mirror of
https://github.com/Hestia-Homes/Model.git
synced 2026-07-12 13:29:04 +00:00
The ASHP bundle is a fixed whole-system end-state (confirmed: always the same
contractor cylinder), so the hot-water arrangement is fixed too. The overlay now
sets water_heating_code=901 ("from main system") absolutely, so a combi (909/611)
or electric (903/908) before is reset to HW-from-the-heat-pump — previously the
overlay relied on the before already lodging 901 (true for boiler-1, not in
general). No-op for the boiler-1 pin (stays 1e-4). Cascade pins for combi /
electric-with-cylinder befores await example certs. ADR-0024.
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
|
||
|---|---|---|
| .. | ||
| applications | ||
| datatypes | ||
| domain | ||
| harness | ||
| infrastructure | ||
| orchestration | ||
| repositories | ||
| utilities | ||
| __init__.py | ||
| conftest.py | ||
| test_lambda_packaging.py | ||