Model/docs/sap-spec
Khalim Conn-Kowlessar bb827803ac docs: SPEC_COVERAGE §8 row flip to Full + slice progress table
§8 Space heating requirement: Partial → Full. Six Elmhurst fixtures
conform end-to-end on (95)..(99) at 5e-2..1e-1 kWh per month; tolerances
reflect 4-d.p. fixture pin propagation, not physics drift. Spec
inclusion rule (Jun..Sep summer clamp) now applied; 000490 SAP-score
gap to PDF=57 documented (currently 60 — closes incrementally as §3 /
§4 / §5 upstream precision tightens).

Also renumbers the §9 row to "Energy requirements per heating system"
(its SAP10.2 worksheet title) — the previous "§9 Space heating" entry
conflated §8 and §9.

Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
2026-05-20 22:55:17 +00:00
..
CALCULATOR_DESIGN_SKETCH.md ADR-0009: pivot to deterministic SAP 10.3 calculator (Accepted) 2026-05-17 21:27:21 +00:00
HANDOVER_SECTION_6.md docs: handover for §6 Solar gains agent 2026-05-20 19:29:30 +00:00
PARITY_FINDINGS.md Record post-P5 parity-probe baseline (2026-05-19) 2026-05-19 16:19:01 +00:00
rdsap-10-specification-2025-06-10.pdf ADR-0009: pivot to deterministic SAP 10.3 calculator (Accepted) 2026-05-17 21:27:21 +00:00
sap-10-2-full-specification-2025-03-14.pdf slice S-B9: SAP 10.2/10.3 Table 12 spec-correct prices + Table 12a fix 2026-05-18 15:14:11 +00:00
sap-10-3-full-specification-2026-01-13.pdf ADR-0009: pivot to deterministic SAP 10.3 calculator (Accepted) 2026-05-17 21:27:21 +00:00
SPEC_COVERAGE.md docs: SPEC_COVERAGE §8 row flip to Full + slice progress table 2026-05-20 22:55:17 +00:00