputs —
across all 1000 certs in the in-repo RdSAP-21.0.1 corpus, and pins the
aggregate accuracy of our continuous SAP (plus CO2 and primary energy)
against each cert's lodged figures. Mirrors scripts/eval_api_sap_accuracy.py
but runs in CI off the committed corpus (~2s, no /tmp sample needed).
Scoped to RdSAP-21.0.1 — the SAP 10.2-era schema whose lodged rating uses the
same methodology we compute (a fair target). Pre-SAP10 schemas (17.x-20.0.0)
lodge SAP 2012 ratings and are out of scope (guarded for mapping only by
test_mapper_corpus.py).
Current: SAP within-0.5 = 65.0%, MAE = 1.174 (tight floor/ceiling — the
optimised gauge). CO2 MAE = 0.27 t/yr (bias +0.17) and PE MAE = 14.6
kWh/m2/yr (bias +8.9) are reported + loosely guarded: cost is well-calibrated
but CO2/PE both run ~+5-10% high (uniform across fuels — a systematic
CO2/PE-factor or scope gap, not yet investigated). Thresholds ratchet as
slices tighten each metric.
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
The mixer-shower hot-water demand (worksheet 42a) divided N_shower by the
count of MIXER outlets only. But SAP 10.2 Appendix J step 1a is explicit:
"Establish how many shower outlets are present in the dwelling, Noutlets
(including in the count any instantaneous electric showers)" — and the
electric-shower step (64a) uses that same Noutlets from step 1a. So a
dwelling with both a mixer and an electric shower assigned the FULL N_shower
to the mixer system AND billed the electric shower on top of it, double-
counting shower demand → over-counted main HW → under-rated the dwelling.
Fix: thread the electric-shower count into the mixer demand so the
denominator is the total outlet count (mixer + electric), iterating the
warm-water draw over the mixer outlets only (per step 1e).
shower_types=1,2 cohort: -0.37 median -> +0.28 (crossed zero); API gauge
68.4% -> 69.0% within-0.5. Golden cert 0300-2747 (1 mixer + 1 electric)
re-pinned: PE +0.93 -> -0.10, CO2 +0.25 -> +0.15 (both toward zero,
confirming the double-count). Worksheet harness 47/47, 0 divergers (the
Elmhurst fixtures have no electric showers).
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
The no-PCDB MEV fan-electricity path fed the SAP 10.2 Table 4g default SFP
(0.8 W/(l/s)) directly as SFPav. But Table 4g note 3 (PDF p.176) is explicit:
the default SFP values "are to be multiplied by the appropriate in-use factor
for default data from the PCDB" — PCDB Table 329 system_type 10 ("default
data, used when SFP is taken from Table 4g rather than the PCDB"), IUF 2.5
(duct-agnostic per note 2). Table 4h, which previously held these factors, is
retired ("no longer used – data now stored in the PCDB").
Omitting the IUF under-billed the index-less MEV fan electricity by 2.5x
(SFPav 0.8 instead of 0.8 x 2.5 = 2.0), so cost was too low and the cohort
over-rated. This is distinct from the with-index path, which already applies
the tested-product system_type-2 "no scheme" IUF (~1.45) per fan.
Index-less gas-house MEV cohort: +1.37 median -> -0.18 (12% -> 92% within 0.5),
no overshoot — the missing IUF was exactly the over-rate. API gauge 67.7% ->
68.4% within-0.5 (mean|err| 0.992 -> 0.986, signed +0.031 -> +0.006).
Worksheet harness 47/47, 0 divergers (Summary-path MEV certs carry a PCDB
index or are natural, so unaffected).
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
Orchestrator runs recommend_secondary_heating_removal; report._triggers_for
explains it via the lodged secondary_heating_type; harness catalogue + ARA seed
price it. Re-pins the golden/integration plans it shifts: it is a cheap (\£250)
SAP lever, so on gas-main certs lodging an electric secondary (691) it displaces
the \£12k ASHP (0330, 0036) or joins the all-beneficial-measures package (000490,
where its marginal SAP is 0 under the category-4 ASHP but the heater is still
physically removed). Consistent with the optimiser's existing kitchen-sink
package behaviour.
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
Two cascade tests on the worksheet-pinned 001431 build_epc() (the user's
before/after Summary PDFs trip the documented 001431 window-extraction bug, so
the repo's sanctioned 001431 baseline is used instead):
- electric-storage main (code 402) + secondary 691: removal reproduces the
secondary-removed cert at delta 0 — RdSAP §A.2.2 re-forces a default secondary,
matching the user's F35→F35 example;
- gas combi main (code 104) + secondary 691: removal strictly raises SAP
(74.22→77.61) — the Table 11 fraction reallocates to the cheaper main.
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
The gov-EPC API surfaces the assessor's RdSAP-assessed per-element U-values
as `roof_u_value` / `wall_u_value` / `floor_u_value` on each building part.
These were undeclared on the RdSAP 21.0.0/21.0.1 schemas, so `from_dict`
silently dropped them, and `heat_transmission` re-derived each U from the §5.6
/§5.7/§5.11 construction-default cascade. The gov OPEN data routinely redacts
the backing insulation thickness, so that re-derivation mis-bills an insulated
element as uninsulated.
RdSAP 10 §5.1: a known element U-value (documentary evidence / the lodged
RdSAP output) is used directly in place of the construction-default cascade.
Per [[project_per_cert_mapper_validation_state]] the gov API carries RdSAP
OUTPUT, so the lodged U reproduces the official's element heat loss exactly.
Worst case in the 2026 sample: cert 7921-0052-0940-5007-0663, an age-C
"Pitched, sloping ceiling" (rc=8) top-floor flat lodging roof_u_value=0.2 with
no thickness. The cascade returned the uninsulated 2.30 W/m²K → SAP 56.9 vs
lodged 80 (-23.09, the single largest error in the sample). The roof override
alone recovers ~15 SAP; the wall override (lodged 0.34 vs cascade) closes the
rest of this cohort.
Override applies to the MAIN wall only (alt-wall sub-areas keep their own
per-area U) and the part's floor=0. Fires only when the rare field is present
(9 of 909 computed certs), so the Summary path — which never lodges these
API fields — is untouched.
API gauge: 67.1% → 67.7% within-0.5, mean|err| 1.024 → 0.992.
Worksheet harness: 47/47, 0 divergers (unchanged).
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
Flat per-dwelling decommission price (sample_catalogue \£250) + 0.25 contingency
(covers unknown heater count / hard-wired-vs-plugged / repaint extent). The JSON
repo joins the contingency from config, proven by the new repo test. No composite
Products machinery — a lodged secondary is one roughly-fixed job, not room-scaled.
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
recommend_secondary_heating_removal offers one standalone Option that clears the
lodged secondary system. Eligibility is purely physical (offer iff
sap_heating.secondary_heating_type is set) — no effectiveness gate, since a
lodged secondary is a fixed emitter per RdSAP (portables are ignored), and the
electric-storage §A.2.2 no-op is the Optimiser's call (ADR-0028 decisions 1-2).
Priced at a flat per-dwelling decommission cost, not room-scaled.
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
The first overlay surface that sets fields to *absent* rather than to a
target state: _fold_secondary_heating clears sap_heating.secondary_heating_type
+ secondary_fuel_type, so the calculator's Table 11 secondary-fraction split
(SAP 10.2 §9a) routes 100% of space heating to the main. On an electric-storage
main RdSAP §A.2.2 re-forces a default secondary, making removal a no-op there —
left to the Optimiser to de-select (ADR-0028 decisions 2-3).
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
The §5.16 Table 22 thermal-mass-parameter (TMP) "always low-mass" set was
{timber 5, cob 7, park home 8}. But wall_construction code 8 is OVERLOADED by
the same gov-API/calc code-space divergence as the wall-U fix: the Summary
path's "PH" mapping uses 8 for park home, while the gov-EPC API enum uses 8
for SYSTEM BUILD (Summary system build = code 6). So every API system-built
cert was mis-rated as low-mass 100 kJ/m²K instead of masonry 250 (Table 22
lists system build as masonry — PDF p.48, line "System build 250...").
A too-low TMP shortens the §7 time constant tau = Cm/(3.6·H), over-cutting
the temperature reduction so mean internal temperature is UNDER-stated →
space-heating demand under-stated → SAP over-rated. This was the cause of the
uninsulated system-built over-rate cluster (n=9 gas-boiler certs at signed
+2.39 vs cavity +0.43 / solid-brick +0.08 at the same bands — a system-built-
specific anomaly with a spec-correct wall U).
Fix: drop 8 from the always-low set and gate it on `property_type` — code 8 is
the low-mass park-home value only when the dwelling really is a park home,
otherwise it is gov-API system build and keeps masonry 250. Disambiguated by
the same `property_type == "park home"` signal used elsewhere in the cascade.
Worksheet harness UNAFFECTED (47/47, 0 divergers): the Summary path uses code
6 for system build and code 8 only for genuine park homes (which stay
low-mass via the property_type gate). API gauge 65.3% -> 67.1% within-0.5
(mean|err| 1.059 -> 1.024, signed +0.050 -> -0.002). The uninsulated
system-built cluster collapses +2.82 -> +0.28 signed (0/11 -> 7/11 within
0.5). 2 AAA tests (parametrised code-8 system-built -> 250; park-home
property -> 100). pyright net-zero.
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
`_CYLINDER_SIZE_CODE_TO_LITRES` held only codes 2/3/4 (Normal/Medium/Large →
110/160/210 L); codes 5 (Inaccessible) and 6 (Exact) fell through to None,
so the Table-13 high-rate fraction AND the cylinder storage loss were skipped
for those certs (20 code-6 certs in the API sample).
Per RdSAP 10 Specification (10-06-2025) §10.5 Table 28 (PDF p.55):
- Code 6 "Exact": use the lodged measured volume. The gov API carries it in
`cylinder_size_measured` (e.g. 150 L) — now plumbed through the 21.0.0/21.0.1
schema → mapper → `SapHeating.cylinder_volume_measured_l`.
- Code 5 "Inaccessible": 210 L if off-peak electric dual immersion, 160 L from
a solid-fuel boiler, otherwise 110 L (n=0 in the current sample, but
spec-complete).
New `_cylinder_volume_l_from_code` centralises Table 28 resolution and replaces
the three raw-dict call sites (`_hot_water_cylinder_volume_l`, the cylinder
storage-loss path, and the PCDB performance check) so all three honour codes
5/6 identically. `_cylinder_inaccessible_volume_l` applies the code-5 context
rule via the existing immersion/off-peak-meter/solid-fuel-boiler detectors.
Worksheet harness UNAFFECTED (47/47, 0 divergers): the Summary path lodges
neither code 5/6 nor a measured volume. API gauge: within-0.5 64.4% -> 65.1%
(mean|err| 1.085 -> 1.075) — the 20 code-6 certs now size their cylinder from
the measured volume. 4 AAA tests (code 6 measured; code 5 solid-fuel/default/
off-peak-dual-immersion). pyright net-zero.
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
The main-wall `u_wall(...)` call dropped the `dry_lined` kwarg, so the RdSAP 10
§5.7/§5.8 (PDF p.40-41) Table 14 dry-lining adjustment — U_adj = 1/(1/U₀ +
0.17) for a dry-lined (incl. lath-and-plaster) uninsulated wall — was never
applied to any main wall, even when the cert lodged `wall_dry_lined=Y`. The
ALTERNATIVE-wall path already passes `dry_lined` (line 1367); this one-sided
omission billed every dry-lined main wall at the un-adjusted (too-high) U →
wall heat loss too high → SAP under-rated.
Per-cert: a solid-brick (construction 3) band-A 230 mm main wall computes
U₀=1.70; dry-lined it is 1/(1/1.70+0.17)=1.32 — we were 22% too high. Across
the API gov-EPC sample the dry-lined `wall_construction=3` (solid brick)
sub-cohort sat at 10% within-0.5 / signed -1.33.
Fix: pass `dry_lined=bool(part.wall_dry_lined)` to the main-wall `u_wall`
call, mirroring the alt-wall path. `part.wall_dry_lined` is already plumbed
(Optional[bool], None → False). The three dry-lining branches in `u_wall`
(stone §5.6, solid-brick-by-thickness §5.7, generic uninsulated bucket §5.8)
are all spec-correct and already worksheet-validated (the bucket-0 cavity
case against cert 7700 age-C → 1.20).
Worksheet harness UNAFFECTED (47/47, 0 divergers): the Elmhurst/Summary
extractor only captures dry-lining for ALTERNATIVE walls (Summary §7), never
the main wall, so `part.wall_dry_lined` stays None on that path — this is a
pure API-path improvement. API gauge: within-0.5 60.1% -> 64.4% (mean|err|
1.163 -> 1.085, signed -0.097 -> +0.049). Both affected buckets improved
with no overshoot: solid brick (wc=3) 50% -> 57% within-0.5; cavity (wc=4,
dry-lined via the §5.8 bucket-0 path) 68% -> 72%.
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
A flat accessed via an unheated corridor/stairwell assumes a draught lobby
is present, so SAP 10.2 §2 line (13) = 0.0 rather than the 0.05 no-lobby
infiltration penalty. Per RdSAP 10 Specification (10-06-2025, p.30, "Draught
lobby"): "add infiltration 0.05 if draught lobby is not present, or use 0.0
if present. ... Flat or maisonette: Assume draught lobby if entrance door is
facing corridor (heated or unheated) or stairwell."
Signal: a SHELTERED alternative wall (the RdSAP §5.9 wall-to-unheated-corridor
surface) is the evidence that the flat's entrance faces a corridor — the same
evidence the corridor door (Table 26 U=1.4) rides on. New helper
`_has_sheltered_corridor_wall` factors that check out of `_corridor_door_count`
and gates `_has_draught_lobby`. Houses and exposed-gable flats (no sheltered
alt wall) keep the lodged value / "assume no lobby if cannot be determined"
default, so the §2 cascade is unchanged for every non-corridor dwelling.
The cascade previously added the 0.05 penalty unconditionally, over-counting
(16)/(18)/(21) by 0.05 ACH. On simulated case 34 (cert 001431 storage flat)
this lifted effective air change (25)m from the worksheet's monthly 0.572-0.638
to 0.574-0.668, over-counting space-heating demand (98) by +46.3 kWh/yr
(+0.41%) -> SAP -0.18. Closing it lands (25)m exactly on the worksheet (avg
0.6024) and (98) at 11356.3 vs ws 11357.2:
case 34 SAP 35.1325 -> 35.3130 vs ws 35.3094 (Δ -0.1769 -> +0.0036)
Guard-rails held (both improved): worksheet harness 47/47, 0 divergers (the
other corridor flat, cert 2474, -0.32 -> -0.02); API gauge 60.0% -> 60.1%
within 0.5, mean|err| 1.167 -> 1.163.
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
A door opening to an unheated corridor/stairwell takes U=1.4 W/m²K (RdSAP 10
Table 26, p.51 — any age band) instead of the 3.0 external-door default, and
its area deducts from the SHELTERED wall, not the main wall (RdSAP §3.7,
p.18: "the door of a flat/maisonette to an unheated stairwell or corridor
... is deducted from the sheltered wall area"). The cascade previously
billed every door at the external U on the main wall.
Signal: a SHELTERED alternative wall (`is_sheltered`, the RdSAP §5.9
wall-to-unheated-corridor surface, already modelled) is the evidence that
the dwelling is accessed via an unheated corridor, so one lodged door opens
to it. `_corridor_door_count` returns 1 when a sheltered alt wall is present
and >=1 door is lodged, else 0 — so the door channel is unchanged for every
non-corridor dwelling (houses, exposed-gable flats). `heat_transmission_
from_cert` gains a `corridor_door_count` param (default 0): it splits the
door area into external (main wall, age-default U) + corridor (sheltered
alt wall, U=1.4), threading the corridor door's area into that wall's
opening deduction and billing it at 1.4.
Validated on TWO faithful worksheets: simulated case 34 (cert 001431
storage flat — doors 8.14 exact, fabric 207.47 ≈ ws 207.48) and the
long-standing worksheet-harness diverger cert 2474 (−0.87 → −0.32, the
"space-demand thread" was the dropped corridor door). The worksheet harness
is now 47/47 with ZERO divergers.
API SAP gauge: 57.6% → 60.0% within 0.5; mean|err| 1.185 → 1.167; signed
−0.165 → −0.115 — ~22 sheltered-corridor flats were a systematic gap.
Regression gate green (3 pre-existing fails unrelated); pyright net-zero.
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
Don't offer a like-for-like gas boiler swap to a dwelling whose existing gas
boiler is already at least as efficient as the new condensing boiler (SAP 10.2
Table 4b codes 102/104 = 84% winter) — it gains nothing, and the dwelling gets
the tune-up (cylinder + controls) instead. `_already_condensing` compares the
existing code's Table 4b winter efficiency to 84%; a non-Table-4b code (solid
fuel) has no comparable efficiency and is never treated as already-condensing.
The gate is GAS-ONLY: a non-gas boiler → gas is a fuel switch whose value (cost
/ carbon) is not captured by winter efficiency, so oil/LPG/coal → gas is never
suppressed on efficiency grounds (only gated on the mains-gas connection).
This correctly demotes the gas-with-cylinder example (cert lodges code 114
"Regular, condensing", 84% winter) to a tune-up case — confirming that 114→102
is ~0 boiler-efficiency gain in both our calc and Elmhurst (both Table 4b 84%);
Elmhurst's uplift there came from the cylinder + flue, not the boiler. The
boiler-with-cylinder overlay stays validated by the lpg pin (code 115, non-
condensing + cylinder) and by recasting the 114 fixtures' code to a pre-1998
non-condensing boiler (110) in the boiler tests — the overlay overwrites the
code to 102 regardless, so only eligibility changes, not the delta-0 result.
New tests: an already-condensing gas boiler yields no boiler upgrade (but a
tune-up); an oil condensing boiler is not gated (the fuel switch survives).
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
SAP 10.2 Table 12a (PDF p.191) is titled "High-rate fractions for systems
using 7-hour and 10-hour tariffs"; its "Immersion water heater" row lists
the tariff as "7-hour or 10-hour" only, routing to Table 13. An 18-hour or
24-hour tariff is OUTSIDE the table's scope — it provides at least 18
hours/day at the low rate, more than enough to heat any immersion cylinder
off-peak, so the high-rate fraction is 0 (all DHW billed at the low rate).
`electric_dhw_high_rate_fraction` previously mapped 18-/24-hour to the
10-hour equations (returning ~0.10 for a 110 L dual immersion) on an
over-literal reading of Table 13 Note 1 ("at least 10 hours"). The Elmhurst
dr87 worksheet for solid fuel 5 (cert 001431: 18-hour meter, 110 L dual
immersion, WHC 903) refutes that: HW (245) high-rate = 0.0 kWh, (246)
low-rate = 100%. Table 12a's title bounds the table to the two named
tariffs; 18-/24-hour fall outside it.
Resolves the Table-13 blocker on the immersion-extractor fix: once the
Summary extractor captures the dual immersion, the 18-hour solid-fuel
corpus certs stay at high_frac=0 (matching their worksheets) instead of
regressing to the 10-hour-column 0.10.
API SAP eval unchanged: 57.6% within 0.5, mean|err| 1.185, signed -0.165
(the cached sample has no 18-hour WHC-903 certs; one 24-hour cert shifts
sub-threshold). Regression gate green (3 pre-existing fails unrelated).
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
SAP 10.2 §9.4.9 (PDF p.32) verbatim: "A cylinder thermostat should be
assumed to be present when the domestic hot water is obtained from a heat
network, an immersion heater, a thermal store, a combi boiler or a CPSU."
RdSAP 10 Table 29 (p.56) points the no-access default at this rule.
The storage-loss Table 2b temperature factor previously read only the
lodged `cylinder_thermostat` ("Y") — so an unlodged thermostat always took
the ×1.3 absent-penalty, over-stating storage loss by 30%. New
`_cylinder_thermostat_present` assumes it present when DHW is from a heat
network, WHC 903 (immersion), or a direct-acting electric boiler (SAP code
191 — electric-resistance, immersion-equivalent).
Found via the worksheet-folder harness: cert 2474-3059-4202-4496-3200
(Summary path: WHC 901, main SAP 191, electric, no lodged cylinder stat)
diverged −1.86 from its dr87 worksheet. The worksheet lodges (53)
temperature factor 0.6000 (present) and "add cylinder thermostat (SAP
increase too small)" — already assumed present. Fix lands HW output (64)
2701.99 → 2323.88, EXACT to the worksheet; 2474 −1.86 → −0.87 (residual is
a separate space-demand fabric thread). No other worksheet in the 47-cert
harness moved.
API eval within-0.5 56.9% → 57.6%; mean|err| 1.197 → 1.185; signed
−0.202 → −0.165. Regression green (only pre-existing fails); goldens +
heating corpus unaffected.
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
SAP 10.2 Table 3 (PDF p.160) verbatim: "For heat networks apply the
formula above with p = 1.0 and h = 3 for all months." The primary
circulation hours for a heat-network main are fixed at h=3 winter and
summer, independent of the cylinder-thermostat / separate-timing
lodgement that selects the h=5/h=11 rows for boiler systems.
`primary_loss_monthly_kwh` / `primary_circuit_hours_per_day_table_3` gain
a `heat_network` flag (→ (3, 3)); `_primary_loss_override` passes
`_is_heat_network_main(main)`. p=1.0 was already pinned via
`_HEAT_NETWORK_PIPEWORK_INSULATION_FRACTION`; only the hours were wrong.
Before, cert 8536 routed through the h=5/3 row because its community
biomass DHW fuel (31) collides with electricity code 31, so
`_separately_timed_dhw` returned False. The Table 3 heat-network rule
overrides that path: 8536 primary loss (59) 335.81 → 273.90, EXACT to
the faithful case-32 worksheet (storage (56) 376.58 also matches 376.94).
API eval within-0.5 57.0% → 56.9% (one offsetting-error cert crosses
out; signed err −0.205 → −0.202). Applied spec-uniformly per the
determinism principle — the heat-network primary hours are unambiguous.
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
A heat-network main with DHW from the network and no lodged cylinder was
billed the Table 3a keep-hot 600 kWh/yr combi loss (cat 6 sat in
`_TABLE_3A_COMBI_LOSS_MAIN_HEATING_CATEGORIES`). A heat network is not a
combi boiler — SAP 10.2 §4 line 7702 says combi loss is 0 for non-combi
systems.
SAP 10.2 p.24 "Heat networks" (c): when neither a PCDB Heat Interface
Unit nor a lodged cylinder applies, "a measured loss of 1.72 kWh/day
should be used, corrected using Table 2b. This is equivalent to a
cylinder of 110 litres and a factory insulation thickness of 50 mm".
RdSAP 10 Table 29 (p.56): a cylinder thermostat is assumed present when
DHW is from a heat network (Table 2b temperature factor 0.60).
New `_apply_heat_network_hiu_default_store` rebinds the 110 L / 50 mm-
factory store (thermostat present) onto a heat-network DHW cert with no
cylinder and no PCDB index, mirroring `_apply_rdsap_no_water_heating_
system_default`. The injected store routes storage loss (56) ≈ 376.7
kWh/yr (= 1.72 × 0.60 × 365) + primary loss (59) through the existing
machinery and zeroes the combi (61) loss via the has_hot_water_cylinder
gate. Verified against the user's faithful case-32 worksheet: storage
(56) 376.58 vs worksheet 376.94.
Cert 8536 storage 0→376.6, combi 600→0. API eval within-0.5 56.8% →
57.0%; signed err −0.218 → −0.205. Reworked
`test_heat_network_main_with_hw_from_main_dlf_scales_hot_water_kwh` to
assert the DLF scaling directly (fuel ÷ §4 output = 1.41) since the old
two-cert baseline premise (both combi-600) no longer holds.
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
Replace the flat placeholder scalars (boiler £3000; tune-up £500/£900) with a
per-dwelling composite cost, mirroring the ASHP architecture (ADR-0025): a
`HeatingRates` table (data, `heating_rates.json`), typed `BoilerCostInputs` /
`TuneUpCostInputs`, pure `Products.boiler_bundle_cost` / `tune_up_cost`, and
modelling-layer interpreters that read the dwelling into those inputs.
The cost mirrors the Simulation Overlay component-for-component, sharing the
controls + cylinder pricing across both options:
- tune-up (standard) = standard controls + cylinder fixes
- tune-up (zone) = zone controls + cylinder fixes
- boiler upgrade = £3200 all-in + standard controls (only when the upgrade
fired a controls change) + cylinder fixes
Standard controls are priced INCREMENTALLY — only the parts missing to reach
SAP 2106 (programmer £120 / room thermostat £150 / TRV £35×radiators), read
from a Table 4e Group-1 feature map so a dwelling that already has a room
thermostat + TRVs is only charged the programmer. Zone controls are a full
smart kit (hub £205 + smart TRV £50×radiators) — the smart TRV is itself the
room sensor, so there is no separate per-room sensor line. Cylinder fixes:
jacket £50 (when under-insulated) + thermostat £150 (when absent). The boiler
is a like-for-like wet swap (no radiators/flue/pipework — eligibility already
requires an existing wet boiler), so those dead-code extras are not modelled.
Figures are research-validated 2025/26 UK installed costs (legacy Costs.py
lineage); fully-loaded totals with one contingency on top (Model B, not the
legacy VAT/preliminaries engine). Contingency: boiler 0.26; tune-ups 0.10
(was a 0.15 placeholder). ADR-0027 records the design; CONTEXT.md's Heating
Eligibility entry updated to cover the partial boiler/tune-up family + composed
cost. Products cost pins (delta<=1e-9) + interpreter tests + generator
composite-cost assertions.
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
The GOV.UK API lodges a junk empty leading building part (all fields
None) ahead of the real Main Dwelling on some certs. Four sites in
cert_to_inputs.py read `sap_building_parts[0].construction_age_band` →
got None → silently dropped the dwelling age band. New `_dwelling_age_band`
helper takes the first part that lodges a band (a no-op for normal certs
where [0] is the Main part).
Closes two age-band-keyed defects on the 5 affected certs:
- SAP 10.2 Table 12c (p.193): the heat-network Distribution Loss Factor
defaulted to the K-or-newer 1.50 instead of the dwelling's true band
(cert 8536-0929-6500-0815-7206 is age A → 1.20), inflating distribution
loss by 30%.
- RdSAP 10 §4.1 Table 5 (p.28): the empty band ("") fell through the
age-band branches to the H–M habitable-rooms branch, defaulting in
phantom extract fans. The true band A correctly yields 0 fans
(bands A–E → 0).
Cert 8536: 31.76 → 41.12 vs lodged 39 (was −7.24, now +2.12). API eval
mean|err| 1.197 → 1.192, signed −0.229 → −0.218; headline within-0.5
holds at 56.8% (8536 lands at +2.1, a documented overshoot vs the
faithful case-31 worksheet — separate slice).
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
Add the system tune-up to the heating Recommendation: keep the existing wet
boiler but install better heating controls and fix the cylinder. Two competing
Options (the Optimiser picks <=1 across the whole heating rec) per the user's
two best control end-states:
- system_tune_up — standard controls (programmer + room thermostat +
TRVs, SAP 10.2 Table 4e code 2106)
- system_tune_up_zoned — time-and-temperature zone control (code 2110, type 3):
more SAP uplift for more cost
Both keep the boiler (no fuel / SAP code / flue change), set the control
ABSOLUTELY to their end-state, and apply the conditional cylinder fixes (an
80 mm jacket when under-insulated, a thermostat when absent — only when a
cylinder exists). Each control option is offered only when it genuinely improves
the existing control — standard is skipped when the control is already 2106 /
2110 / 2112, zone when already 2110 / 2112 — so neither is ever a downgrade or a
no-op.
Validated against the Elmhurst "system tune up" re-lodgements (cert 001431):
nine befores spanning controls 2101-2113 all converge to the two common afters,
proving the control overlay is absolute. The cascade pin is parametrised over
two starting controls (2101 "no control" + 2113 "room thermostat and TRVs") x
both afters, delta 0 (SAP/CO2/PE).
Wires the two MeasureTypes through contingencies (0.15), the offline catalogue
(500 / 900), the catalogue-coverage list, the report triggers, and the ARA
first-run seed.
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
Add the `gas_boiler_upgrade` branch to `report._triggers_for`, mirroring the
generator's eligibility guard so a cohort report explains why the boiler upgrade
fired: the wet-boiler SAP code, the mains-gas connection that makes the gas
end-state installable, and the cylinder presence that shapes the bundle (combi
vs regular + cylinder fixes).
No golden API cert selects the boiler upgrade (it competes with — and on houses
loses to — the ASHP bundle within the one heating Recommendation), so the branch
is covered by a direct `_triggers_for` unit test, following the repo pattern for
testing internal helpers (cert_to_inputs).
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
Pin the coal-boiler-with-cylinder upgrade and add the `boiler_flue_type`
end-state field. A solid-fuel (coal) boiler (fuel 11, SAP code 153) on a
mains-gas street converts to a gas condensing boiler (fuel 11->26, code 102) —
the non-gas->gas path for a solid-fuel system, eligible because code 153 is in
the wet-boiler solid-fuel range 151-161 and mains gas is present.
New `boiler_flue_type` HeatingOverlay field, routed to main_heating_details[0]
and set to 2 (room-sealed/balanced) on both boiler shapes: every relodged after
lodges flue type 2, but coal's before lodged none. The field is SAP-inert (the
cascade score is unchanged by it), so it is written purely for end-state
fidelity — the overlay now represents the installed condensing boiler's flue.
Validated via the overlay-equality unit tests.
The coal after predates the user-locked "always add a cylinder thermostat when
absent" rule, so it stale-lodged thermostat 'N'; the pin corrects it to the
rule's end-state 'Y' in-test (the gas with-cylinder after got the same
correction by re-lodging). The cylinder is already 80 mm insulated, so the
jacket is skipped and only the thermostat is added; controls (2106) are
unchanged. Cascade-pinned delta 0 (SAP/CO2/PE).
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
Two more boiler-upgrade cascade pins, validating the existing generator across
fuels and cylinder states (no source change):
- oil combi: an oil boiler (fuel 28, code 130) on a mains-gas street converts to
a gas condensing combi (fuel 28->26, code 104). Proves the non-gas -> gas
conversion gated on a mains-gas connection (ADR-0024 revised).
- already-insulated cylinder: a gas boiler heating a pre-jacketed cylinder
(type 2 / 80 mm, no thermostat) gets a new boiler + a thermostat, with the
jacket NOT re-applied. Proves the cylinder path's skip-jacket branch against a
real cert. (Sourced from an LPG re-lodgement whose fuel the Summary mapper
reads as mains gas 26 — a separate LPG fuel-mapping gap, noted in the test.)
Both pin delta 0 (SAP/CO2/PE) against the relodged after.
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
Extend the gas-boiler-upgrade Option to combi (no-cylinder) dwellings and add
the controls upgrade shared by both boiler shapes. A dwelling has a cylinder or
it does not, so the one `gas_boiler_upgrade` Option is shaped per dwelling:
- no cylinder -> a gas condensing combi (Table 4b code 104), no cylinder fields
touched;
- a cylinder -> a regular boiler (code 102) heating it, with the conditional
cylinder jacket/thermostat (slice 1).
Controls: bring an inadequate boiler control up to full programmer + room
thermostat + TRVs (SAP 10.2 Table 4e Group 1 code 2106). "Inadequate" = the
Group-1 codes with NO room thermostat (2101, 2102, 2107, 2108, 2109, 2111) —
these lack boiler interlock (Table 4c(2) / footnote c) p.171), so adding a room
thermostat genuinely improves SAP. Room-thermostatted (2103/2104/2105/2106/2113)
or better zone controls (2110/2112) are left unchanged — never downgraded, so
no phantom uplift. The with-cylinder cert (control 2106) is therefore untouched
and its pin still holds at delta 0.
Validated by the combi before/after re-lodgement (cert 001431, gas boiler
upgrade - no cylinder): control 2111 "TRVs and bypass" -> 2106, fan flue
False->True, SAP code 112 -> 104. Cascade-pinned delta 0 (SAP/CO2/PE). Removed
the slice-1 placeholder test asserting no boiler Option fires without a cylinder
(the combi Option now correctly fires there).
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
Add the first boiler-upgrade option to the single "Heating & Hot Water"
Recommendation (ADR-0024 expansion): a dwelling whose existing wet boiler heats
a hot-water cylinder is offered a new gas condensing boiler, with the cylinder
jacketed when under-insulated and given a thermostat when absent. One competing
Option (the Optimiser picks <=1), folded into one composite Plan line.
The end-state is read from the Elmhurst before/after re-lodgements (cert 001431,
gas boiler upgrade - with cylinder), which REVISE ADR-0024:
- Target is always a gas condensing boiler, not fuel-preserving: every after
lodges fuel 26. Gas->gas always; a non-gas wet boiler ->gas only with a
mains-gas connection; electric boilers are left alone (electrification is the
upgrade path). Eligibility = wet-boiler SAP code (Table 4a/4b 101-141 /
151-161 / 191-196) + not an electric boiler + mains gas present.
- End-state is a Table 4b SAP code, not a PCDB index: code 102 (regular boiler
+ cylinder). The calculator derives the condensing seasonal efficiency from
the code, so no efficiency input exists or is needed.
- A modern condensing boiler has a fanned flue: the after flips
`fan_flue_present` False->True on every cert (SAP 10.2 Table 4f flue-fan +
the Table 4b condensing-efficiency basis). Added as a new HeatingOverlay
field, routed to main_heating_details[0].
- Cylinder thermostat is always added when absent (user-locked); the jacket is
the 80 mm `cylinder_insulation_type=2` end-state, applied only when the
cylinder is below 80 mm (never downgrading a better one). Both are conditional
per-dwelling components, not a frozen overlay.
Cascade-pinned delta-0 (SAP/CO2/PE) against the relodged after via
`_assert_overlay_reproduces_after`. NB the absolute SAP on this dwelling is
subject to a separate Summary-path mapper roof-fidelity gap (we read the roof
better-insulated than Elmhurst, scoring ~75 vs the printed 56); the gap is
identical on before+after (the boiler measure never touches the roof) so it
cancels and the pin still proves the exact heating field-delta. Tracked on the
calculator branch.
Wires the new `gas_boiler_upgrade` MeasureType through contingencies (0.26),
the offline sample catalogue, the catalogue-coverage list, and the ARA
first-run integration seed (the option fires on any mains-gas boiler+cylinder
dwelling).
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
The heat-network HW distribution-loss override fired only when the MAIN was
a heat network AND whc inherited from main ({901,902,914}). Water-heating-only
heat networks (SAP 10.2 Table 4a HW codes 950 boilers / 951 CHP / 952 heat
pump) were missed entirely: their Table 4a plant efficiency applied with NO
distribution loss, so the HW fuel was under-counted by the Table 12c DLF
(1.33-1.48x) → under-cost → over-rate.
RdSAP 10 §10 (spec p.36): a water-heating-only heat network is calculated 'for
plant efficiency, distribution loss and pumping energy - see Table 12c'. Added
a whc-gated branch (independent of the main) applying water_eff = plant_eff /
DLF — the per-kWh-generated cost model (q_generated = q_useful x DLF). Fires on
the WHC alone so a HW-only heat network with a non-network main (cert 9093, whc
950 + warm-air main 502) is covered.
The 3 corpus whc=950 certs all improve in |err|: 2153 +2.62->-0.48 (now within
0.5), 7220 +1.27->-0.97, 9093 +6.04->+3.60 (residual is its warm-air main, a
separate cause). within-0.5 56.66->56.79%, within-1.0 71.9->72.2%, mean|err|
down; only those 3 certs change. New AAA test pins the DLF scaling fires on the
WHC independent of the main. Goldens + gate green, pyright net-zero.
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
Tier-1 finding of the silent-fallback audit. The fuel-type helpers fed the
SAP 10.2 Table 12/32 cost/CO2/PE lookups via a silent
`API_FUEL_TO_TABLE_12.get(fuel, fuel)` passthrough at 5 sites
(_heat_network_factor_fuel_code, HW CO2/PE, _secondary_fuel_code, PV). A fuel
code in NEITHER the API enum map NOR the Table-12 numbering passed straight
through to the mains-gas default baked into unit_price_p_per_kwh /
co2_factor_kg_per_kwh / primary_energy_factor (table_12.py:233/274/287,
table_32.py:190) — silently mis-pricing a novel/colliding fuel as grid gas.
This is the class that mis-priced cert 8536's community biomass as
electricity (-17 SAP) before a7761ea8.
New _table_12_factor_fuel_code mirrors .get(fuel, fuel) EXACTLY for every
recognised input (union of the CO2/PE/price/monthly table keys +
API_FUEL_TO_TABLE_12 values) and raises UnmappedSapCode only when the
resolved code is recognised by no table — surfacing the gap loudly per the
strict-raise principle (reference_unmapped_sap_code). Verified behaviour-
preserving: 0/909 corpus certs hit the new raise; eval unchanged at 54.9%
within-0.5 / 909 computed / 0 raises.
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>