Commit graph

24 commits

Author SHA1 Message Date
Khalim Conn-Kowlessar
07f534ee11 feat(modelling): system tune-up options (standard + zone controls)
Add the system tune-up to the heating Recommendation: keep the existing wet
boiler but install better heating controls and fix the cylinder. Two competing
Options (the Optimiser picks <=1 across the whole heating rec) per the user's
two best control end-states:

- system_tune_up        — standard controls (programmer + room thermostat +
  TRVs, SAP 10.2 Table 4e code 2106)
- system_tune_up_zoned  — time-and-temperature zone control (code 2110, type 3):
  more SAP uplift for more cost

Both keep the boiler (no fuel / SAP code / flue change), set the control
ABSOLUTELY to their end-state, and apply the conditional cylinder fixes (an
80 mm jacket when under-insulated, a thermostat when absent — only when a
cylinder exists). Each control option is offered only when it genuinely improves
the existing control — standard is skipped when the control is already 2106 /
2110 / 2112, zone when already 2110 / 2112 — so neither is ever a downgrade or a
no-op.

Validated against the Elmhurst "system tune up" re-lodgements (cert 001431):
nine befores spanning controls 2101-2113 all converge to the two common afters,
proving the control overlay is absolute. The cascade pin is parametrised over
two starting controls (2101 "no control" + 2113 "room thermostat and TRVs") x
both afters, delta 0 (SAP/CO2/PE).

Wires the two MeasureTypes through contingencies (0.15), the offline catalogue
(500 / 900), the catalogue-coverage list, the report triggers, and the ARA
first-run seed.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-10 10:20:46 +00:00
Khalim Conn-Kowlessar
2413bc87da feat(modelling): solid-fuel(coal)->gas boiler upgrade + boiler_flue_type end-state
Pin the coal-boiler-with-cylinder upgrade and add the `boiler_flue_type`
end-state field. A solid-fuel (coal) boiler (fuel 11, SAP code 153) on a
mains-gas street converts to a gas condensing boiler (fuel 11->26, code 102) —
the non-gas->gas path for a solid-fuel system, eligible because code 153 is in
the wet-boiler solid-fuel range 151-161 and mains gas is present.

New `boiler_flue_type` HeatingOverlay field, routed to main_heating_details[0]
and set to 2 (room-sealed/balanced) on both boiler shapes: every relodged after
lodges flue type 2, but coal's before lodged none. The field is SAP-inert (the
cascade score is unchanged by it), so it is written purely for end-state
fidelity — the overlay now represents the installed condensing boiler's flue.
Validated via the overlay-equality unit tests.

The coal after predates the user-locked "always add a cylinder thermostat when
absent" rule, so it stale-lodged thermostat 'N'; the pin corrects it to the
rule's end-state 'Y' in-test (the gas with-cylinder after got the same
correction by re-lodging). The cylinder is already 80 mm insulated, so the
jacket is skipped and only the thermostat is added; controls (2106) are
unchanged. Cascade-pinned delta 0 (SAP/CO2/PE).

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-10 08:27:07 +00:00
Khalim Conn-Kowlessar
7bc9797a26 test(modelling): pin non-gas->gas + already-insulated-cylinder boiler upgrades
Two more boiler-upgrade cascade pins, validating the existing generator across
fuels and cylinder states (no source change):

- oil combi: an oil boiler (fuel 28, code 130) on a mains-gas street converts to
  a gas condensing combi (fuel 28->26, code 104). Proves the non-gas -> gas
  conversion gated on a mains-gas connection (ADR-0024 revised).
- already-insulated cylinder: a gas boiler heating a pre-jacketed cylinder
  (type 2 / 80 mm, no thermostat) gets a new boiler + a thermostat, with the
  jacket NOT re-applied. Proves the cylinder path's skip-jacket branch against a
  real cert. (Sourced from an LPG re-lodgement whose fuel the Summary mapper
  reads as mains gas 26 — a separate LPG fuel-mapping gap, noted in the test.)

Both pin delta 0 (SAP/CO2/PE) against the relodged after.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-09 16:37:32 +00:00
Khalim Conn-Kowlessar
63dd69ff8b feat(modelling): gas combi boiler upgrade + controls-when-inadequate
Extend the gas-boiler-upgrade Option to combi (no-cylinder) dwellings and add
the controls upgrade shared by both boiler shapes. A dwelling has a cylinder or
it does not, so the one `gas_boiler_upgrade` Option is shaped per dwelling:

- no cylinder -> a gas condensing combi (Table 4b code 104), no cylinder fields
  touched;
- a cylinder  -> a regular boiler (code 102) heating it, with the conditional
  cylinder jacket/thermostat (slice 1).

Controls: bring an inadequate boiler control up to full programmer + room
thermostat + TRVs (SAP 10.2 Table 4e Group 1 code 2106). "Inadequate" = the
Group-1 codes with NO room thermostat (2101, 2102, 2107, 2108, 2109, 2111) —
these lack boiler interlock (Table 4c(2) / footnote c) p.171), so adding a room
thermostat genuinely improves SAP. Room-thermostatted (2103/2104/2105/2106/2113)
or better zone controls (2110/2112) are left unchanged — never downgraded, so
no phantom uplift. The with-cylinder cert (control 2106) is therefore untouched
and its pin still holds at delta 0.

Validated by the combi before/after re-lodgement (cert 001431, gas boiler
upgrade - no cylinder): control 2111 "TRVs and bypass" -> 2106, fan flue
False->True, SAP code 112 -> 104. Cascade-pinned delta 0 (SAP/CO2/PE). Removed
the slice-1 placeholder test asserting no boiler Option fires without a cylinder
(the combi Option now correctly fires there).

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-09 16:28:00 +00:00
Khalim Conn-Kowlessar
31c74ab500 feat(modelling): gas-boiler-upgrade-with-cylinder option in the heating rec
Add the first boiler-upgrade option to the single "Heating & Hot Water"
Recommendation (ADR-0024 expansion): a dwelling whose existing wet boiler heats
a hot-water cylinder is offered a new gas condensing boiler, with the cylinder
jacketed when under-insulated and given a thermostat when absent. One competing
Option (the Optimiser picks <=1), folded into one composite Plan line.

The end-state is read from the Elmhurst before/after re-lodgements (cert 001431,
gas boiler upgrade - with cylinder), which REVISE ADR-0024:

- Target is always a gas condensing boiler, not fuel-preserving: every after
  lodges fuel 26. Gas->gas always; a non-gas wet boiler ->gas only with a
  mains-gas connection; electric boilers are left alone (electrification is the
  upgrade path). Eligibility = wet-boiler SAP code (Table 4a/4b 101-141 /
  151-161 / 191-196) + not an electric boiler + mains gas present.
- End-state is a Table 4b SAP code, not a PCDB index: code 102 (regular boiler
  + cylinder). The calculator derives the condensing seasonal efficiency from
  the code, so no efficiency input exists or is needed.
- A modern condensing boiler has a fanned flue: the after flips
  `fan_flue_present` False->True on every cert (SAP 10.2 Table 4f flue-fan +
  the Table 4b condensing-efficiency basis). Added as a new HeatingOverlay
  field, routed to main_heating_details[0].
- Cylinder thermostat is always added when absent (user-locked); the jacket is
  the 80 mm `cylinder_insulation_type=2` end-state, applied only when the
  cylinder is below 80 mm (never downgrading a better one). Both are conditional
  per-dwelling components, not a frozen overlay.

Cascade-pinned delta-0 (SAP/CO2/PE) against the relodged after via
`_assert_overlay_reproduces_after`. NB the absolute SAP on this dwelling is
subject to a separate Summary-path mapper roof-fidelity gap (we read the roof
better-insulated than Elmhurst, scoring ~75 vs the printed 56); the gap is
identical on before+after (the boiler measure never touches the roof) so it
cancels and the pin still proves the exact heating field-delta. Tracked on the
calculator branch.

Wires the new `gas_boiler_upgrade` MeasureType through contingencies (0.26),
the offline sample catalogue, the catalogue-coverage list, and the ARA
first-run integration seed (the option fires on any mains-gas boiler+cylinder
dwelling).

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-09 16:16:46 +00:00
Khalim Conn-Kowlessar
2f3b1dbd3f test(modelling): Solar PV Elmhurst cascade pins + battery tripwire
Slice 9 of the Solar PV Recommendation Generator (ADR-0026). Pins the
overlay→calculator PV cascade against Elmhurst's before/after re-lodgements of
cert 001431, across the orientation/pitch/overshading config space (the certs
lodge synthetic 1.00 kWp test vectors):
 - SE/SW, shaded (overshading 3/2), pitch 30°/45°
 - E/W, unshaded, pitch 60°/45°
 - NW/N, unshaded, pitch 60°/45° (the low-yield orientations)
Each hand-built SolarOverlay reproduces the relodged after at abs ≤ 1e-4 on
SAP / CO2 / primary energy.

Battery tripwire (per user): the "with battery" cert lodges a §19 5 kWh battery
the current extractor does NOT parse, so it scores identically to its
no-battery twin — the no-battery overlay reproduces it today, and the pin will
fail (alerting us to switch to the with-battery overlay) once the extractor
parses the battery. A companion test pins that the calculator already models
the 5 kWh battery (it raises SAP), so the fix target is established.

All five certs share an EES 'WGK' / SAP-code-502 main-heating lodgement the
mapper doesn't yet derive a fuel for; the pins patch the shared fuel (mains gas
26) identically on before+after to isolate the PV delta (the solar overlay
never touches heating), and `test_solar_before_baselines` xfails as the
forcing-function tripwire for that separate mapper-front gap.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-08 12:42:24 +00:00
Khalim Conn-Kowlessar
f31d5bcff9 feat(modelling): typed SolarPotential projection over Google buildingInsights
Slice 2 of the Solar PV Recommendation Generator (ADR-0026). Adds the
strictly-typed `SolarPotential` domain projection over the raw Google Solar
`buildingInsights` JSON that Ingestion persists (SolarRepository): the
`solarPanelConfigs` ladder, each rung broken into its roof segments with
Google's continuous azimuth/tilt mapped to the SAP octant
(`azimuth_to_sap_octant`, 0°=N clockwise → 1=N..8=NW, matching the
calculator's ORIENTATION_BY_SAP10_CODE) and RdSAP §11.1 pitch code
(`pitch_to_sap_code`, snap to {0→1,30→2,45→3,60→4,90→5}).

Pinned against the real London buildingInsights example (mirrored into
fixtures from the user-provided RTF): 400 W panels, maxArrayPanelsCount 49,
46-rung ladder, per-segment SE/NW/NE/SW octants at ~32° → pitch code 2.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-08 09:55:55 +00:00
Khalim Conn-Kowlessar
11fb82b485 test(modelling): pin boiler-1/2 ASHP to the Vaillant overlay snapshot
The boiler-1 and boiler-2 after-certs predate the Vaillant product swap (they
lodge the old aroTHERM index 101413), so rather than wait on regenerated certs
these now snapshot the Vaillant overlay's own output on the before (SAP/CO2/PE
at 1e-4), taken as correct because the same overlay reproduces the corrected
Vaillant cert at delta 0 in the boiler-3 (system-boiler) pin. Drops the xfail
markers and the two stale, now-unreferenced after-cert fixtures.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-07 20:16:58 +00:00
Khalim Conn-Kowlessar
32f1916619 test(modelling): finalize Vaillant ASHP swap on the cascade pins
The representative heat pump is now the Vaillant aroTHERM plus 5 kW (index
110257, committed with the generator). boiler-3's after-cert is re-sourced from
the corrected Vaillant relodgement and its cascade pin passes at delta 0
(SAP 63.85 -> 72.30). boiler-1 and boiler-2(instant-HW) pins are xfail pending
their own corrected Vaillant after-certs (_ASHP_PRODUCT_REPIN_REASON).

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-06 21:33:09 +00:00
Khalim Conn-Kowlessar
d9c7638b3c test(modelling): ASHP from a system gas boiler with an existing cylinder
Pins the cylinder-OVERWRITE path the earlier ASHP pins did not exercise:
boiler-1/boiler-2 added a cylinder where none existed, whereas boiler-3's
before is a mains-gas regular boiler (SAP code 101) that already heats its
own cylinder (size 2 / insulation type 2 / 80 mm). The fixed _ASHP_OVERLAY
overwrites it to the heat-pump cylinder (size 4 / insulation type 1 / 50 mm)
and switches the dwelling off mains gas (fuel 26->30, code 101->index 101413
+ category 4). The existing overlay reproduces the re-lodged after at delta 0
on SAP / CO2 / primary energy -- no overlay change needed; immersion_heating_
type is None in both, so that field (the electric-with-cylinder case) is
untouched here.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-06 18:20:58 +00:00
Khalim Conn-Kowlessar
ec76acc3d8 test(modelling): ASHP pin from a gas boiler with instantaneous HW + fuel tripwire
Second ASHP before/after (boiler 2): a gas boiler whose hot water is electric/
instantaneous (water-heating SAP code 909, no cylinder). The cascade pin passes
at 1e-4, exercising the overlay's water_heating_code reset 909 -> 901 that the
boiler-1 pin (already 901) did not. (After lodges control 2209 vs the overlay's
2210 — SAP-equivalent zone controls.)

Adds an xfail(strict) tripwire test_gas_boiler_instant_hw_before_baselines: the
raw before is not scorable on its own because the mapper maps the 'BGB' gas-
boiler EES code to an empty main_fuel_type (boiler-1's 'RGE' resolves to 26),
so Sap10Calculator raises MissingMainFuelType. Harmless to the pin (the overlay
overwrites fuel -> 30); flips green when the mapper derives mains gas from the
gas-boiler SAP code (separate mapper-front fix). ADR-0024.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-06 17:40:25 +00:00
Khalim Conn-Kowlessar
a1fc697d93 test(modelling): ASHP before/after cascade pin (001431) at 1e-4
A typical mains-gas combi house re-lodged as an air-source heat pump closes at
1e-4 (gas-boiler 1 example from the technical specialist). Closes one named gap
the pin surfaced: a whole-system replacement to a PCDB-indexed system left the
old Table 4a sap_main_heating_code (104) beside the new heat-pump index, and the
stale code won the calculator's efficiency dispatch (hot water billed at boiler
not HP efficiency, ΔSAP 3.98). _fold_heating now enforces the mutual exclusion
of the two efficiency anchors (setting an index clears the SAP code and vice
versa). Also fixed a pre-existing pyright annotation in the lighting applicator
test. ADR-0024.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-06 17:01:40 +00:00
Khalim Conn-Kowlessar
b3badc9b10 test(modelling): HHRSH before/after cascade pins (001431) at 1e-4
The same absolute-target HHR overlay reproduces the common relodged after from
two different base systems (existing electric storage; "no system present"
electric) — proving the bundle is a true whole-system end-state. Closes one
named gap the pin surfaced: the relodged HHR cylinder lodges
cylinder_thermostat='Y', so HeatingOverlay + _fold_heating + the HHRSH overlay
gain cylinder_thermostat (ΔSAP 0.065 -> <1e-4). ADR-0024.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-05 19:09:23 +00:00
Khalim Conn-Kowlessar
ca397e1e3f test(modelling): lighting before/after cascade pins (001431) at 1e-4
Slice 3 of the lighting generator (ADR-0023): two real Elmhurst before/after
cascade pins, sourced from the low_energy_lighting recommendation folder. Both
close cleanly at 1e-4 with NO xfail — lighting changes only bulb counts →
Appendix L (232), no fabric coupling (contrast glazing's draught-proofing).
  - zero existing LEDs: 20 incandescent → 20 LED
  - some existing LEDs: 5 LED + 15 incandescent → 20 LED (partial-upgrade path)
The overlay-emits-correct-counts assertion lives in the Slice 2 unit tests.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-05 12:27:36 +00:00
Khalim Conn-Kowlessar
3d738bd4c6 test(fixtures): add glazing before/after certs (001431) for the pin slices
The double_glazing / secondary_glazing Elmhurst before→after Summaries the
glazing generator's cascade pins will use (ADR-0022). NB: these don't parse
yet — cert 001431 lodges several unmapped glazing labels ("Secondary glazing",
"Secondary glazing - Normal emissivity", "Triple pre 2002", truncated
"Double…"/"Triple…" variants) that the mapper must cover first.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-05 07:54:43 +00:00
Khalim Conn-Kowlessar
13b18ce9fb feat(modelling): roof dispatcher insulates a flat roof
Slice 3 (ADR-0021). The dispatcher gains a flat-roof branch: a "flat"
roof_construction_type with no lodged thickness (uninsulated → None on the
Elmhurst path) gets a single flat_roof_insulation Option whose overlay raises
roof_insulation_thickness to 200 mm — tested before the loft fallback so a flat
roof's None doesn't trip the loft trigger. Pinned against the Elmhurst
before→after cert at 1e-4. Golden cohort roof firing unchanged (none across 57).

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-04 21:16:00 +00:00
Khalim Conn-Kowlessar
7d40cddf3b feat(modelling): fold loft into the roof dispatcher; thatch routes to loft
Slice 2 (ADR-0021). `recommend_roof_insulation` now owns the loft branch as the
fallback — a plain pitched loft, a thatched roof (the covering doesn't block
insulating the loft floor), or an unlodged roof type all take loft (joist)
insulation at 300 mm when `roof_insulation_thickness == 0`. Sloping is tested
first; a no-access roof gets nothing. Retired the standalone
`recommend_loft_insulation`; the orchestrator and its tests now call the
dispatcher.

Pinned: thatch before→after (None→300) reproduces at 1e-4; the existing loft pin
still holds through the dispatcher. Behaviour-preserving on the golden cohort
(roof measure unchanged: none across all 57) — the dispatch is strictly more
precise (won't fire loft on a sloping/no-access roof).

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-04 21:12:01 +00:00
Khalim Conn-Kowlessar
6484610b6c feat(modelling): recommend_roof_insulation insulates a sloping ceiling
Slice 1 of the roof-insulation generator (ADR-0021). New `recommend_roof_insulation`
dispatcher keys on the `roof_construction_type` string: a "sloping ceiling" roof
that is uninsulated (roof_insulation_thickness 0/None) gets a single
`sloping_ceiling_insulation` Option whose overlay raises roof_insulation_thickness
to 100 mm. Pinned against the Elmhurst before→after cert 001431 at 1e-4.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-04 21:02:06 +00:00
Khalim Conn-Kowlessar
ea4534f3af feat(modelling): system-built walls take EWI+IWI (blocked on basement-code fix)
System-built (precast/no-fines concrete) takes both solid-wall Options like
solid brick (ADR-0019), keyed on `wall_construction == 6` (WALL_SYSTEM_BUILT,
Elmhurst `SY`). A basement-suitability guard (`main_wall_is_basement`) is added
since a below-ground basement wall is never EWI/IWI-suitable.

This is currently inert: `B Basement wall` also maps to 6 (mapper.py:2100) and
`main_wall_is_basement` is derived as `wall_construction == 6`, so every code-6
wall reads as basement and is guarded out — the live cohort is unchanged. The
system-built EWI/IWI cascade pin is committed as a strict-xfail tripwire that
flips green the moment the calculator disambiguates system-built from basement
(MAIN wall_construction==6 with main_wall_is_basement False). `wall_construction
== 8` is Park home, not system-built — not keyed.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-04 18:26:08 +00:00
Khalim Conn-Kowlessar
ac78771258 feat(modelling): solid-wall generator offers IWI-only for timber frame
Slice 2b. Timber frame (wall_construction=5) takes internal wall insulation but
not external (not constructable — ADR-0019), so the generator offers IWI only.
Cascade pin: the IWI Option reproduces the re-lodged timber-frame after at
abs(diff) <= 1e-4 (general Table 6 insulation-thickness bucket, not the solid-
brick documentary path).

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-04 15:33:46 +00:00
Khalim Conn-Kowlessar
68aa80c174 feat(modelling): overlay models solid-wall insulation (IWI/EWI), pinned
Slice 1 of solid-wall insulation. BuildingPartOverlay gains a
wall_insulation_thickness field; the generic applicator already folds it onto
SapBuildingPart by name. With wall_insulation_type=1 (EWI) / 3 (IWI) + 100 mm,
the calculator derives the post-insulation U-value (§5.8 documentary path,
λ=0.04 default) — and for IWI also lowers the thermal-mass parameter. Two new
Elmhurst before/after cascade pins (solid-brick EWI + IWI, cert 001431)
reproduce the re-lodged after at abs(diff) <= 1e-4 across SAP/CO2/PE.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-04 15:11:26 +00:00
Khalim Conn-Kowlessar
a0b6a952c3 feat(modelling): floor insulation-type overlay field + cascade pins (#1159)
Completes #1159 end-to-end with solid and suspended-floor before/after
cascade pins on cert 001431, both closing at delta 0.000000.

Adds floor_insulation_type_str to BuildingPartOverlay (the generic
field-fold applicator picks it up with no change) and has
recommend_floor_insulation set it to "Retro-fitted". Insulating an
as-built floor re-lodges its insulation as retro-fitted; the calculator
keys on this for a suspended timber floor's sealed/unsealed
determination (cert_to_inputs.py: "retro" + no U-value supplied →
sealed). Without it the suspended-floor cascade left a +1.40 SAP gap
(the floor stayed "unsealed", wrong U-value); with it the cascade
closes exactly. Solid floors are unaffected by the seal logic and stay
at delta 0; both Elmhurst after-certs lodge "Retro-fitted", so setting
it uniformly is faithful.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-03 09:41:54 +00:00
Khalim Conn-Kowlessar
44d62c0c9b feat(modelling): loft overlay 270→300 mm + Elmhurst cascade pin (#1158)
Completes #1158 end-to-end. recommend_loft_insulation now emits a
300 mm overlay (was 270 mm). The Elmhurst before/after re-lodgement of
the loft-insulation measure on cert 001431 lodges the after-cert at
300 mm roof insulation; pinning before→overlay→after requires the
overlay to match that depth — at 270 mm the cascade left a +0.173 SAP
residual, at 300 mm it closes at delta 0.000000 on SAP/CO2/PE.

Adds test_loft_overlay_reproduces_the_relodged_after and updates the
roof generator unit test's thickness assertion to 300.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-03 09:39:21 +00:00
Khalim Conn-Kowlessar
4c0a907a54 test(modelling): Elmhurst before/after cascade pin for cavity wall (#1154)
Closes #1154 — the Package Scorer's Elmhurst cascade pin. Drives
recommend_cavity_wall on the parsed `before` Summary, scores its
Option's overlay through PackageScorer, and asserts delta 0 (abs<=1e-4
on SAP/CO2/PE) vs the calculator's score on the re-lodged `after`
Summary.

Key finding: the handover's stated parser gate (parse_site_notes_pdf
throwing 'Manufacturer' on cert 001431) does NOT block these pins. The
Elmhurst recommendation Summaries route cleanly through the same
ElmhurstSiteNotesExtractor + EpcPropertyDataMapper chain the worksheet
e2e fixtures use (_elmhurst_worksheet_001431.build_epc). The Textract
path's window bug is unrelated and unused here.

The before→after field change is exactly wall_insulation_type 4
(uninsulated) → 2 (filled cavity), which is precisely the overlay
recommend_cavity_wall emits; the cascade closes at delta 0.000000 on
all three metrics. Before/after Summaries mirrored into
tests/domain/modelling/fixtures/ so the pin does not depend on the
unstaged workspace.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>