Model/docs
Khalim Conn-Kowlessar bb827803ac docs: SPEC_COVERAGE §8 row flip to Full + slice progress table
§8 Space heating requirement: Partial → Full. Six Elmhurst fixtures
conform end-to-end on (95)..(99) at 5e-2..1e-1 kWh per month; tolerances
reflect 4-d.p. fixture pin propagation, not physics drift. Spec
inclusion rule (Jun..Sep summer clamp) now applied; 000490 SAP-score
gap to PDF=57 documented (currently 60 — closes incrementally as §3 /
§4 / §5 upstream precision tightens).

Also renumbers the §9 row to "Energy requirements per heating system"
(its SAP10.2 worksheet title) — the previous "§9 Space heating" entry
conflated §8 and §9.

Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
2026-05-20 22:55:17 +00:00
..
adr docs: ADR-0010 retargets calculator to SAP 10.2; rewrite handover 2026-05-19 09:54:24 +00:00
sap-spec docs: SPEC_COVERAGE §8 row flip to Full + slice progress table 2026-05-20 22:55:17 +00:00