Model/tests/domain/modelling/fixtures
Khalim Conn-Kowlessar d9c7638b3c test(modelling): ASHP from a system gas boiler with an existing cylinder
Pins the cylinder-OVERWRITE path the earlier ASHP pins did not exercise:
boiler-1/boiler-2 added a cylinder where none existed, whereas boiler-3's
before is a mains-gas regular boiler (SAP code 101) that already heats its
own cylinder (size 2 / insulation type 2 / 80 mm). The fixed _ASHP_OVERLAY
overwrites it to the heat-pump cylinder (size 4 / insulation type 1 / 50 mm)
and switches the dwelling off mains gas (fuel 26->30, code 101->index 101413
+ category 4). The existing overlay reproduces the re-lodged after at delta 0
on SAP / CO2 / primary energy -- no overlay change needed; immersion_heating_
type is None in both, so that field (the electric-with-cylinder case) is
untouched here.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-06 18:20:58 +00:00
..
ashp_001431_after.pdf test(modelling): ASHP before/after cascade pin (001431) at 1e-4 2026-06-06 17:01:40 +00:00
ashp_from_gas_boiler_001431_before.pdf test(modelling): ASHP before/after cascade pin (001431) at 1e-4 2026-06-06 17:01:40 +00:00
ashp_from_gas_boiler_instant_hw_001431_after.pdf test(modelling): ASHP pin from a gas boiler with instantaneous HW + fuel tripwire 2026-06-06 17:40:25 +00:00
ashp_from_gas_boiler_instant_hw_001431_before.pdf test(modelling): ASHP pin from a gas boiler with instantaneous HW + fuel tripwire 2026-06-06 17:40:25 +00:00
ashp_from_system_boiler_with_cylinder_001431_after.pdf test(modelling): ASHP from a system gas boiler with an existing cylinder 2026-06-06 18:20:58 +00:00
ashp_from_system_boiler_with_cylinder_001431_before.pdf test(modelling): ASHP from a system gas boiler with an existing cylinder 2026-06-06 18:20:58 +00:00
cavity_wall_001431_after.pdf test(modelling): Elmhurst before/after cascade pin for cavity wall (#1154) 2026-06-03 09:36:53 +00:00
cavity_wall_001431_before.pdf test(modelling): Elmhurst before/after cascade pin for cavity wall (#1154) 2026-06-03 09:36:53 +00:00
double_glazing_001431_after.pdf test(fixtures): add glazing before/after certs (001431) for the pin slices 2026-06-05 07:54:43 +00:00
double_glazing_001431_before.pdf test(fixtures): add glazing before/after certs (001431) for the pin slices 2026-06-05 07:54:43 +00:00
flat_roof_001431_after.pdf feat(modelling): roof dispatcher insulates a flat roof 2026-06-04 21:16:00 +00:00
flat_roof_001431_before.pdf feat(modelling): roof dispatcher insulates a flat roof 2026-06-04 21:16:00 +00:00
hhr_storage_001431_after.pdf test(modelling): HHRSH before/after cascade pins (001431) at 1e-4 2026-06-05 19:09:23 +00:00
hhr_storage_from_electric_storage_001431_before.pdf test(modelling): HHRSH before/after cascade pins (001431) at 1e-4 2026-06-05 19:09:23 +00:00
hhr_storage_from_no_system_001431_before.pdf test(modelling): HHRSH before/after cascade pins (001431) at 1e-4 2026-06-05 19:09:23 +00:00
loft_001431_after.pdf feat(modelling): loft overlay 270→300 mm + Elmhurst cascade pin (#1158) 2026-06-03 09:39:21 +00:00
loft_001431_before.pdf feat(modelling): loft overlay 270→300 mm + Elmhurst cascade pin (#1158) 2026-06-03 09:39:21 +00:00
loft_thatched_001431_after.pdf feat(modelling): fold loft into the roof dispatcher; thatch routes to loft 2026-06-04 21:12:01 +00:00
loft_thatched_001431_before.pdf feat(modelling): fold loft into the roof dispatcher; thatch routes to loft 2026-06-04 21:12:01 +00:00
low_energy_lighting_some_leds_001431_after.pdf test(modelling): lighting before/after cascade pins (001431) at 1e-4 2026-06-05 12:27:36 +00:00
low_energy_lighting_some_leds_001431_before.pdf test(modelling): lighting before/after cascade pins (001431) at 1e-4 2026-06-05 12:27:36 +00:00
low_energy_lighting_zero_leds_001431_after.pdf test(modelling): lighting before/after cascade pins (001431) at 1e-4 2026-06-05 12:27:36 +00:00
low_energy_lighting_zero_leds_001431_before.pdf test(modelling): lighting before/after cascade pins (001431) at 1e-4 2026-06-05 12:27:36 +00:00
secondary_glazing_001431_after.pdf test(fixtures): add glazing before/after certs (001431) for the pin slices 2026-06-05 07:54:43 +00:00
secondary_glazing_001431_before.pdf test(fixtures): add glazing before/after certs (001431) for the pin slices 2026-06-05 07:54:43 +00:00
sloping_ceiling_001431_after.pdf feat(modelling): recommend_roof_insulation insulates a sloping ceiling 2026-06-04 21:02:06 +00:00
sloping_ceiling_001431_before.pdf feat(modelling): recommend_roof_insulation insulates a sloping ceiling 2026-06-04 21:02:06 +00:00
solid_brick_ewi_001431_after.pdf feat(modelling): overlay models solid-wall insulation (IWI/EWI), pinned 2026-06-04 15:11:26 +00:00
solid_brick_ewi_001431_before.pdf feat(modelling): overlay models solid-wall insulation (IWI/EWI), pinned 2026-06-04 15:11:26 +00:00
solid_brick_iwi_001431_after.pdf feat(modelling): overlay models solid-wall insulation (IWI/EWI), pinned 2026-06-04 15:11:26 +00:00
solid_brick_iwi_001431_before.pdf feat(modelling): overlay models solid-wall insulation (IWI/EWI), pinned 2026-06-04 15:11:26 +00:00
solid_floor_001431_after.pdf feat(modelling): floor insulation-type overlay field + cascade pins (#1159) 2026-06-03 09:41:54 +00:00
solid_floor_001431_before.pdf feat(modelling): floor insulation-type overlay field + cascade pins (#1159) 2026-06-03 09:41:54 +00:00
suspended_floor_001431_after.pdf feat(modelling): floor insulation-type overlay field + cascade pins (#1159) 2026-06-03 09:41:54 +00:00
suspended_floor_001431_before.pdf feat(modelling): floor insulation-type overlay field + cascade pins (#1159) 2026-06-03 09:41:54 +00:00
system_built_ewi_001431_after.pdf feat(modelling): system-built walls take EWI+IWI (blocked on basement-code fix) 2026-06-04 18:26:08 +00:00
system_built_ewi_001431_before.pdf feat(modelling): system-built walls take EWI+IWI (blocked on basement-code fix) 2026-06-04 18:26:08 +00:00
system_built_iwi_001431_after.pdf feat(modelling): system-built walls take EWI+IWI (blocked on basement-code fix) 2026-06-04 18:26:08 +00:00
system_built_iwi_001431_before.pdf feat(modelling): system-built walls take EWI+IWI (blocked on basement-code fix) 2026-06-04 18:26:08 +00:00
timber_frame_iwi_001431_after.pdf feat(modelling): solid-wall generator offers IWI-only for timber frame 2026-06-04 15:33:46 +00:00
timber_frame_iwi_001431_before.pdf feat(modelling): solid-wall generator offers IWI-only for timber frame 2026-06-04 15:33:46 +00:00